Save Cathodic Protection Survey Method For Later ‘ Paper No. CORROSION
5
729
DEEPWATER
www.stoprust.com
CATHODIC PROTECTION SURVEYS OF OFFSHORE PLATFORMS -
‘ANEW APPROACH
Britton
Deepwater Corrosion Services Inc.
7007, Winding Walk
Houston, TX. 77096
ABSTRACT
Historically, cathodic protection (CP) surveys of offshore platforms have been comprised of a number of
steel to seawater potential measurements recorded at selected points on or around the structure. Little or no
emphasis has been placed on evaluation of the “resilience” of the CP system; i.e. how hard is the system
working, how efficiently, and how much longer will it continue to provide efficient protection. The new approach,
which has been used by some operators since 1989 in the Gulf of Mexico, addresses some of these areas
without significant increase in the time required to perform the inspection.
Keywords: offshore, cathodic protection, potential measurement, galvanic anode current measurement, ROV,
underwater inspection, diver inspection.
INTRODUCTION
In the Gulf of Mexico and in many other offshore producing areas, government regulations require that
CP systems on offshore platforms are surveyed periodically to verify the adequacy of protective potentials’. In
the Gulf of Mexico, most operators perform an annual “drop cell" survey and a diver or Remotely Operated
Vehicle (ROV) subsea inspection every three to five years. These surveys are usually performed as a part of a
larger scope of work which involves other structural inspections and non-destructive testing.
Drop Cell Surveys.
‘The drop cell survey is performed from the surface and requires that a reference electrode is lowered
through the water column adjacent to the platform structure. Readings are recorded at predetermined depth
intervals at various locations around the structure. This method is quick and inexpensive, it wil give some
indication of the surface potentials on the structure. They will not be accurate due to the fact that the referenoe
‘electrode could be remote from the structure, however, the readings obtained do give a good general indication
as to the protective status of the structure. Potentials recorded are generally optimistic so far as cathode
potential is concerned; errors typically range between (-)0.02 and (-)0.06 Volts vs Ag/AgCl, depending on sea
Conditions, water depth and the protective level of the structure. It is fair to say that if a well conducted drop cell
survey indicates marginal protective levels, then in most cases, a detailed survey would reveal areas which were
below protected criteria. Figure 1. shows a typical silver/siver chloride drop cell. Figure 2. shows a typical
survey report from such a survey.
Copyright
(©1986 by NACE international, Requests for permission to publish this manuseritin any fom n part or in whole must be made in witing to NACE
Intemational, Conteronces Divsion, P.O, Box 218340, Houston, Texas 77218-8340. The rnaterial presented and he views expressed in this
paper are solly nese ofthe author(s) and are nat necessarly endorsed by te Association. Printed in the U.S.A.SURVEY EQUIPMENT & PERSONNEL
Itis virtually impossible to perform an accurate CP survey with the wrong equipment or personnel. An
inaccurate survey could lead to serious consequences with either optimistic or pessimistic inaccuracy. The
writer's company has experienced this first hand, having arrived offshore with a dive boat loaded with new
‘anodes only to find that the original CP survey was flawed and that there was no need for a retrofit. Similarly an
optimistic survey could result in corrosion damage to the structure. The most common error sources for
diver/ROV assisted surveys are:
Inexperienced Survey Personnel
Poor Quality Silver Chloride Reference Electrodes
Damage to Electrode Lead Wire Insulation from Barnacies
Poor Reference Ground Connection
Data Transfer Error
Personnel
‘One amusing (not for the customer) inspection report viewed by the writer had a beautifully laid out
report, with hundreds of “potential” readings all recorded in OHMS. If a problem develops it is imperative that
the survey data recorder is instantly aware that a problem exists and is trained to take the appropriate corrective
action. If a system is obviously marginal or below protected levels, the data recorder should have the ability to
collect sufficient information to allow accurate design of a retrofit without having to re-survey.
