0% found this document useful (0 votes)
147 views1 page

Plan View of Juice Heater Location: Zambia Sugar+ Factory Department

This document shows a plan and elevation view of a proposed juice heater location at a sugar factory. It depicts the layout of four new juice heaters, along with their elevations, dimensions, and connections to existing infrastructure. Piping and equipment are shown, along with relevant elevations and dimensions. The drawing is scaled and includes notes about the client and statutory responsibilities.

Uploaded by

Vashish Ramrecha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
147 views1 page

Plan View of Juice Heater Location: Zambia Sugar+ Factory Department

This document shows a plan and elevation view of a proposed juice heater location at a sugar factory. It depicts the layout of four new juice heaters, along with their elevations, dimensions, and connections to existing infrastructure. Piping and equipment are shown, along with relevant elevations and dimensions. The drawing is scaled and includes notes about the client and statutory responsibilities.

Uploaded by

Vashish Ramrecha
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

17/7

17/8

17/9

EXISTING I.C.W PIPE

E
S

4000

2200

1800

1800

874

17/18

2700
2200

3130

4000

1300

474

577

AY

2550

+1031,233 T.O.S. LANDING

+1029,733 T.O.S. LANDING

09-15-110-HT1
CLEAR
JUICE
HEATER
No.3

4 - BANK
LEVER VALVE
+1028,233 T.O.S. LANDING

13600

2450

5000

09-15-115-HT1
CLEAR
JUICE
HEATER
No.4

09-15-100-HT1
CLEAR
JUICE
HEATER
No.2

2450

EXISTING PROCESS
BUILDING

7470

09-15-105-HT1
CLEAR
JUICE
HEATER
No.1

+1025,733T.O.S. LANDING

900 WIDE
ACCESS STAIR

+1023,233 T.O.S. LANDING

2470

577

2550

5000

09-15-100-HT1
CLEAR
JUICE
HEATER
No.2

10470

AZ

09-15-105-HT1
CLEAR
JUICE
HEATER
No.1

S.O.P
+1020,733 T.O.C.

17/7

17/8

4500

17/9

30 GROUT

874

474

PLAN VIEW OF JUICE HEATER LOCATION


SCALE 1:50

SUMP PUMP
1800

225 (REF.)

1800

4000

4000

2700

SOUTH ELEVATION
SCALE 1:50

ZAMBIA SUGAR+ FACTORY DEPARTMENT


PROJECTS + PLANNING

1 HOLWOOD PARK
5 CANEGATE ROAD
LA LUCIA RIDGE OFFICE ESTATE
DURBAN, SOUTH AFRICA, 4320

TEL: +27 (0)31 535 6000


FAX: +27 (0)31 535 6010
e-mail: [email protected]
website: www.boschprojects.co.za

STATUTORY NOTE:
THE CLIENT IS RESPONSIBLE FOR ENSURING COMPLIANCE TO ANY
LOCAL HEALTH AND SAFETY LAWS AND REGULATIONS
THIS DRAWING WAS PREPARED USING A CERTIFIED QUALITY MANAGEMENT
SYSTEM TO ISO 9001:2008

You might also like