(Balochistan) : Composite Schedule of Rates
(Balochistan) : Composite Schedule of Rates
MINISTRY OF COMMUNICATIONS
GOVERNMENT OF PAKISTAN
ISLAMABAD
JANUARY 2009
(BALOCHISTAN)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
FOREWARD
Following the increases in prices of materials and labour in the year 2008, the
revision / updation of CSR has been carried out. In the year 2008 we have seen the
prices of steel / diesel / bitumen go up considerably and towards the end of year
have come down. Analysts are still uncertain with the prices in the year 2009. For the
year 2009, we have carried out a general revision of all prices upto January 2009 in
consultation with leading manufacturer’s, supplier, and specialist contractors.
In the absence of standard fix formula the best engineering knowledge and rate
analysis practices are used to develop these rates. The variation in the proposed
rates is anticipated in certain cases, which may be due to varying degrees / levels of
productivity and price differences of various inputs at the regional level.
The rates, prices and outputs included in the resources and unit cost calculations,
including allowances for wastage, normal productivity and efficiency are based for
roadwork and bridge projects being carried out by NHA. The unit rates are average
unit rates for a particular district and not project specific. The market can change
very rapidly, which would obviously have an impact on the unit rates.
In the end, my appreciation to my team for all the possible technical and professional
efforts to produce Revised Composite Schedule of Rates 2009.
It is hoped that the CSR 2009, would serve as a Basic Engineer’s Estimate
Reference Document for National Highway Authority, various Government
Departments and the construction industry in general.
Whilst all efforts are made to ensure the accuracy of the data and information used
in updating the CSR , neither NHA or M/s Shabir Associates can in any way accept
liability for loss of any kind resulting from the use of CSR made by any person,
institution, company, department etc.
Muhammad Shabir
Q.S & Estimation Specialist
Shabir Associates
i
CONTENTS
1. General
2. Manpower List
3. Material List
4. Plants & Equipment Owning and Operating Cost
5. Quarry Sites
6. Conversion Factors & Technical Data
7. List of Districts
8. CSR January 2009 Item Rates
ii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
1. General
For many years National Highway Authority has been compiling / updating the
Composite Schedule of Rates for use in the Civil Engineering Industry. The
Civil Engineering Industry uses this Schedule of Rates for pricing work by the
application of unit rates to the quantities measured from the designer’s
drawings. The main objective of the CSR is to provide a realistic reference
base for cost estimates. One has to understand no two projects are the same,
there are variables which effect the price of the project i.e., the volume of work
below ground, embankment height, cut & fill, increased exposure to weather,
and the tremendous variety of the projects, in terms of type, complexity and
scale makes the straight forward use of unit rates less reliable. This
uncertainty is compounded by the lower number of bill items generated in Civil
Engineering Projects as compared to Building Works so that the precise
nature of work is less apparent from bill descriptions and the statistical effect
of ‘swings and roundabout’ has less scope to average out extremes of pricing.
The CSR does embrace the great majority of work undertaken by NHA.
Although almost all projects will have individual features that require careful
attention in pricing, there will be some projects that are so specialist that they
will not confirm to standard pricing information at all. But for most projects,
within the range of work covered, this CSR should provide a firm foundation
for:
iii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
Arbitration Matters
Updating the data inputs every year or from time to time, to revalidate the
item rates
2. GENERAL METHODOLOGY:
a. Composite Schedule of Rates was originally published in the year 1991 and
subsequent revisions were carried out in 1995, 2000, 2005, 2006 and 2008.
There are total of 91 Districts considered and are given numbers in
Alphabetical order and their Province wise breakdown as under:
Province No of Districts
Punjab 34
Sind 16
NWFP 21
Balochistan 20
b. These rates are based on the existing formulae and efficiency levels used in
the preparation of CSR 2005, 2006 and 2008 with some modifications.
c. The rates analysis of individual items of CSR 2009 consists of four basic
inputs, which have been assigned the same code numbers as in the previous
Composite Schedule of Rates.
iv
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
ii. NHA Composite Schedule of Rates 2005, 2006 & 2008 and its basic data
Code list of Manpower, Material and Equipment appear at the end of the
chapter for the convenience of the users.
2.1 MANPOWER:
b. Formulation of Rates:
Manpower basic rates collected from districts have been first scrutinized, to
eliminate irrational information and following overheads are applied to include
fringe benefits and other charges:
v. Bonus (Compulsory)
After including above overheads, manpower rates for each of the 91 district
have been calculated and separate records developed for use by the
Computer Program.
v
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
List of materials required for road construction has been first prepared from
the construction items appearing in the General Specifications of National
Highway Authority. After arranging the construction material list in order, code
numbers have been allocated.
b. Formulation of Rates:
c. Cost of Material
d. Cost of Transportation
The list of plant and equipment includes major equipment whereas small
equipment, tools and attachments are ignored, as these have been charged
under the item of overhead. After arranging the list in order, code numbers
have been allocated starting from 3001 (onwards).
vi
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
To arrive at the decision for choosing the right horse power, appropriate
performance level and reasonable maintenance charges, the
recommendation of well known suppliers have been considered. In order to
decide the price level of any equipment, average cost has been used, which
includes C&F price, plus duties and taxes etc.
The owning and operating costs are similar for all the districts, unlike
manpower and materials where rates may differ for each district.
The owning and operating costs are developed by using a standard format.
The duties and taxes have been calculated as per the latest Excise and Land
Customs Tariff for calculating total cost of equipment.
Fuel consumption, working efficiency and maintenance costs have been fixed
after consulting the recommendation of the manufacturers. Equipment
economical life and tire life have been fixed after consulting several
organizations using heavy and light equipment in the present indigenous
conditions.
The owning and operating costs for 80 types of equipment is provided at the
end of this chapter.
All the basic inputs have been updated in the individual rates analysis. These
formulae have been created by appropriate quantitative inputs of the following
items.
a. Profit
An addition to the estimate needs to be made to the net estimate to cover all
costs incurred in operating the central services provided by head office. Apart
vii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
from general management and accountancy, this will normally include the
departments dealing with:
Tendering / Estimating
Planning & design
Wages and bonus
Finance Cost:- Some companies would include finance costs with head office
overheads, but this will vary from contractor to contractor.
The appropriate addition varies with the extent of services provided centrally
and company to company, rather than on site, and with size of organization.
c. Preliminaries
Generally contract document give detailed requirements for the facilities and
equipment to be provided for the employer and the Engineer’s Representative
given in the Bill of Quantities. Thus General Items given in the BOQ are
excluded from the check list of preliminaries.
Plant Maintenance
Vehicles / buses provided for use of staff and others including running
costs etc.
viii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
d. Tax
In the CSR, 25% is added on the estimated unit cost of the items which
includes over heads, taxes, preliminaries and profit, however this will vary
from project to project and contractor to contractor.
Rate analysis in CSR have been prepared based on policy explained here
above. However, there are certain factors required to be considered while
deciding about more realistic rates in special situations.
ix
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
a. Price Escalation
b. Double Taxation
c. Service Roads
No provision has been made in this rate analysis for road diversion cost or
service road, which the contractor has to construct or maintain as a non-BOQ
item.