Reference Electrodes
Silver/siNer chloride reference electrodes should be used for offshore surveys. As incredible as it may
‘seem some specifications require the use of copper sulfate electrodes for offshore inspections. Electrode wires
become damaged during platform inspections, any exposed copper will immediately impart a positive shift to the
recorded potential, the magnitude of which will depend on the location and size of the exposed defect. For this
reason its important to use twin element electrodes connected to a dual voltage readout (Figure 3.). In this way
any damage to the lead wire will be instantly shown on the calibration meter, and the survey can proceed with
the good electrode The electrode should then be replaced for the next dive. The newer high porosity electrode
‘elements perform much better than the old wire dipped type. Of course the design of the electrode housing is.
important to ensure that the location of the reading is known. Don't use a randomly perforated drop cell for
precision surface measurements, use either an open ended probe design (Figure 4.) or a probe with calibrated
access perforations (Figure 5.).
Recording Instruments
Figure 3. shows a typical wiring schematic for a good survey set-up. Note that there is a dual digital
voltmeter display which allows calibration to be monitored both on the electrodes and on the voltage
measurement system. The master potential is parallel read through an analog to digital converter directly into a
laptop computer. All values can be monitored at all times during the survey, the A-D converter and computer
allow error free recording of the large number of potentials required for statistical estimations made in the survey
analysis stage. This setup is particularly valuable if an ROV survey is being performed, as any signal
contamination from ROV leakage currents or corruption in the high voltage umbilical cable will be instantly
recognizable and can be corrected.
‘SURVEY METHOD
This section describes some basic survey methodology, where the readings are taken and how they are
logged in the field. ‘The next section wil deal with data analysis and reporting. The locations described are
optimum. In most field situations itis not possible to achieve exactly the locations required but the more data
logged the better for statistical analysis.In recent years, the accuracy and repeatability of drop cell surveys has been improved by moving to sintered
reference electrode construction and by using dual element electrodes for in-survey calibration.
Diver and ROV Assisted Surveys
Typical diver or ROV survey specifications will require that structure to seawater potentials be recorded
at all major structural joints (nodes), and at selected locations (often a mid-point) on other members.
Normally the main legs will have a potential taken at pre-described depth intervals (10 feet is commonly used).
Itis rare (but becoming less s0) to See specifications which require any potential measurements on anodes or
which require that anode current output be measured. Similarly, it is not usual to see requirements for the
precise position of the reference electrode during these measurements. Occasionally one will see ‘within two or
three feet of the structure” or ‘in close proximity to the structure” but rarely “on the surface of the structure”
Which does actually reflect the true potential value.
‘THE NEW APPROACH
To call the survey method a new approach Is possibly a misnomer, the methodology was pioneered by
‘one operator as long ago as 1989° with the writer's company providing field data recording services. Since
these early beginnings, the system has been refined, instrumentation has been modified and many more
surveys have been performed. To understand the new survey method, it is necessary first to understand the
added value of a good CP survey over a marginal one. This requires determination of what happens to the CP
inspection data once it has been collected.
Why Are CP Surveys Performed?
From the corrosion engineer's standpoint, the reasons are, in no particular order:
Regulatory Compliance
Verification of Protection Levels
Verification and/or Refinement of Design Criteria
Planning of Future Maintenance (Retrofis)
The first two points can be achieved with a simplistic survey provided that it is accurate, the new
approach provides a method for satisfying the second two points by giving the corrosion engineer the following
additional information at little or no extra cost!
* Anode Current Output Information
* Cathode Current Density Information
‘The addition of this information, being able to equate a current density to a potential response, gives the
missing element of “resilience” described in the abstract to this paper. The “resilience” is an indicator of how
well the system was designed, how close to specification the anodes are performing, how much longer the
system will be able to maintain the structure at a protected level and, with this information available on a time
base, will provide guidance on the optimum time to effect a system retrofit.
The New Approach Summarized
In summary the new approach involves the measurement of large numbers of potential values on the
CP system - both anode and cathode areas are surveyed. All measurements are recorded at known locations
on the surface of the structure. The absolute accuracy of the recorded data are assured by using on-line
bration of high accuracy survey equipment, and by using direct digital data recording to reduce human error
‘on data transfer from display to paper/computer. Other historical information on the structure (original CP
design information, surface areas, age of structure etc.) is fed into a computer once back onshore. Algorithms
are applied to the gathered data to estimate current output of all anodes surveyed. These statistics are applied
to the whole structure, and current density data are derived, Physical measurements on selected anodes are
input to allow remaining life extrapolation.
design information, surface areas, age of structure etc.) is fed into a computer once back onshore. Algorithms
are applied to the gathered data to estimate current output of all anodes surveyed. These statistics are applied
72913Measurement Locations.
