Control & Instrumentation Department (4X600) : S. No. Description Unit # 1 Unit # 2 Unit # 3

The document summarizes the performance and status of various control and instrumentation systems across three power plant units for the month of December. Key points include: Unit CMC and SWAS instruments were unavailable for some units; stack monitoring equipment was unavailable for one unit; UPS systems were reported as OK across all units; total auto loops ranged from 74-92 across units with some units having some auto loops out of service; and modifications were made to equipment like adding an auto drain valve to an air receiver tank and configuring lift alarms on the DCS.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
54 views3 pages

Control & Instrumentation Department (4X600) : S. No. Description Unit # 1 Unit # 2 Unit # 3

The document summarizes the performance and status of various control and instrumentation systems across three power plant units for the month of December. Key points include: Unit CMC and SWAS instruments were unavailable for some units; stack monitoring equipment was unavailable for one unit; UPS systems were reported as OK across all units; total auto loops ranged from 74-92 across units with some units having some auto loops out of service; and modifications were made to equipment like adding an auto drain valve to an air receiver tank and configuring lift alarms on the DCS.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 3

PLANT PERFORMANCE December 15

CONTROL & INSTRUMENTATION DEPARTMENT(4X600)


S.
No.

Description Unit # 1

Unit # 2

Unit # 3

Unit CMC not available

Available

Not Available

Not Available

ATRS availability

Available

Available

Available

Major protection not in


service

All in
service

All in service

All in service

SWAS instrument not


available

Available

Available

Not Available

Stack monitoring
equipment not available

Available

Available

Not Available

Any other instrument not


Available
available

Available

Available

OK

OK

7
8

UPS system healthiness


No. Of

OK

38/38

CONTROL &
INSTRUMENTATION
AUTO LOOPS
STATUS
Unit - I

Unit - II

Unit - III

Total number of auto loops


Total number of auto Total number of auto
- 92
loops - 92
loops - 92

Unit

In Service

UNIT - I

88

UNIT -II

87

UNIT -III

74

MODIFICATION
Equipment Name

Existing Logic

Modification

Reason
It may be use to improve

Clinker detection
Slagging is a serious problem in the
using acoustic
boilers of thermal power plants which
steam leak
may result in forced outage
detector
UNIT#1 MRHS

Auto Drain Valveair Receiver tank

Air line modification done for


conveying air

New auto drain valve mounted in MRHS


receiver tank

combustion efficiency, It gives


an early indication to the
operator and management
enabling them to take
preventive and corrective
action

Always faced problem in


MRHS conveying air line
choking

For removing condensation

MRHS
Lift alarm
configuration on
DCS

Switch is commissioned in LIFT

It give alarm to
Control room if
any one press