e. Other Factors
x
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
LIST OF MANPOWER
Man power Code Description
1001 SITE ENGINEER
1002 ASPHALT PLANT ENGINEER
1003 CONCRETE PLANT ENGINEER
1011 FOREMAN ASPHALT
1012 FOREMAN EARTHWORK
1013 FOREMAN CONCRETE
1014 GENERAL FOREMAN
1021 SUPERVISOR
1022 SURVEYOR
1023 ASSISTANT SURVEYOR
1031 MASON
1032 CARPENTER
1033 PAINTER
1034 STEEL BINDER/CUTTER
1040 HIGHLY SKILLED LABOUR
1041 HELPER
1042 WELDER
1051 LABOUR
Note:
3. All operators of Light and Heavy Duty Equipment and Plant Included in
the hourly rate of the equipment
xi
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
LIST OF MATERIAL
2001 ROCK CM
2002 SOIL CLASS-A1 CM
2004 SOIL CLASS-A2 CM
2008 SOIL CLASS-A3 CM
2009 SOIL CLASS-A4 CM
2010 SOIL CLASS-A5 CM
2014 CRUSHED AGGREGATE BASE A CM
2015 CRUSHED AGGREGATE BASE B CM
2016 CRUSHED AGGREGATE BASE B1 CM
2017 GRANULAR SUB-BASE A CM
2018 GRANULAR SUB-BASE B CM
2019 SAND CLASS C CM
2021 COARSE SAND CM
2022 FINE SAND CM
2023 AGGREGATE 2"-1.1/2" CM
2024 AGGREGATE 1.1/2"-3/4" CM
2025 AGGREGATE 3/4"-3/8" CM
2026 AGGREGATE 3/8"-EACH 4 CM
2027 AGGREGATE EACH4-EACH200 CM
2028 FILLER MATERIAL CM
2029 BRICK CLASS A EACH
2030 STONE RANDOM CLASS-A CM
2031 STONE RANDOM CLASS-B CM
2032 STONE RANDOM CLASS-C CM
2033 STONE RANDOM CLASS-D CM
2034 STONE DRESSED CM
2035 HAND BROKEN STONE 2.1/2"-1/2" CM
2041 ASPHALT GRADE 60/70 TON
2042 ASPHALT GRADE 80/100 TON
2043 ASPHALT M.C. 70 TON
2044 ASPHALT M.C. 250 TON
2045 ASPHALT M.C. 800 TON
2046 ASPHALT R.C. 70 TON
2047 ASPHALT R.C. 250 TON
2048 ASPHALT R.C. 800 TON
2049 ASPHALT S.S. 1 TON
2050 ASPHALT S.S. 1H TON
2051 ASPHALT R.S. 1 TON
2052 ASPHALT R.S. 2 TON
2053 CEMENT TYPE-I (OPC) BAG
2054 CEMENT TYPE-II (LOW S.R) BAG
2057 CEMENT TYPE-V (HIGH S.R) BAG
2058 ACCELERATOR LIT
2059 RETARDER LIT
2060 CURING COMPOUND LIT
2061 STEEL GRADE. 40 TON
2062 STEEL GRADE. 60 TON
xii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
LIST OF MATERIAL
xiii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
LIST OF MATERIAL
Material
Material Code Material Code
Code
2125 SHUTTERING (401) E LS
2126 SHUTTERING (401) F LS
2127 SHUTTERING (401) G LS
2128 SHUTTERING (401) H LS
2129 SHUTTERING (410) LS
2131 G.M.S BARBED WIRE KG
2133 ANGLE IRONS DIFFERENT SIZES KG
2134 STEEL CHANNELS KG
2135 SHEATHS (3/8", 1/2") M
2136 LIVE ANCHORAGES (3/8" - 1/2") EACH
2137 G.I. PIPE 3" DIA M
2140 G.M.S SCREW, NUTS, BOLTS AND WASHERS KG
2142 PLANTATION TREES EACH
2143 MOBILIZATION OF PILING EQUIPMENT LS
2144 RCC PIPE CLS-IV 310 MM (AASHTO M-170) M
2145 RCC PIPE CLS-IV 380 MM (AASHTO M-170) M
2146 RCC PIPE CLS-IV 460 MM (AASHTO M-170) M
2147 RCC PIPE CLS-IV 610 MM (AASHTO M-170) M
2148 RCC PIPE CLS-IV 760 MM (AASHTO M-170) M
2149 RCC PIPE CLS-IV 910 MM (AASHTO M-170) M
2150 RCC PIPE CLS-IV 1070 MM (AASHTO M-170) M
2151 RCC PIPE CLS-IV 1220 MM (AASHTO M-170) M
2152 RCC PIPE CLS-IV 1520 MM (AASHTO M-170) M
2153 PAVEMENT MARKING NON REFLECTING (TP) KG
2154 PAVEMENT MARKING REFLECTING (TP) KG
2155 GALVANIZED FLAT STEEL FASTENERS & WASHERS KG
2156 GALVANIZED U-BOLT CLAMP WITH 2 NUTS & TIE BOLTS KG
GALVANIZED SUPPORTING HOOKS CAST IN PRECAST
2157 EACH
POSTS
2158 GALVANIZED CHAIN LINK WIRE MESH FABRIC SM
2159 GALVANIZED WIRE 3.76MM Ø TENSION, 3MM Ø STIRRUP KG
2160 PRE-CAST CONCRETE TUFF KERB STONE(K-5) EACH
2161 LIFTING DEVICE ANCHORS EACH
2162 MS SHEET KG
2163 FABRICATION KG
2164 GALVANIZATION KG
xiv
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xv
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xvi
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xvii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xviii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xix
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
xx
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
Note:
(i) Bituminous material types are (a) asphalt cement, (b) cut-back or
emulsified and (c) asphalt cement, cut-back and emulsified
xxi
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
Qty of Cement
Sr. No Description Unit in Bag of 50
Kg
xxii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
CONVERSION FACTORS
To Convert Into Multiply By
Length
Inch Millimetre 25.4
Millimetre Inch 0.03937
Foot Metre 0.30480
Metre Foot 3.28084
Yard Metre 0.91440
Metre Yard 1.09361
Mile Kilometre 1.60934
Kilometre Mile 0.62137
Mass. Weight
Pound Kilogram 0.45359237
Kilogram Pound 2.20462
Ounce Gram 28.3495
Gram Ounce 0.03527
Quintal Kilogram 100
Grain Milligram 64.7989
Hundred Weight Kilogram 50.8023
Tonne Hundred Weight 19.6841
Tonne Kilogram 1000
Ton Kilogram 1016.0469
Ton Pound 2240
Ton Tonne 1.0160469
Tonne Ton 0.9842065
Seer Kilogram 0.9331
Maund Kilogram 37.324
Tola Gram 11.664
Capacity Volume
Pint (UK) Litre 0.568261
Gallon (Imperial) Litre 4.54609
Cubic foot Litre 28.3168
Cubic metre Litre 1000
Litre Cubic foot 0.0353147
Fluid ounce Millilitre 28.413
Litre Gallon (Imperial) 0.219969
Cubic inch Cubic millimetre 16387.1
Cubic foot Cubic metre 0.0283168
Cubic metre Cubic foot 35.3147
Cubic yard Cubic metre 0.764555
Cubic metre Cubic yard 1.30795
Acre foot Hectare metre 0.12334
Weights & Standard Sizes of Sheets
Birmingham Gauge Thickness in mm Kg Per Sqm
28 0.40 3.15
26 0.50 3.90
24 0.63 4.95
22 0.80 6.30
20 1.00 7.85
18 1.25 9.80
16 1.60 12.75
14 2.00 15.70
12 2.50 19.60
10 3.15 24.75
8 4.00 31.40
xxiii
National Highway Authority Shabir Associates
Islamabad Quantity Surveying & Construction Cost Consultants
Area
xxiv
NATIONAL HIGHWAY AUTHORITY
BALOCHISTAN
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 1
.
Page 2
CSR - January 2009
National Highway Authority Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
Page 3
.
Page 4
NATIONAL HIGHWAY AUTHORITY
CHAGHI
(08)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 5
.
Page 6
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chaghai
Chaghai District Code: 08
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.50 173.32 1.17 45.75 228.73
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.10 456.54 2.63 120.57 602.83
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 92.40 1,826.16 10.51 482.27 2,411.34
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 169.80 316.30 50.82 134.23 671.15
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 21.73 337.99 - 89.93 449.66
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 14.48 262.40 - 69.22 346.10
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 169.80 316.30 50.82 134.23 671.15
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 27.04 316.03 - 85.77 428.84
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 11.11 263.92 - 68.76 343.79
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 10.65 137.60 0.57 37.21 186.03
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 76.96 287.11 70.80 108.72 543.60
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 150.22 427.01 33.88 152.78 763.89
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 125.24 292.53 - 104.44 522.22
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 77.25 238.86 - 79.03 395.15
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 9.12 174.71 7.64 47.87 239.34
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 25.57 482.48 55.66 140.93 704.64
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 19.18 416.71 3.63 109.88 549.40
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 10.01 177.46 10.49 49.49 247.45
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 8.23 76.32 7.64 23.05 115.24
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 17.92 110.29 4.54 33.19 165.94
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.83 27.34 2.19 7.84 39.19
Page 7
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chaghai
Chaghai District Code: 08
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.37 18.21 1.16 5.19 25.93
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.10 15.26 1.19 4.39 21.94
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.62 15.57 1.29 4.62 23.11
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 77.25 1,510.17 6,891.33 2,119.69 10,598.43
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 80.46 1,510.17 7,422.60 2,253.31 11,266.54
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 87.15 1,577.28 6,879.07 2,135.88 10,679.38
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 87.15 1,571.31 7,587.84 2,311.57 11,557.87
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 325.79 915.38 63,839.91 16,270.27 81,351.35
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 325.79 915.38 62,261.78 15,875.74 79,378.69
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 94.01 112.80 869.39 269.05 1,345.24
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 169.09 2,437.94 6,377.12 2,246.04 11,230.18
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 101.45 126.27 794.38 255.53 1,277.63
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.33 45.04 1.89 12.31 61.57
207b DEEP PATCHING (16-30 cm) SM 2.33 39.67 1.89 10.97 54.87
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.26 110.61 1.02 28.72 143.61
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.65 22.12 0.20 5.74 28.72
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.39 1.57 45.31 11.82 59.09
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.38 1.57 50.58 13.13 65.67
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 18.96 4.92 24.62
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 22.12 5.71 28.57
Page 8
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chaghai
Chaghai District Code: 08
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 75.15 1,489.33 8,200.01 2,441.12 12,205.60
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 75.15 1,438.23 8,892.40 2,601.44 13,007.22
"B")
307a DENSE GRADED HOT BIT-MAC CM 179.45 379.77 6,961.56 1,880.19 9,400.97
307b OPEN GRADED HOT BIT-MAC CM 179.45 379.77 6,735.11 1,823.58 9,117.91
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 31.37 590.65 2,319.03 735.26 3,676.30