Of course there are some offshore structures which are non-conventional (TLP’s, Compliant Towers,
SPARs, FPSOs, etc.) these structures can benefit from the procedure but locations will be structure specific.
‘The listing below reflects the “average” Guif Of Mexico combination driling/production platform
‘Survey Procedure General Considerations. Plan each dive and decide which anodes and members
will be surveyed, as a guideline the following scope is recommended. Variations in percentages may be made
based on quality of observed data; similarly survey locations may vary depending on safe access. Perform all
CP survey dives prior to any subsea cleaning operations which may depolarize the structure. For convenience
the information is tabulated below (Table 1). ‘The major requirement is that the reference electrode is held with
the open end in CONTACT with the member or anode being surveyed. The glove mounted probe may be used
to assist in electrode placement (Figure 4). The data recorder should be aware of when a scan is beginning and
ending, thus itis imperative that the inspection diver has elther a helmet or CP probe mounted video camera.
‘Scan speed is unimportant but should be maintained at a generally constant speed. “Platform Level’ refers to
subsea steel work located between main horizontal framing elevations.
TABLE 1
RECOMMENDED EXTENT AND LOCATION OF SURVEY
Structural Extent of
Element Inspection ‘Scan Orientation _Notes
Main Legs. 100% from (-) 10'0" to Outboard side. Node crotch readings may be
mudiine, taken if required, not required for
this procedure. Scan all leg an-
odes if ited.
Risers 100% from (-)10'0" to Orientation Ensure ground connection on cor-
mudiine. Unimportant. tect side of insulating device if fit-
ted.
Conductors (One vertical scan in Orientation Try to select a shielded conductor
(if installed) conductor area over Unimportant. ‘on the inside of the bundle.
entire platform depth.
Vertical, Horizon- 25% of anode carry- 90° from anode ori- If anodes installed at 6 o'clock,
taland Vertical ing members at each entation iffitted, if scan at 3 or 9 o'clock.
Diagonal Fram- platform level ‘no anodes orienta-
ing, tion unimportant
Skirt Piles and 25% of guides over Outboard side. Use tip contact probe to stab ex-
Guides (If In- entire length to mud- posed pile above guide if speci-
stalled) line. fied
‘Anode (Scans) At least 25% of ‘Scan face furthest If scan is difficult point read at ei-
anodes at each from supporting _ther end and in center of selected
platform level member. anodes.
Anode (Cleaning) At least 2 anodes per Clean (Water Blast) Select anodes for cleaning based
platform level. In- one end 6" and _—__on potential surveys, pick one
crease to 4.on 8 pile center 12" band full high and one low at each level.
structures on >200 circumference.
feet of sea water.
723/4tials - For convenience a spreadsheet is used (Lotus 123). The survey software
includes a module fo allow potentials to be directly dumped into the spreadsheet at a user selectable rate. A
single keystroke toggles data entry on or off. Macros in the spread sheet error trap bad readings. The readings
will automatically scroll down columns unti interrupted, manual input into the spread sheet is possible during
data transfer for notations, etc.
‘A typical spreadsheet layout is shown below with actual data. (Table 2).
