This document provides a welding procedure specification for welding low alloy steel pipes with thicknesses ranging from 3/4 to 2 inches. It specifies the welding processes, joint design, base and filler metals, preheat and interpass temperatures, welding parameters, and post weld heat treatment requirements. Key information includes: - The root pass will be completed with gas tungsten arc welding and subsequent passes with shielded metal arc welding. - Groove joints with a 37.5 degree bevel will be used. - Low hydrogen electrodes and gas shielding will be used. - Preheat and interpass temperatures must be maintained at a minimum of 300 degrees Fahrenheit.

Uploaded by

Sarah Dean
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
777 views1 page

WPS PDF

This document provides a welding procedure specification for welding low alloy steel pipes with thicknesses ranging from 3/4 to 2 inches. It specifies the welding processes, joint design, base and filler metals, preheat and interpass temperatures, welding parameters, and post weld heat treatment requirements. Key information includes: - The root pass will be completed with gas tungsten arc welding and subsequent passes with shielded metal arc welding. - Groove joints with a 37.5 degree bevel will be used. - Low hydrogen electrodes and gas shielding will be used. - Preheat and interpass temperatures must be maintained at a minimum of 300 degrees Fahrenheit.

Uploaded by

Sarah Dean
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ECPL

MTS/INSPECTION
WPS NO.

SUPPORTI NG PQR NO

10

___

W E L D IN G P R O C E D U R E
S P E C IF IC A T IO N

DOC NO. MTS/QR/


Rev.0

WPS

cc: Equipment File

APPLICABLE CODE

WELDING PROCESS(ES)/TYPE

Title

ASME-IX & B31.3

GTAW (Root) / SMAW


(Subsequent) / MANUAL

ENTIRE PLANT FACILLI TIES

J O IN T S

Joint Design

Groove

Backing strip

Fillet

Yes

10

No

37 1/2 deg

2 1/2deg

Backing Material(Type)

NA

Position of groove

ALL

Weld progression

UP HILL

19 mm
1/8"

1/32"

1-1/16"

1/32"

BASE METAL

Material ( Low Alloy Steel, Cr > %)

To

P.No.

Group No.

P.No.

Group No.

Thickness range: From (19mm)

To 2 (51mm)

Pipe dia range:

To

From

ALL

ALL

All P-4 Materials : ASTM A-213 T12 & T11, A-335 P11 & P12, A-250 T11, A-234 P11 & P12 etc.
F IL L E R

M ETAL

Root Pass

Subsequent Passes

3/32

1/8

Size
Electrode

F.No.

A.No.

SFA-

AWS

Bare Rod

F.No. 6

A.No. 3

SFA- 5.28

AWS ER80S-B2/L F.No.

Electrical
characteristics

F.No. 4
---

SFA -5.5

AWS E-8018 B2/L

A.No. ---

SFA----

AWS ---

Amps( Range)

80 ____120 (Tungsten Electrode)

Amps( Range)

110--150

Volts( Range)

15*

Volts( Range)

2426*

Current

AC

Polarity

(Tungsten Electrode)

Reverse

DC

Current

Straight

Polarity

Yes

AC

DC

Reverse

Straight

G as

P re h e a t

Applicable

A.No. 2

No

Type of gas

Argon

Purity of gas

Prior to root

300 Min

Sheilding

Yes

Interpass

300 Min

Backing/ purging Yes

Final Welding

---

Tungsten electrode AWS ; EWTh 2

99%

No

No

Size : 3\32

P o s t W e ld H e a t T re a tm e n t

Applicable
Max. Temp.

1300 to 1375

Heating Rate upto

500 F

Heating Rate (b/w)

500 to 1375

F
No Rate
350F / hr

Yes

No

Holding time

1 hr / inch

Cooling Rate (b/w)


Cooling Rate ( below)

1375 F (Min 2 hrs)

1375 to 500 F

350 F / hr

500F

Instructions:

No Rate

All low Hydrogen electrodes should be used from fresh container. If not possible, bake in oven @ 400F for two hours prior to applying for welding.
This procedure is applicable to the above mentioned factors only, any change if made should be notified to Inspection. Contact inspection for any
clarification.
Welding electricity characteristics are as per LINCOLN Spec.
*For constant voltage welding, Voltage will be welding machine specific.

Comments:

Inspection requirements will be communicated at the time of Production / repair of welds.