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 33.19 650.70 56,240.08 14,230.99 71,154.96
401a1i CONCRETE CLASS "A1" (Underground) CM 607.97 1,059.94 4,077.00 1,436.23 7,181.13
401a1ii CONCRETE CLASS "A1" (On ground) CM 607.97 1,059.94 4,354.47 1,505.59 7,527.97
401a1iii CONCRETE CLASS "A1" (Elevated) CM 607.97 1,059.94 4,909.41 1,644.33 8,221.65
401a2i CONCRETE CLASS "A2" (Underground) CM 607.97 1,059.94 4,455.00 1,530.73 7,653.63
401a2ii CONCRETE CLASS "A2" (On ground) CM 607.97 1,059.94 4,732.47 1,600.09 8,000.47
401a2iii CONCRETE CLASS "A2" (Elevated) CM 607.97 1,059.94 5,287.41 1,738.83 8,694.15
401a3i CONCRETE CLASS "A3" (Underground) CM 607.97 1,059.94 4,833.00 1,625.23 8,126.13
401a3ii CONCRETE CLASS "A3" (On ground) CM 607.97 1,059.94 5,110.47 1,694.59 8,472.97
401a3iii CONCRETE CLASS "A3" (Elevated) CM 607.97 1,059.94 5,665.41 1,833.33 9,166.65
401ci CONCRETE CLASS "C" (Underground) CM 576.24 500.55 3,618.95 1,173.94 5,869.68
401cii CONCRETE CLASS "C" (On ground) CM 576.24 500.55 3,737.29 1,203.52 6,017.61
401ciii CONCRETE CLASS "C" (Elevated) CM 576.24 500.55 3,973.98 1,262.69 6,313.46
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,883.96 947.15 5,089.93 1,980.26 9,901.30
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,883.96 947.15 5,845.93 2,169.26 10,846.30
401gii PRECAST CONCRETE CLASS "B" CM 1,883.96 947.15 4,825.15 1,914.06 9,570.32
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,883.96 947.15 6,223.93 2,263.76 11,318.80
Page 9
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chaghai
Chaghai District Code: 08
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,883.96 947.15 6,601.93 2,358.26 11,791.30
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,883.96 947.15 6,979.93 2,452.76 12,263.80
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,860.36 781.47 62,538.00 16,294.96 81,474.79
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,860.36 781.47 69,888.00 18,132.46 90,662.29
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,506.48 5,393.81 56,315.60 15,803.97 79,019.87
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,120.93 15,659.05 133,851.37 38,157.84 190,789.19
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 127.77 - 329.13 114.22 571.12
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 127.77 - 327.18 113.74 568.69
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 23.97 69.68 116.37 52.51 262.54
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 393.44 1,654.04 1,023.24 767.68 3,838.40
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 590.16 2,481.06 1,534.86 1,151.52 5,757.60
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 590.16 2,481.06 1,139.26 1,052.62 5,263.09
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 983.59 4,135.11 1,349.72 1,617.10 8,085.52
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 843.08 4,884.94 1,555.42 1,820.86 9,104.31
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,475.39 6,909.78 1,715.74 2,525.23 12,626.14
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 22,839.45 45,769.30 117,965.50 46,643.56 233,217.82
407i PILE LOAD TEST UP TO 240 TON EACH 40,761.51 45,769.30 235,931.00 80,615.45 403,077.27
407j PILE LOAD TEST UP TO 360 TON EACH 58,683.57 50,188.38 353,896.50 115,692.11 578,460.57
407k CONFIRMATORY BORING (NX SIZE) M 203.31 1,582.02 9.55 448.72 2,243.61
411a STONE MASONRY RANDOM DRY CM 312.08 107.96 585.08 251.28 1,256.40
411b STONE MASONRY RANDOM WITH MORTAR CM 335.97 166.68 1,763.16 566.45 2,832.27
411c STONE MASONRY DRESSED UNCOURSED DRY CM 399.70 107.96 651.33 289.75 1,448.74
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 467.40 166.68 1,807.93 610.50 3,052.52
Page 10
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chaghai
Chaghai District Code: 08
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 618.75 264.08 1,713.13 648.99 3,244.95
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 236.33 437.48 651.60 331.35 1,656.77
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 226.37 577.19 843.64 411.80 2,059.00
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 235.85 935.96 1,080.90 563.18 2,815.88
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 241.56 1,146.39 1,612.01 749.99 3,749.95
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 277.97 1,078.41 2,311.65 917.01 4,585.04
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 346.13 1,331.30 3,634.35 1,327.94 6,639.72
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 447.93 1,481.41 4,702.81 1,658.04 8,290.19
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 526.85 1,798.85 5,991.77 2,079.37 10,396.85
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 625.72 2,098.66 9,245.57 2,992.49 14,962.43
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 236.33 507.33 735.01 369.67 1,848.34
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 226.37 577.19 862.46 416.50 2,082.52
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 230.54 935.96 1,055.48 555.49 2,777.47
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 241.56 1,146.39 1,753.73 785.42 3,927.10
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 277.97 1,078.41 3,331.83 1,172.05 5,860.27
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 346.13 1,331.30 4,891.66 1,642.27 8,211.36
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 447.93 1,481.41 6,831.24 2,190.15 10,950.73
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 526.85 1,798.85 9,262.05 2,896.94 14,484.69
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 625.72 2,098.66 13,024.43 3,937.20 19,686.01
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 101.80 118.93 614.15 208.72 1,043.59
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 893.12 612.95 3,652.40 1,289.62 6,448.09
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.28 - 111.81 29.52 147.62
508a BRICK PAVING (SINGLE COURSE) SM 114.89 32.70 224.34 92.98 464.91
508b BRICK PAVING (DOUBLE COURSE) SM 202.51 32.70 442.80 169.50 847.51
Page 11
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chaghai
Chaghai District Code: 08
509d GROUTED RIP RAP CLASS "A" CM 608.93 102.14 1,978.57 672.41 3,362.06
509e GROUTED RIP RAP CLASS "B" CM 584.32 81.72 1,820.43 621.62 3,108.09
509f GROUTED RIP RAP CLASS "C" CM 574.56 68.10 1,869.60 628.06 3,140.32
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 834.75 353.02 4,212.57 1,350.09 6,750.44
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 50.37 191.97 544.26 196.65 983.25
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 163.49 67.48 79.67 77.66 388.29
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 209.26 86.37 101.98 99.40 497.01
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 263.43 180.32 436.33 220.02 1,100.10
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 329.29 225.40 545.41 275.03 1,375.13
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 322.34 572.25 2,280.27 793.71 3,968.57
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,036.64 670.54 4,187.66 1,473.71 7,368.55
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 150.85 90.27 442.54 170.91 854.56
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 26.77 - 1,197.58 306.09 1,530.43
604d STEEL POST OF METAL GUARD RAIL EACH 109.96 976.73 3,776.31 1,215.75 6,078.74
605a CONCRETE BEAM GUARD RAIL M 75.82 30.82 607.50 178.54 892.69
605c CONCRETE POST FOR GUARD RAIL M 93.10 27.36 609.80 182.57 912.83
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 257.11 255.15 6,872.04 1,846.08 9,230.38
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 76.05 382.72 9,300.86 2,439.91 12,199.55
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 257.11 541.89 11,958.78 3,189.44 15,947.22
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 771.99 598.64 21,089.73 5,615.09 28,075.45
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 154.40 119.73 9,268.06 2,385.55 11,927.73
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.32 5.86 16.21 6.35 31.74
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.11 4.03 40.17 11.33 56.63
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.32 5.86 21.63 7.70 38.52
LINES OF 20 cm WIDTH
Page 12
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Chaghai
Chaghai District Code: 08
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.11 4.03 53.57 14.68 73.39
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 86.03 5.22 156.66 61.98 309.88
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 86.03 9.98 506.17 150.55 752.73
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.15 8.59 22.53 8.82 44.09
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.15 9.63 67.50 20.32 101.61
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.15 6.95 30.04 10.29 51.43
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.15 9.63 90.01 25.95 129.74
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 86.03 3.73 217.51 76.82 384.09
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 86.03 7.90 851.20 236.28 1,181.41
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 71.69 3.73 104.44 44.96 224.82
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 71.69 7.90 337.95 104.39 521.93
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 71.69 3.73 145.01 55.11 275.53
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 71.69 7.90 568.32 161.98 809.89
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.97 81.62 193.99 71.65 358.23
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.97 81.62 233.99 81.64 408.21
DOUBLE)
610b RIGHT OF WAY MARKER EACH 104.00 121.33 308.39 133.43 667.15
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 667.81 976.31 2,093.56 934.42 4,672.10
610d TEN KILOMETRE POST EACH 1,287.83 1,952.61 4,577.99 1,954.61 9,773.04
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 146.84 91.00 958.65 299.12 1,495.62
PRECAST PRESTRESSED R.C.C. POST
Page 13
.
Page 14
NATIONAL HIGHWAY AUTHORITY
DERA BUGTI
(14)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 15
.