TABLE 2
‘SPREADSHEET INPUT TEMPLATE
POLASCAN INPUT TEMPLATE Ctr#Shit = Auto Log Readings
Ctrl#PgUp for EXAMPLE AlteShift = Stop Auto Log
Shift+Shift = Manual Entry
PLATFORM: ABC123-B PLAN ELEVATIONS: (ENTER WATER DEPTHS)
DATE: 05-31-96 1 ie ae ee
TECH: AJL 0 “186-218-253 -288
o SCAN 1 SCAN 2 SCAN 3 SCAN 4 SCAN 5 SCAN 6 SCAN 7 SCAN 8
‘START WD 218-218 «156-218-218 184-184-184
END WO. “156 156 288-156-156 -156«-156 = -184
MEMBER TYPE DB ANODE LEG VDB_ ANODE VDB_ ANODE HB
MEMBER ID BYAl BIAl Al B3-A3 B3A3 A3B3 A3.B3 A3.A4
CALIBRATE, 0.001 0,002 0.002 0.003 0.003
0.922 0.927 0.943 0.993, 0.961
0.922 10.927 -0,944 -0.990 0.960
-0.922 0.927 -0,944 “0.991 0.960
“0.922 0.927 -0.946 “0.990 0.960
0.922 0.927 -0.947 0.992 0.960
-0.923, 0.927 0.948 -0.987 0.958
0.923 10.927 -0.948 -0.981 0.957
“0.923 0.927 -0.948 -0.979 0.958
“0.923 0.927 -0.949 -0.978 0.987
0.923 0.927 -0.950 “097 0.957
0.924 0.927 0.952 “0.97 0.956
“0.925 0.927 0.952 -0.979 0.955
“0.925 0.927 0.953 “0.982 “0.984
0.924 0.927 -0.954 0.982 0.954
0.924 0.927 0.956 0.984 -0.954
0.925 0.928 0.958 70.985 -0.954
0.928 “0.926 -0.960 0.984 -0.953,
“0.928 0.927 0.959 “0.985 0.954
0.925 0.927 0.961 0.987 0.954
0.925 0927-0963, 70.988 -0.955,
“0.928 0928 -0.966 10.985 -0.954DATA ANALYSIS
‘The data analysis phase consists of the following steps:
‘+ Spreadsheet Organization
External Data input
‘Anode Current and Current Density Computation
‘+ Remaining Life Computation
+ Final Reporting
‘Spreadsheet Organization
The raw field data sheets are imported into an organization template which performs the following
functions and calculations, This is a macro driven process and takes only a few minutes for each field template.
Error trapping of all numbers.
‘© Organize data columns to always be in shallow to deep order.
‘© Generate single number anode and effective cathode potential list (the most negative
anode potential is returned and paired with the average cathode value at the ends of the
‘member to which the anode is attached
Prepares graphic output of all scans, sets limits to scale all scans on platform the same.
Prepares a tabular listing of scans.
External Data Input
Table 3. shows additional information which is required in order to perform a full data analysis along
with the source and the criticality of the information
TABLE 3.
ADDITIONAL SURVEY INPUTS
Inrormaion ‘Source Notes Crmeaurry
Date Installed ‘Company For platforms over 10 years old only the year is required, High
for newer platforms month required.
Framing Drawings Company Stick drawings 0. if surface area is known, otherwise High
dimensioned drawings will be required,
Original C.P. Company Surface area, current density and design life, these can Moderate
Design Criteria be back calculated but adds time to reporting phase.
rig. Anode Size Drawings Length, width, height, weight, core size. High
Orig. Anode No. Drawings Can be physically counted High
Original Alloy Company Can be deduced from survey. Low
Retrofit Company Details of retrofit when? number/type of anodes? High
Water Resistivity Database Deepwater has in-house database with this information. High
Scan Distance Observed Distance of probe from member (ROV surveys), or probe High
‘sensing correction distance.
Water Depth Measured General depth at which anode potentials are recorded. Moderate
Anode Consumption Messured Circumference, ping factor recorded on cleaned Moderate
anodes.
‘Anode Length Measured HighAnode Current & Current Density Computation
Each surveyed anode has current output calculated in the spreadsheet using the same calculations as
would be used to estimate the output of an anode in anew design. The oniy change is that the “2L rather than
the 4L" version of Dwight's Equation is used. This is based on field matched data described by Mateer’. Thus:
‘Anode Resistance R= (6/ 2pL) (IML / 0-1) OWMS. ee eiesinaitaene (OD)
where: r= water resistivity (W-cms)
‘anode length (cms)
effective anode radius (cms)
r
Resistance is applied to Ohm's law to estimate current output:
Anode Current VIR 2
where; V = Effective driving voltage (Anode potential minus cathode potential)
‘Anode resistance from equation (1)
Current Density is simply computed by dividing the total current output for each level of the structure by
the surface area of exposed stee! in that same area: this will give an average current density.
Finite accuracy of these derivations is estimated to be +/- 15%, but the relative accuracy is much better
than this and can give excellent comparisons between different platforms and different areas on the same
platform. Current losses to steel below the mudiine are ignored when computing current density on the lower
clevations of a structure. This results in higher than actual numbers in this region but we have no good basis for
how to correct this at this time.