Page 16
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Bugti
Bugti District Code: 14
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.42 173.32 1.17 45.73 228.64
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.32 456.54 2.63 120.62 603.11
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 93.27 1,826.16 10.51 482.48 2,412.42
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 159.45 316.30 50.82 131.64 658.21
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 21.36 337.99 - 89.84 449.19
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 14.20 262.40 - 69.15 345.74
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 159.45 316.30 50.82 131.64 658.21
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 25.33 316.03 - 85.34 426.70
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.93 263.92 - 68.71 343.56
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 10.12 137.60 0.38 37.03 185.13
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 74.66 287.11 70.80 108.15 540.73
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 140.71 427.01 33.88 150.40 752.01
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 118.01 292.53 - 102.64 513.19
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 72.37 238.86 - 77.81 389.04
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.92 174.71 5.09 47.18 235.91
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 25.05 482.48 54.04 140.39 701.96
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.79 416.71 2.42 109.48 547.39
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.90 177.46 7.94 48.82 244.12
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 8.03 76.32 5.09 22.36 111.80
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 17.85 110.29 3.03 32.79 163.95
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.77 27.34 1.46 7.64 38.21
Page 17
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Bugti
Bugti District Code: 14
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.33 18.21 0.77 5.08 25.39
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.08 15.26 0.79 4.28 21.41
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.63 15.57 0.90 4.52 22.62
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 80.32 1,510.17 6,527.17 2,029.42 10,147.08
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 83.54 1,510.17 7,019.66 2,153.34 10,766.70
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 90.12 1,577.28 6,515.86 2,045.81 10,229.07
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 90.12 1,571.31 7,177.38 2,209.70 11,048.51
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 305.41 915.38 59,403.99 15,156.19 75,780.97
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 305.41 915.38 57,825.86 14,761.66 73,808.31
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 99.50 112.80 900.10 278.10 1,390.50
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 173.01 2,437.94 6,107.57 2,179.63 10,898.15
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 107.72 126.27 799.79 258.45 1,292.23
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.26 45.04 1.26 12.14 60.68
207b DEEP PATCHING (16-30 cm) SM 2.26 39.67 1.26 10.80 53.98
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.02 110.61 0.68 28.58 142.88
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.60 22.12 0.14 5.72 28.58
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.37 1.57 42.16 11.03 55.13
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.36 1.57 47.06 12.25 61.25
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.15 0.58 17.64 4.59 22.97
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.15 0.58 20.59 5.33 26.64
Page 18
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Bugti
Bugti District Code: 14
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 77.56 1,489.33 7,731.16 2,324.51 11,622.56
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 77.56 1,438.23 8,368.36 2,471.04 12,355.18
"B")
307a DENSE GRADED HOT BIT-MAC CM 187.70 379.77 6,501.60 1,767.27 8,836.34
307b OPEN GRADED HOT BIT-MAC CM 187.70 379.77 6,309.34 1,719.20 8,596.01
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 34.26 590.65 2,219.95 711.21 3,556.06
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 31.30 650.70 51,672.40 13,088.60 65,443.00
401a1i CONCRETE CLASS "A1" (Underground) CM 610.38 1,059.94 4,089.32 1,439.91 7,199.55
401a1ii CONCRETE CLASS "A1" (On ground) CM 610.38 1,059.94 4,366.80 1,509.28 7,546.39
401a1iii CONCRETE CLASS "A1" (Elevated) CM 610.38 1,059.94 4,921.74 1,648.02 8,240.08
401a2i CONCRETE CLASS "A2" (Underground) CM 610.38 1,059.94 4,467.32 1,534.41 7,672.05
401a2ii CONCRETE CLASS "A2" (On ground) CM 610.38 1,059.94 4,744.80 1,603.78 8,018.89
401a2iii CONCRETE CLASS "A2" (Elevated) CM 610.38 1,059.94 5,299.74 1,742.52 8,712.58
401a3i CONCRETE CLASS "A3" (Underground) CM 610.38 1,059.94 4,845.32 1,628.91 8,144.55
401a3ii CONCRETE CLASS "A3" (On ground) CM 610.38 1,059.94 5,122.80 1,698.28 8,491.39
401a3iii CONCRETE CLASS "A3" (Elevated) CM 610.38 1,059.94 5,677.74 1,837.02 9,185.08
401ci CONCRETE CLASS "C" (Underground) CM 593.67 500.55 3,647.68 1,185.47 5,927.37
401cii CONCRETE CLASS "C" (On ground) CM 593.67 500.55 3,766.02 1,215.06 6,075.30
401ciii CONCRETE CLASS "C" (Elevated) CM 593.67 500.55 4,002.71 1,274.23 6,371.15
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,941.35 947.15 5,101.10 1,997.40 9,987.00
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,941.35 947.15 5,857.10 2,186.40 10,932.00
401gii PRECAST CONCRETE CLASS "B" CM 1,941.35 947.15 4,864.54 1,938.26 9,691.31
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,941.35 947.15 6,235.10 2,280.90 11,404.50
Page 19
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Bugti
Bugti District Code: 14
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,941.35 947.15 6,613.10 2,375.40 11,877.00
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,941.35 947.15 6,991.10 2,469.90 12,349.50
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,785.39 781.47 61,478.00 16,011.22 80,056.08
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,785.39 781.47 68,828.00 17,848.72 89,243.58
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,421.93 5,393.81 60,280.63 16,774.09 83,870.46
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,058.81 15,659.05 133,822.12 38,134.99 190,674.97
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 124.48 - 322.76 111.81 559.05
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 124.48 - 320.97 111.36 556.81
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 21.68 69.68 121.74 53.28 266.38
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 384.15 1,654.04 908.22 736.61 3,683.03
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 576.23 2,481.06 1,362.34 1,104.91 5,524.54
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 576.23 2,481.06 1,010.75 1,017.01 5,085.05
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 960.39 4,135.11 1,196.54 1,573.01 7,865.04
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 823.19 4,884.94 1,388.84 1,774.24 8,871.21
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,440.58 6,909.78 1,520.29 2,467.66 12,338.31
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 23,937.45 45,769.30 113,561.10 45,816.96 229,084.82
407i PILE LOAD TEST UP TO 240 TON EACH 43,587.38 45,769.30 227,122.20 79,119.72 395,598.61
407j PILE LOAD TEST UP TO 360 TON EACH 63,237.31 50,188.38 340,683.30 113,527.25 567,636.24
407k CONFIRMATORY BORING (NX SIZE) M 207.06 1,582.02 6.37 448.86 2,244.31
411a STONE MASONRY RANDOM DRY CM 336.33 107.96 521.27 241.39 1,206.96
411b STONE MASONRY RANDOM WITH MORTAR CM 363.14 166.68 1,708.09 559.48 2,797.39
411c STONE MASONRY DRESSED UNCOURSED DRY CM 433.61 107.96 580.06 280.41 1,402.04
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 509.06 166.68 1,737.75 603.37 3,016.86
Page 20
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Bugti
Bugti District Code: 14
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 676.81 264.08 1,642.99 645.97 3,229.86
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 248.35 437.48 648.41 333.56 1,667.81
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 239.73 577.19 840.19 414.27 2,071.37
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 244.42 935.96 1,076.87 564.31 2,821.56
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 251.97 1,146.39 1,606.43 751.20 3,755.99
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 290.12 1,078.41 2,306.07 918.65 4,593.26
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 360.74 1,331.30 3,626.40 1,329.61 6,648.05
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 466.84 1,481.41 4,692.30 1,660.14 8,300.68
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 547.73 1,798.85 5,979.01 2,081.40 10,406.99
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 649.23 2,098.66 9,230.67 2,994.64 14,973.20
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 248.35 507.33 732.13 371.95 1,859.77
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 239.73 577.19 859.01 418.98 2,094.90
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 237.14 935.96 1,051.45 556.14 2,780.69
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 251.97 1,146.39 1,750.07 787.11 3,935.54
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 290.12 1,078.41 3,325.15 1,173.42 5,867.11
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 360.74 1,331.30 4,883.71 1,643.94 8,219.69
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 466.84 1,481.41 6,820.73 2,192.24 10,961.22
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 547.73 1,798.85 9,249.28 2,898.97 14,494.84
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 649.23 2,098.66 13,009.53 3,939.36 19,696.78
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 102.51 118.93 605.58 206.75 1,033.77
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 906.34 612.95 3,688.76 1,302.01 6,510.05
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.81 - 104.94 27.69 138.44
508a BRICK PAVING (SINGLE COURSE) SM 124.99 32.70 223.28 95.24 476.21
508b BRICK PAVING (DOUBLE COURSE) SM 222.27 32.70 441.30 174.07 870.33
Page 21
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Bugti
Bugti District Code: 14
509d GROUTED RIP RAP CLASS "A" CM 663.90 102.14 1,919.79 671.46 3,357.29
509e GROUTED RIP RAP CLASS "B" CM 639.12 81.72 1,761.26 620.52 3,102.61
509f GROUTED RIP RAP CLASS "C" CM 629.88 68.10 1,809.98 626.99 3,134.95
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 915.72 353.02 4,246.02 1,378.69 6,893.46
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 53.29 191.97 532.47 194.43 972.17
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 175.14 67.48 69.31 77.98 389.90
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 224.17 86.37 88.71 99.81 499.07
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 284.53 180.32 414.18 219.76 1,098.79
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 355.66 225.40 517.72 274.70 1,373.48
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 323.44 572.25 2,285.92 795.40 3,977.01
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,066.82 670.54 4,170.88 1,477.06 7,385.29
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 155.89 90.27 444.18 172.58 862.92
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 26.82 - 1,197.58 306.10 1,530.50
604d STEEL POST OF METAL GUARD RAIL EACH 102.76 976.73 3,776.31 1,213.95 6,069.75
605a CONCRETE BEAM GUARD RAIL M 79.06 30.82 602.99 178.22 891.09
605c CONCRETE POST FOR GUARD RAIL M 97.07 27.36 604.88 182.33 911.64
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 258.02 255.15 6,871.39 1,846.14 9,230.70
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 87.05 382.72 9,302.95 2,443.18 12,215.91
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 258.02 541.89 11,962.71 3,190.65 15,953.27
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 796.49 598.64 21,094.44 5,622.39 28,111.97
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 159.30 119.73 9,266.22 2,386.31 11,931.56
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.42 5.86 16.21 6.37 31.87
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.14 4.03 40.17 11.34 56.68
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.42 5.86 21.63 7.73 38.64
LINES OF 20 cm WIDTH
Page 22
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Dera
Dera Bugti
Bugti District Code: 14
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.14 4.03 53.58 14.69 73.44
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 75.63 5.22 156.66 59.38 296.88
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 75.63 9.98 506.23 147.96 739.81
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.28 8.59 22.53 8.85 44.24
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.28 9.63 67.50 20.35 101.76
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.28 6.95 30.04 10.32 51.58
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.28 9.63 90.01 25.98 129.89
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 75.63 3.73 217.52 74.22 371.09
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 75.63 7.90 851.20 233.68 1,168.41
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 64.14 3.73 104.44 43.08 215.38
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 64.14 7.90 338.00 102.51 512.55
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 64.14 3.73 145.01 53.22 266.10
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 64.14 7.90 568.32 160.09 800.45
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 12.50 81.62 194.00 72.03 360.15
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 12.50 81.62 234.00 82.03 410.14
DOUBLE)
610b RIGHT OF WAY MARKER EACH 110.53 121.33 307.18 134.76 673.80
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 667.10 976.31 2,083.04 931.61 4,658.06
610d TEN KILOMETRE POST EACH 1,265.26 1,952.61 4,556.37 1,943.56 9,717.81
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 152.75 91.00 959.30 300.76 1,503.82
PRECAST PRESTRESSED R.C.C. POST
Page 23
.
Page 24
NATIONAL HIGHWAY AUTHORITY
GWADAR
(19)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 25
.
Page 26
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Gwadar
Gwadar District Code: 19
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 12.15 173.32 1.17 46.66 233.29
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 34.88 456.54 2.63 123.51 617.55
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 139.50 1,826.16 10.51 494.04 2,470.21
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 189.71 316.30 50.82 139.21 696.04
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 25.43 337.99 - 90.86 454.28
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 16.78 262.40 - 69.79 348.96
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 189.71 316.30 50.82 139.21 696.04
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 30.09 316.03 - 86.53 432.65
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 12.85 263.92 - 69.19 345.96
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 11.99 137.60 0.38 37.49 187.46
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 99.17 287.11 70.80 114.27 571.37
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 167.14 427.01 33.88 157.01 785.05
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 140.14 292.53 - 108.17 540.84
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 85.96 238.86 - 81.21 406.03
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 10.56 174.71 5.09 47.59 237.95
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 31.35 482.48 54.04 141.97 709.84
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 23.51 416.71 2.42 110.66 553.30
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 12.24 177.46 7.94 49.41 247.04
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 9.57 76.32 5.09 22.74 113.72
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 23.12 110.29 3.03 34.11 170.55
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 2.18 27.34 1.46 7.74 38.72
Page 27
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Gwadar
Gwadar District Code: 19
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.62 18.21 0.77 5.15 25.75
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.39 15.26 0.79 4.36 21.81
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 2.04 15.57 0.90 4.63 23.13
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 117.86 1,510.17 6,697.95 2,081.49 10,407.47
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 121.43 1,510.17 7,176.98 2,202.14 11,010.72
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 130.11 1,577.28 6,687.06 2,098.61 10,493.07
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 130.11 1,571.31 7,333.81 2,258.81 11,294.03
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 396.38 915.38 59,185.83 15,124.40 75,621.99
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 396.38 915.38 57,607.70 14,729.87 73,649.33
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 158.41 112.80 1,056.96 332.04 1,660.21
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 238.14 2,437.94 6,282.53 2,239.65 11,198.27
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 173.58 126.27 925.50 306.34 1,531.69
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.71 45.04 1.26 12.25 61.25
207b DEEP PATCHING (16-30 cm) SM 2.71 39.67 1.26 10.91 54.55
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.60 110.61 0.68 28.72 143.61
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.72 22.12 0.14 5.74 28.72
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.48 1.57 42.01 11.01 55.07
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.46 1.57 46.89 12.23 61.15
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.19 0.58 17.58 4.59 22.94
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.19 0.58 20.51 5.32 26.60
Page 28
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Gwadar
Gwadar District Code: 19
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 109.59 1,489.33 7,895.40 2,373.58 11,867.90
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 109.59 1,438.23 8,539.73 2,521.89 12,609.43
"B")
307a DENSE GRADED HOT BIT-MAC CM 269.40 379.77 6,651.81 1,825.25 9,126.24
307b OPEN GRADED HOT BIT-MAC CM 269.40 379.77 6,456.61 1,776.45 8,882.23
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 46.20 590.65 2,244.59 720.36 3,601.79
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 43.82 650.70 51,447.76 13,035.57 65,177.85
401a1i CONCRETE CLASS "A1" (Underground) CM 764.98 1,059.94 4,203.94 1,507.22 7,536.08
401a1ii CONCRETE CLASS "A1" (On ground) CM 764.98 1,059.94 4,481.42 1,576.58 7,882.92
401a1iii CONCRETE CLASS "A1" (Elevated) CM 764.98 1,059.94 5,036.36 1,715.32 8,576.60
401a2i CONCRETE CLASS "A2" (Underground) CM 764.98 1,059.94 4,581.94 1,601.72 8,008.58
401a2ii CONCRETE CLASS "A2" (On ground) CM 764.98 1,059.94 4,859.42 1,671.08 8,355.42
401a2iii CONCRETE CLASS "A2" (Elevated) CM 764.98 1,059.94 5,414.36 1,809.82 9,049.10
401a3i CONCRETE CLASS "A3" (Underground) CM 764.98 1,059.94 4,959.94 1,696.22 8,481.08
401a3ii CONCRETE CLASS "A3" (On ground) CM 764.98 1,059.94 5,237.42 1,765.58 8,827.92
401a3iii CONCRETE CLASS "A3" (Elevated) CM 764.98 1,059.94 5,792.36 1,904.32 9,521.60
401ci CONCRETE CLASS "C" (Underground) CM 770.09 500.55 3,790.25 1,265.22 6,326.11
401cii CONCRETE CLASS "C" (On ground) CM 770.09 500.55 3,908.59 1,294.81 6,474.04
401ciii CONCRETE CLASS "C" (Elevated) CM 770.09 500.55 4,145.28 1,353.98 6,769.89
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 2,608.22 947.15 5,228.69 2,196.01 10,980.07
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 2,608.22 947.15 5,984.69 2,385.01 11,925.07
401gii PRECAST CONCRETE CLASS "B" CM 2,608.22 947.15 4,990.40 2,136.44 10,682.20
401giii(1) PRECAST CONCRETE CLASS "D1" CM 2,608.22 947.15 6,362.69 2,479.51 12,397.57
Page 29
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Gwadar
Gwadar District Code: 19
401giii(2) PRECAST CONCRETE CLASS "D2" CM 2,608.22 947.15 6,740.69 2,574.01 12,870.07
401giii(3) PRECAST CONCRETE CLASS "D3" CM 2,608.22 947.15 7,118.69 2,668.51 13,342.57
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 2,349.84 781.47 63,598.00 16,682.33 83,411.64
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 2,349.84 781.47 70,948.00 18,519.83 92,599.14
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,822.21 5,393.81 56,557.65 15,943.42 79,717.10
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,760.80 15,659.05 133,597.51 38,254.34 191,271.71
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 167.83 - 320.78 122.15 610.77
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 167.83 - 319.86 121.92 609.61
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 29.02 69.68 117.14 53.96 269.81
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 502.91 1,654.04 908.61 766.39 3,831.95
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 754.36 2,481.06 1,362.92 1,149.59 5,747.93
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 754.36 2,481.06 1,011.40 1,061.71 5,308.53
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 1,257.27 4,135.11 1,197.63 1,647.50 8,237.50
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,077.66 4,884.94 1,390.24 1,838.21 9,191.05
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,885.90 6,909.78 1,521.92 2,579.40 12,897.00
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 38,351.72 45,769.30 95,947.02 45,017.01 225,085.05
407i PILE LOAD TEST UP TO 240 TON EACH 72,302.53 45,769.30 191,894.04 77,491.47 387,457.34
407j PILE LOAD TEST UP TO 360 TON EACH 106,253.35 50,188.38 287,841.06 111,070.70 555,353.49
407k CONFIRMATORY BORING (NX SIZE) M 300.68 1,582.02 6.37 472.27 2,361.33
411a STONE MASONRY RANDOM DRY CM 428.72 107.96 700.03 309.18 1,545.89
411b STONE MASONRY RANDOM WITH MORTAR CM 454.20 166.68 1,876.83 624.43 3,122.15
411c STONE MASONRY DRESSED UNCOURSED DRY CM 555.13 107.96 1,288.56 487.91 2,439.56
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 643.82 166.68 2,438.79 812.32 4,061.62
Page 30
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Gwadar
Gwadar District Code: 19
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 871.17 264.08 2,343.98 869.81 4,349.04
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 377.73 437.48 648.10 365.83 1,829.14
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 367.44 577.19 839.81 446.11 2,230.55
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 349.98 935.96 1,076.43 590.59 2,952.97
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 369.61 1,146.39 1,605.92 780.48 3,902.40
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 424.24 1,078.41 2,305.56 952.05 4,760.27
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 517.26 1,331.30 3,625.66 1,368.55 6,842.77
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 669.39 1,481.41 4,691.56 1,710.59 8,552.95
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 794.63 1,798.85 5,978.11 2,142.90 10,714.49
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 932.58 2,098.66 9,229.63 3,065.22 15,326.09
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 377.73 507.33 731.50 404.14 2,020.71
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 367.44 577.19 858.63 450.82 2,254.08
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 340.55 935.96 1,051.01 581.88 2,909.41
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 369.61 1,146.39 1,749.67 816.42 4,082.09
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 424.24 1,078.41 3,324.58 1,206.81 6,034.04
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 517.26 1,331.30 4,882.97 1,682.88 8,414.40
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 669.39 1,481.41 6,819.99 2,242.70 11,213.48
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 794.63 1,798.85 9,248.39 2,960.47 14,802.34
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 932.58 2,098.66 13,008.49 4,009.93 20,049.67
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 153.67 118.93 446.47 179.77 898.83
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 1,167.13 612.95 3,802.85 1,395.73 6,978.66
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 8.23 - 107.73 28.99 144.95
508a BRICK PAVING (SINGLE COURSE) SM 165.13 32.70 213.27 102.78 513.88
508b BRICK PAVING (DOUBLE COURSE) SM 291.55 32.70 423.29 186.88 934.42
Page 31
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Gwadar
Gwadar District Code: 19
509d GROUTED RIP RAP CLASS "A" CM 858.76 102.14 2,092.24 763.29 3,816.43
509e GROUTED RIP RAP CLASS "B" CM 823.61 81.72 1,932.93 709.56 3,547.82
509f GROUTED RIP RAP CLASS "C" CM 812.76 68.10 1,982.85 715.93 3,579.63
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 1,206.90 353.02 4,354.20 1,478.53 7,392.65
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 81.01 191.97 444.93 179.48 897.39
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 229.67 67.48 98.35 98.87 494.37
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 293.98 86.37 125.89 126.56 632.79
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 364.93 180.32 428.28 243.38 1,216.92
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 456.16 225.40 535.35 304.23 1,521.15
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 405.75 572.25 2,345.53 830.88 4,154.41
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,428.95 670.54 4,281.32 1,595.20 7,976.00
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 208.46 90.27 453.06 187.95 939.74
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 39.76 - 1,197.58 309.33 1,546.67
604d STEEL POST OF METAL GUARD RAIL EACH 136.94 976.73 3,776.31 1,222.50 6,112.48
605a CONCRETE BEAM GUARD RAIL M 118.56 30.82 617.21 191.65 958.24
605c CONCRETE POST FOR GUARD RAIL M 145.58 27.36 621.01 198.49 992.43
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 351.89 255.15 6,879.92 1,871.74 9,358.71
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 108.40 382.72 9,312.70 2,450.96 12,254.78
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 351.89 541.89 11,979.96 3,218.44 16,092.18
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 1,223.49 598.64 21,106.69 5,732.21 28,661.03
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 244.70 119.73 9,255.00 2,404.86 12,024.28
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 4.70 5.86 16.19 6.69 33.44
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.57 4.03 39.90 11.37 56.87
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 4.70 5.86 21.60 8.04 40.20
LINES OF 20 cm WIDTH
Page 32
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Gwadar
Gwadar District Code: 19
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.57 4.03 53.22 14.70 73.52
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 106.99 5.22 156.40 67.15 335.76
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 106.99 9.98 502.79 154.94 774.71
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 5.88 8.59 22.50 9.24 46.21
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 5.88 9.63 67.50 20.75 103.77
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 5.88 6.95 30.00 10.71 53.54
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 5.88 9.63 90.01 26.38 131.90
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 106.99 3.73 217.26 81.99 409.97
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 106.99 7.90 851.20 241.52 1,207.61
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 90.69 3.73 104.27 49.67 248.35
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 90.69 7.90 335.70 108.57 542.85
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 90.69 3.73 144.84 59.81 299.06
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 90.69 7.90 568.32 166.73 833.63
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 14.48 81.62 193.99 72.52 362.61
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 14.48 81.62 233.99 82.52 412.61
DOUBLE)
610b RIGHT OF WAY MARKER EACH 171.00 121.33 314.51 151.71 758.54
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 976.11 976.31 2,151.42 1,025.96 5,129.79
610d TEN KILOMETRE POST EACH 1,904.64 1,952.61 4,693.86 2,137.78 10,688.90
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 207.47 91.00 966.22 316.17 1,580.86
PRECAST PRESTRESSED R.C.C. POST
Page 33
.