Remaining Life Computation
Using the information on how long the anodes have been in service combined with the calculated
current output above, with a correction made for increased output during the polarization period, the total
number of ampere-hours delivered to date is estimated. An efficiency of 1100 ampere-hours/ib. is used to
estimate the weight which should have been consumed. This number is compared to the weight loss based on
physical measurement. If these values agree within +/- 20%, the remaining life to 90% consumed is calculated
by straight weight loss/year extrapolation. If numbers do nt agree within +/- 20%, no remaining life estimate is
‘made for that anode.
Passive or low potential anodes are not considered (operating potential below (-)0.930 V vs Ag/AgCl
‘would be considered abnormally low). Any remaining life computation giving a result in excess of 20 years is
reported as >20 years, rather than the actual value.
Final Reporting
reporting will provide the following:
‘Anode current / potential.
Graphs of all anomalies or areas of interest.
Disk containing all graphs for viewing
Potential summaries by level,
Current density by level.
Estimated remaining life by level.
nemSUMMARY
The survey method described can be achieved offshore with litle or no cost increase over a regular
potential survey. The additional information can be used to plan retrofits more accurately’. The surveys are
also showing CP designers how conservative early Gulf Of Mexico design criteria are (also how unpredictable
early anode quality was). As we gather more information and begin to use new CP design methods’, the
importance of these types of survey will emerge and will encourage further improvements in the technology.
REFERENCES
1. American Petroleum institute API- RP2A “Recommended Practice for Planning, Designing and
Constructing Fixed Offshore Platforms” Section 14.0
2. M.W. Mater “Often Ovelooked Data Available from a Typical Offshore Subsea Survey,”
CORROSION/S1 Paper No. 233
3. MW. Mater, KJ. Kennelley. “Designing Anode Retrofits for Offshore Platforms,”
Materials Performance Volume 33 No. 1 (January 1994)
4. WH. Hartt, S Chen, D. Townley. "Sacrificial Anode Cathodic Protection of Steel in Sea Water
CORROSION/S7 Paper No. 474
~~ zee, atau,
FIGURE 1 - Typical Silver/Silver Chloride Drop Cell Survey Drop Cell on LeftCathodic Protection Drop Cell Inspection
(CLIENT: DINO-OIL Co. INSPECTOR: | JNB/PL
PLATFORM: —_|KC154-B CELL TYPE: | TWIN Ag/AgCl
DATE: 623/97 METER MODEL: |Mukitupa 32
WATER DEPTH: |250° JOB NUMBER: | ABD-1234
Potential ()mV vs Ag/AgCl vs Depth
[Survey |Element | Riser MMS [Riser mV
Location or APLID O/C 10 | 25 | 50 | 75 | 100 125 | 150 | 175 | 200 | 225 | 250
LEG [aa 1012 | 1015 1017 [1016 |1015 1014 | 1014 | 1074 [1074 | 1015 |1014
J-TUBE |A4B4 |RO2RO4 0 1012 |1015 |1017 |1016 |1015 |1014 | 1014 |1014 [1014 | 1015 | 1014
LEG [BIE ea | [1011 {1013 "1014 [1016 | 1014 1013 |1013 | 1015 [1014 | 1015 | 1016
RISER |BI-Al__|KAH-K270 063 __|1074| 1076 1077 |1079 |1077 |1076 | 1076 |1078 [1077 |1078 | 1079
ae 1014 | 1019 |1025 | 1027 [1025 | 1024 | 1025 |1024 | 1023 |1022 | 1023
RISER [A2-A1__/KAH-0611 |-029 | 1043 |1048 1054 | 1056 |1054 | 1053 | 1054 | 1053 [1052 | 1049 | 1049
| ;
[Gaivraten PreSener][ 000m] Catraton FoveSurvey J[ 000m]
Platform Layout Diagram
Figure 2. Typical Drop Cell Survey Report
72919ELECTRODE 01
Paani ro
contact ti
J ft conracr
J Execrent or
Zecectrooe 01
Figure 5, Open Ended Probe Mounted on Glove For Diver Use
72910Figure 5. Tip Contact CP Probe for ROV Use
729/11