Page 34
NATIONAL HIGHWAY AUTHORITY
KACHHI
(24)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 35
.
Page 36
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kachhi
Kachhi District Code: 24
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 7.66 173.32 1.17 45.54 227.68
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 21.21 456.54 2.63 120.09 600.47
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 84.84 1,826.16 10.51 480.38 2,401.88
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 144.67 316.30 50.82 127.95 639.74
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 19.17 337.99 - 89.29 446.46
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 12.79 262.40 - 68.80 343.98
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 144.67 316.30 50.82 127.95 639.74
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 23.00 316.03 - 84.76 423.79
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 9.80 263.92 - 68.43 342.15
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.14 137.60 0.38 36.78 183.91
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 69.42 287.11 70.80 106.84 534.18
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 127.79 427.01 33.88 147.17 735.86
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 107.04 292.53 - 99.89 499.47
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 65.72 238.86 - 76.15 380.73
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.02 174.71 5.09 46.95 234.77
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 22.60 482.48 54.04 139.78 698.90
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 16.95 416.71 2.42 109.02 545.10
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 8.91 177.46 7.94 48.58 242.88
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.21 76.32 5.09 22.16 110.78
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 16.08 110.29 3.03 32.35 161.75
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.60 27.34 1.46 7.60 37.99
Page 37
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kachhi
Kachhi District Code: 24
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.20 18.21 0.77 5.04 25.22
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 0.97 15.26 0.79 4.26 21.28
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.46 15.57 0.90 4.48 22.40
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 72.77 1,510.17 6,711.36 2,073.58 10,367.88
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 75.67 1,510.17 7,200.11 2,196.49 10,982.44
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 81.73 1,577.28 6,700.22 2,089.81 10,449.04
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 81.73 1,571.31 7,358.24 2,252.82 11,264.09
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 281.35 915.38 59,888.79 15,271.38 76,356.89
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 281.35 915.38 58,310.66 14,876.85 74,384.23
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 90.47 112.80 1,018.29 305.39 1,526.94
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 156.29 2,437.94 6,284.09 2,219.58 11,097.89
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 98.08 126.27 739.92 241.07 1,205.35
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.03 45.04 1.26 12.08 60.40
207b DEEP PATCHING (16-30 cm) SM 2.03 39.67 1.26 10.74 53.70
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.75 110.61 0.68 28.51 142.55
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.55 22.12 0.14 5.70 28.51
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.34 1.57 42.50 11.10 55.52
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.33 1.57 47.45 12.34 61.69
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 17.79 4.63 23.13
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 20.75 5.37 26.84
Page 38
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kachhi
Kachhi District Code: 24
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 70.14 1,489.33 7,925.67 2,371.29 11,856.43
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 70.14 1,438.23 8,575.96 2,521.08 12,605.42
"B")
307a DENSE GRADED HOT BIT-MAC CM 168.53 379.77 6,682.97 1,807.82 9,039.09
307b OPEN GRADED HOT BIT-MAC CM 168.53 379.77 6,485.35 1,758.41 8,792.07
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 30.06 590.65 2,254.05 718.69 3,593.44
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 28.77 650.70 52,171.60 13,212.77 66,063.83
401a1i CONCRETE CLASS "A1" (Underground) CM 555.22 1,059.94 4,172.06 1,446.80 7,234.02
401a1ii CONCRETE CLASS "A1" (On ground) CM 555.22 1,059.94 4,449.53 1,516.17 7,580.86
401a1iii CONCRETE CLASS "A1" (Elevated) CM 555.22 1,059.94 5,004.47 1,654.91 8,274.54
401a2i CONCRETE CLASS "A2" (Underground) CM 555.22 1,059.94 4,550.06 1,541.30 7,706.52
401a2ii CONCRETE CLASS "A2" (On ground) CM 555.22 1,059.94 4,827.53 1,610.67 8,053.36
401a2iii CONCRETE CLASS "A2" (Elevated) CM 555.22 1,059.94 5,382.47 1,749.41 8,747.04
401a3i CONCRETE CLASS "A3" (Underground) CM 555.22 1,059.94 4,928.06 1,635.80 8,179.02
401a3ii CONCRETE CLASS "A3" (On ground) CM 555.22 1,059.94 5,205.53 1,705.17 8,525.86
401a3iii CONCRETE CLASS "A3" (Elevated) CM 555.22 1,059.94 5,760.47 1,843.91 9,219.54
401ci CONCRETE CLASS "C" (Underground) CM 532.55 500.55 3,751.19 1,196.07 5,980.37
401cii CONCRETE CLASS "C" (On ground) CM 532.55 500.55 3,869.54 1,225.66 6,128.30
401ciii CONCRETE CLASS "C" (Elevated) CM 532.55 500.55 4,106.22 1,284.83 6,424.15
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,741.32 947.15 5,191.92 1,970.10 9,850.49
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,741.32 947.15 5,947.92 2,159.10 10,795.49
401gii PRECAST CONCRETE CLASS "B" CM 1,741.32 947.15 4,953.91 1,910.60 9,552.98
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,741.32 947.15 6,325.92 2,253.60 11,267.99
Page 39
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kachhi
Kachhi District Code: 24
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,741.32 947.15 6,703.92 2,348.10 11,740.49
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,741.32 947.15 7,081.92 2,442.60 12,212.99
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,692.36 781.47 61,478.00 15,987.96 79,939.79
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,692.36 781.47 68,828.00 17,825.46 89,127.29
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,344.71 5,393.81 55,771.22 15,627.44 78,137.18
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,003.18 15,659.05 133,802.82 38,116.26 190,581.30
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 116.92 - 317.67 108.65 543.24
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 116.92 - 316.32 108.31 541.54
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 20.38 69.68 115.92 51.50 257.49
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 383.77 1,654.04 907.41 736.31 3,681.54
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 575.66 2,481.06 1,361.12 1,104.46 5,522.31
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 575.66 2,481.06 1,009.40 1,016.53 5,082.65
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 959.44 4,135.11 1,194.29 1,572.21 7,861.04
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 822.37 4,884.94 1,385.95 1,773.32 8,866.58
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,439.15 6,909.78 1,516.92 2,466.46 12,332.31
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 21,841.12 45,769.30 109,157.58 44,192.00 220,960.00
407i PILE LOAD TEST UP TO 240 TON EACH 39,763.18 45,769.30 218,315.16 75,961.91 379,809.55
407j PILE LOAD TEST UP TO 360 TON EACH 57,685.24 50,188.38 327,472.74 108,836.59 544,182.95
407k CONFIRMATORY BORING (NX SIZE) M 201.12 1,582.02 6.37 447.38 2,236.89
411a STONE MASONRY RANDOM DRY CM 285.73 107.96 488.56 220.56 1,102.81
411b STONE MASONRY RANDOM WITH MORTAR CM 306.41 166.68 1,665.36 534.61 2,673.06
411c STONE MASONRY DRESSED UNCOURSED DRY CM 366.91 107.96 544.72 254.90 1,274.49
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 428.19 166.68 1,694.95 572.45 2,862.27
Page 40
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kachhi
Kachhi District Code: 24
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 569.88 264.08 1,600.14 608.53 3,042.63
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 222.59 437.48 648.10 327.04 1,635.21
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 214.62 577.19 839.81 407.90 2,039.52
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 218.18 935.96 1,076.43 557.64 2,788.22
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 225.50 1,146.39 1,605.92 744.45 3,722.27
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 260.13 1,078.41 2,305.56 911.03 4,555.13
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 322.62 1,331.30 3,625.66 1,319.90 6,599.48
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 417.51 1,481.41 4,691.56 1,647.62 8,238.10
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 492.21 1,798.85 5,978.11 2,067.29 10,336.47
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 581.79 2,098.66 9,229.63 2,977.52 14,887.60
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 222.59 507.33 731.50 365.36 1,826.78
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 214.62 577.19 858.63 412.61 2,063.05
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 212.37 935.96 1,051.01 549.84 2,749.18
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 225.50 1,146.39 1,749.67 780.39 3,901.96
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 260.13 1,078.41 3,324.58 1,165.78 5,828.91
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 322.62 1,331.30 4,882.97 1,634.22 8,171.11
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 417.51 1,481.41 6,819.99 2,179.73 10,898.64
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 492.21 1,798.85 9,248.39 2,884.86 14,424.31
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 581.79 2,098.66 13,008.49 3,922.24 19,611.18
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 93.45 118.93 545.54 189.48 947.39
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 818.87 612.95 3,770.85 1,300.67 6,503.34
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.58 - 111.60 29.30 146.49
508a BRICK PAVING (SINGLE COURSE) SM 106.24 32.70 212.30 87.81 439.05
508b BRICK PAVING (DOUBLE COURSE) SM 187.43 32.70 419.85 159.99 799.97
Page 41
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kachhi
Kachhi District Code: 24
509d GROUTED RIP RAP CLASS "A" CM 559.84 102.14 1,880.77 635.69 3,178.44
509e GROUTED RIP RAP CLASS "B" CM 537.33 81.72 1,723.15 585.55 2,927.74
509f GROUTED RIP RAP CLASS "C" CM 528.96 68.10 1,771.38 592.11 2,960.54
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 785.02 353.02 4,323.85 1,365.48 6,827.38
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 48.22 191.97 569.57 202.44 1,012.20
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 149.75 67.48 63.98 70.30 351.51
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 191.68 86.37 81.90 89.99 449.93
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 240.70 180.32 406.71 206.93 1,034.66
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 300.87 225.40 508.38 258.66 1,293.32
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 294.33 572.25 2,328.82 798.85 3,994.25
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 957.20 670.54 4,218.10 1,461.46 7,307.30
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 139.24 90.27 452.61 170.53 852.65
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 26.64 - 1,197.58 306.05 1,530.26
604d STEEL POST OF METAL GUARD RAIL EACH 98.74 976.73 3,776.31 1,212.94 6,064.72
605a CONCRETE BEAM GUARD RAIL M 71.61 30.82 606.37 177.20 886.01
605c CONCRETE POST FOR GUARD RAIL M 87.92 27.36 608.99 181.07 905.34
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 233.54 255.15 6,877.86 1,841.64 9,208.19
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 72.69 382.72 9,310.94 2,441.59 12,207.93
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 233.54 541.89 11,975.47 3,187.72 15,938.62
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 730.20 598.64 21,106.95 5,608.95 28,044.74
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 146.04 119.73 9,260.76 2,381.63 11,908.16
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.06 5.86 16.20 6.28 31.40
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.02 4.03 40.03 11.27 56.34
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.06 5.86 21.62 7.63 38.17
LINES OF 20 cm WIDTH
Page 42
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kachhi
Kachhi District Code: 24
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.02 4.03 53.38 14.61 73.04
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 76.46 5.22 156.52 59.55 297.75
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 76.46 9.98 504.38 147.71 738.53
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.83 8.59 22.51 8.73 43.67
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.83 9.63 67.50 20.24 101.21
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.83 6.95 30.02 10.20 51.00
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.83 9.63 90.01 25.87 129.34
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 76.46 3.73 217.38 74.39 371.96
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 76.46 7.90 851.20 233.89 1,169.45
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 64.05 3.73 104.35 43.03 215.16
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 64.05 7.90 336.76 102.18 510.89
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 64.05 3.73 144.92 53.17 265.87
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 64.05 7.90 568.32 160.07 800.34
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.40 81.62 193.99 71.50 357.51
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.40 81.62 233.99 81.50 407.50
DOUBLE)
610b RIGHT OF WAY MARKER EACH 99.69 121.33 310.77 132.94 664.72
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 615.35 976.31 2,112.21 925.97 4,629.84
610d TEN KILOMETRE POST EACH 1,189.35 1,952.61 4,615.48 1,939.36 9,696.80
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 138.68 91.00 963.44 298.28 1,491.40
PRECAST PRESTRESSED R.C.C. POST
Page 43
.
Page 44
NATIONAL HIGHWAY AUTHORITY
KALLAT
(25)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 45
.
Page 46
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kallat
Kallat District Code: 25
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.89 173.32 1.17 45.85 229.23
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 24.00 456.54 2.63 120.79 603.95
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 95.98 1,826.16 10.51 483.16 2,415.81
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 181.10 316.30 50.82 137.05 685.27
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 23.06 337.99 - 90.26 451.32
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 15.35 262.40 - 69.44 347.18
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 181.10 316.30 50.82 137.05 685.27
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 28.79 316.03 - 86.20 431.02
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 11.80 263.92 - 68.93 344.66
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 11.33 137.60 0.38 37.33 186.65
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 82.06 287.11 70.80 109.99 549.97
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 159.92 427.01 33.88 155.20 776.02
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 133.14 292.53 - 106.42 532.10
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 82.25 238.86 - 80.28 401.39
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 9.64 174.71 5.09 47.36 236.80
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 27.03 482.48 54.04 140.89 704.44
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 20.27 416.71 2.42 109.85 549.25
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 10.52 177.46 7.94 48.98 244.90
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 8.77 76.32 5.09 22.54 112.72
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 18.86 110.29 3.03 33.04 165.21
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.93 27.34 1.46 7.68 38.41
Page 47
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kallat
Kallat District Code: 25
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.46 18.21 0.77 5.11 25.56
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.18 15.26 0.79 4.31 21.54
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.72 15.57 0.90 4.55 22.73
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 78.89 1,510.17 6,406.94 1,999.00 9,995.00
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 82.02 1,510.17 6,870.28 2,115.61 10,578.07
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 89.25 1,577.28 6,395.86 2,015.60 10,077.98
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 89.25 1,571.31 7,025.37 2,171.48 10,857.41
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 348.66 915.38 57,852.63 14,779.17 73,895.83
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 348.66 915.38 56,274.50 14,384.63 71,923.17
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 95.85 112.80 866.82 268.87 1,344.33
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 174.37 2,437.94 5,978.62 2,147.73 10,738.67
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 103.01 126.27 742.91 243.05 1,215.24
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.51 45.04 1.26 12.20 61.01
207b DEEP PATCHING (16-30 cm) SM 2.51 39.67 1.26 10.86 54.30
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.57 110.61 0.68 28.71 143.57
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.71 22.12 0.14 5.74 28.71
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.41 1.57 41.06 10.76 53.81
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.40 1.57 45.83 11.95 59.76
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.17 0.58 17.18 4.48 22.41
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.17 0.58 20.05 5.20 25.99
Page 48
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kallat
Kallat District Code: 25
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 76.79 1,489.33 7,568.34 2,283.62 11,418.08
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 76.79 1,438.23 8,191.30 2,426.58 12,132.91
"B")
307a DENSE GRADED HOT BIT-MAC CM 185.51 379.77 6,357.46 1,730.69 8,653.43
307b OPEN GRADED HOT BIT-MAC CM 185.51 379.77 6,150.37 1,678.91 8,394.56
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 31.75 590.65 2,176.75 699.79 3,498.94
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 35.03 650.70 50,074.96 12,690.17 63,450.86
401a1i CONCRETE CLASS "A1" (Underground) CM 656.57 1,059.94 4,091.84 1,452.09 7,260.44
401a1ii CONCRETE CLASS "A1" (On ground) CM 656.57 1,059.94 4,369.31 1,521.46 7,607.28
401a1iii CONCRETE CLASS "A1" (Elevated) CM 656.57 1,059.94 4,924.26 1,660.19 8,300.96
401a2i CONCRETE CLASS "A2" (Underground) CM 656.57 1,059.94 4,469.84 1,546.59 7,732.94
401a2ii CONCRETE CLASS "A2" (On ground) CM 656.57 1,059.94 4,747.31 1,615.96 8,079.78
401a2iii CONCRETE CLASS "A2" (Elevated) CM 656.57 1,059.94 5,302.26 1,754.69 8,773.46
401a3i CONCRETE CLASS "A3" (Underground) CM 656.57 1,059.94 4,847.84 1,641.09 8,205.44
401a3ii CONCRETE CLASS "A3" (On ground) CM 656.57 1,059.94 5,125.31 1,710.46 8,552.28
401a3iii CONCRETE CLASS "A3" (Elevated) CM 656.57 1,059.94 5,680.26 1,849.19 9,245.96
401ci CONCRETE CLASS "C" (Underground) CM 622.26 500.55 3,625.17 1,187.00 5,934.98
401cii CONCRETE CLASS "C" (On ground) CM 622.26 500.55 3,743.51 1,216.58 6,082.91
401ciii CONCRETE CLASS "C" (Elevated) CM 622.26 500.55 3,980.20 1,275.75 6,378.76
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 2,032.46 947.15 5,108.73 2,022.08 10,110.42
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 2,032.46 947.15 5,864.73 2,211.08 11,055.42
401gii PRECAST CONCRETE CLASS "B" CM 2,032.46 947.15 4,821.41 1,950.25 9,751.27
401giii(1) PRECAST CONCRETE CLASS "D1" CM 2,032.46 947.15 6,242.73 2,305.58 11,527.92
Page 49
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kallat
Kallat District Code: 25
401giii(2) PRECAST CONCRETE CLASS "D2" CM 2,032.46 947.15 6,620.73 2,400.08 12,000.42
401giii(3) PRECAST CONCRETE CLASS "D3" CM 2,032.46 947.15 6,998.73 2,494.58 12,472.92
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 2,029.47 781.47 61,478.00 16,072.24 80,361.18
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 2,029.47 781.47 68,828.00 17,909.74 89,548.68
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,605.00 5,393.81 55,726.92 15,681.43 78,407.17
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,199.10 15,659.05 133,796.87 38,163.75 190,818.77
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 138.42 - 312.60 112.75 563.77
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 138.42 - 311.50 112.48 562.40
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 24.79 69.68 115.95 52.61 263.03
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 406.71 1,654.04 908.25 742.25 3,711.26
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 610.07 2,481.06 1,362.38 1,113.38 5,566.89
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 610.07 2,481.06 1,010.57 1,025.43 5,127.13
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 1,016.78 4,135.11 1,196.25 1,587.04 7,935.18
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 871.53 4,884.94 1,389.91 1,786.60 8,932.98
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,525.18 6,909.78 1,519.86 2,488.70 12,443.51
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 23,256.82 45,769.30 117,965.50 46,747.91 233,739.53
407i PILE LOAD TEST UP TO 240 TON EACH 41,178.88 45,769.30 235,931.00 80,719.80 403,598.98
407j PILE LOAD TEST UP TO 360 TON EACH 59,100.94 50,188.38 353,896.50 115,796.46 578,982.28
407k CONFIRMATORY BORING (NX SIZE) M 208.90 1,582.02 6.37 449.32 2,246.61
411a STONE MASONRY RANDOM DRY CM 338.69 107.96 545.47 248.03 1,240.15
411b STONE MASONRY RANDOM WITH MORTAR CM 366.26 166.68 1,722.27 563.80 2,819.02
411c STONE MASONRY DRESSED UNCOURSED DRY CM 433.66 107.96 606.20 286.96 1,434.78
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 508.72 166.68 1,756.43 607.96 3,039.79
Page 50
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kallat
Kallat District Code: 25
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 671.09 264.08 1,661.62 649.20 3,246.00
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 245.38 437.48 648.10 332.74 1,663.70
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 234.60 577.19 839.81 412.90 2,064.49
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 247.53 935.96 1,076.43 564.98 2,824.91
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 252.18 1,146.39 1,605.92 751.12 3,755.62
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 288.08 1,078.41 2,305.56 918.01 4,590.07
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 358.42 1,331.30 3,625.66 1,328.84 6,644.22
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 463.84 1,481.41 4,691.56 1,659.20 8,296.01
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 543.54 1,798.85 5,978.11 2,080.13 10,400.63
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 648.25 2,098.66 9,229.63 2,994.14 14,970.68
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 245.38 507.33 731.50 371.05 1,855.27
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 234.60 577.19 858.63 417.60 2,088.02
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 242.22 935.96 1,051.01 557.30 2,786.49
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 252.18 1,146.39 1,749.67 787.06 3,935.31
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 288.08 1,078.41 3,324.58 1,172.77 5,863.85
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 358.42 1,331.30 4,882.97 1,643.17 8,215.86
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 463.84 1,481.41 6,819.99 2,191.31 10,956.55
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 543.54 1,798.85 9,248.39 2,897.69 14,488.47
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 648.25 2,098.66 13,008.49 3,938.85 19,694.26
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 105.93 118.93 638.62 215.87 1,079.35
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 955.55 612.95 3,648.86 1,304.34 6,521.69
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.71 - 104.94 27.91 139.56
508a BRICK PAVING (SINGLE COURSE) SM 123.28 32.70 217.31 93.32 466.61
508b BRICK PAVING (DOUBLE COURSE) SM 218.26 32.70 428.86 169.95 849.76
Page 51
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kallat
Kallat District Code: 25
509d GROUTED RIP RAP CLASS "A" CM 657.03 102.14 1,937.68 674.22 3,371.08
509e GROUTED RIP RAP CLASS "B" CM 631.63 81.72 1,779.61 623.24 3,116.19
509f GROUTED RIP RAP CLASS "C" CM 621.33 68.10 1,828.29 629.43 3,147.14
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 888.94 353.02 4,208.28 1,362.56 6,812.80
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 51.45 191.97 556.86 200.07 1,000.35
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 176.29 67.48 73.23 79.25 396.24
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 225.65 86.37 93.74 101.44 507.19
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 285.69 180.32 414.87 220.22 1,101.11
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 357.12 225.40 518.59 275.28 1,376.38
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 348.09 572.25 2,286.88 801.80 4,009.02
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,119.29 670.54 4,174.85 1,491.17 7,455.84
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 162.57 90.27 443.69 174.13 870.66
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 27.60 - 1,197.58 306.29 1,531.47
604d STEEL POST OF METAL GUARD RAIL EACH 117.01 976.73 3,776.31 1,217.51 6,087.56
605a CONCRETE BEAM GUARD RAIL M 79.92 30.82 603.47 178.55 892.76
605c CONCRETE POST FOR GUARD RAIL M 98.13 27.36 605.48 182.74 913.72
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 274.51 255.15 6,859.34 1,847.25 9,236.25
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 82.19 382.72 9,283.39 2,437.08 12,185.38
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 274.51 541.89 11,930.76 3,186.79 15,933.95
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 805.44 598.64 21,036.61 5,610.17 28,050.87
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 161.09 119.73 9,242.77 2,380.90 11,904.48
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.53 5.86 16.19 6.39 31.97
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.18 4.03 39.96 11.29 56.46
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.53 5.86 21.61 7.75 38.74
LINES OF 20 cm WIDTH
Page 52
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kallat
Kallat District Code: 25
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.18 4.03 53.30 14.63 73.13
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 96.50 5.22 156.46 64.54 322.72
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 96.50 9.98 503.58 152.52 762.58
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.41 8.59 22.51 8.88 44.38
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.41 9.63 67.50 20.39 101.93
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.41 6.95 30.01 10.34 51.71
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.41 9.63 90.01 26.01 130.06
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 96.50 3.73 217.32 79.39 396.93
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 96.50 7.90 851.20 238.90 1,194.49
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 79.95 3.73 104.31 47.00 234.98
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 79.95 7.90 336.23 106.02 530.10
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 79.95 3.73 144.88 57.14 285.70
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 79.95 7.90 568.32 164.04 820.22
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 12.04 81.62 193.99 71.91 359.56
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 12.04 81.62 233.99 81.91 409.55
DOUBLE)
610b RIGHT OF WAY MARKER EACH 107.76 121.33 307.71 134.20 670.99
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 717.34 976.31 2,087.03 945.17 4,725.84
610d TEN KILOMETRE POST EACH 1,379.54 1,952.61 4,564.82 1,974.24 9,871.21
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 156.21 91.00 958.31 301.38 1,506.91
PRECAST PRESTRESSED R.C.C. POST
Page 53
.
Page 54
NATIONAL HIGHWAY AUTHORITY
KHARAN
(31)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 55
.
Page 56
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kharan
Kharan District Code: 31
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.93 173.32 1.17 45.85 229.27
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 24.79 456.54 2.63 120.99 604.94
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 99.15 1,826.16 10.51 483.96 2,419.78
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 169.20 316.30 50.82 134.08 670.41
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 22.44 337.99 - 90.11 450.54
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 14.92 262.40 - 69.33 346.64
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 169.20 316.30 50.82 134.08 670.41
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 26.92 316.03 - 85.74 428.69
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 11.45 263.92 - 68.84 344.22
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 10.53 137.60 0.38 37.13 185.64
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 79.82 287.11 70.80 109.43 547.17
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 149.54 427.01 33.88 152.61 763.05
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 125.38 292.53 - 104.48 522.39
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 76.91 238.86 - 78.94 394.72
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 9.32 174.71 5.09 47.28 236.40
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 26.34 482.48 54.04 140.71 703.57
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 19.75 416.71 2.42 109.72 548.60
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 10.36 177.46 7.94 48.94 244.70
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 8.38 76.32 5.09 22.45 112.23
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 18.69 110.29 3.03 33.00 165.01
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.86 27.34 1.46 7.66 38.32
Page 57
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kharan
Kharan District Code: 31
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.38 18.21 0.77 5.09 25.46
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.13 15.26 0.79 4.30 21.48
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.68 15.57 0.90 4.54 22.69
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 85.06 1,510.17 6,393.98 1,997.30 9,986.51
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 88.44 1,510.17 6,853.76 2,113.09 10,565.46
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 95.39 1,577.28 6,383.06 2,013.93 10,069.67
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 95.39 1,571.31 7,007.99 2,168.67 10,843.35
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 325.59 915.38 57,379.95 14,655.23 73,276.14
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 325.59 915.38 55,801.82 14,260.70 71,303.48
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 106.05 112.80 897.89 279.19 1,395.93
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 182.02 2,437.94 5,982.69 2,150.66 10,753.32
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 115.23 126.27 765.93 251.86 1,259.29
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.35 45.04 1.26 12.16 60.81
207b DEEP PATCHING (16-30 cm) SM 2.35 39.67 1.26 10.82 54.11
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.15 110.61 0.68 28.61 143.05
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.63 22.12 0.14 5.72 28.61
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.40 1.57 40.72 10.67 53.37
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.38 1.57 45.46 11.85 59.27
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 17.04 4.45 22.23
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 19.88 5.16 25.78
Page 58
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kharan
Kharan District Code: 31
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 81.87 1,489.33 7,544.46 2,278.92 11,394.58
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 81.87 1,438.23 8,161.72 2,420.45 12,102.27
"B")
307a DENSE GRADED HOT BIT-MAC CM 197.03 379.77 6,329.85 1,726.66 8,633.32
307b OPEN GRADED HOT BIT-MAC CM 197.03 379.77 6,130.29 1,676.77 8,383.86
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 35.01 590.65 2,171.85 699.38 3,496.89
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 33.49 650.70 49,588.24 12,568.11 62,840.54
401a1i CONCRETE CLASS "A1" (Underground) CM 635.57 1,059.94 4,106.94 1,450.61 7,253.05
401a1ii CONCRETE CLASS "A1" (On ground) CM 635.57 1,059.94 4,384.41 1,519.98 7,599.89
401a1iii CONCRETE CLASS "A1" (Elevated) CM 635.57 1,059.94 4,939.35 1,658.71 8,293.57
401a2i CONCRETE CLASS "A2" (Underground) CM 635.57 1,059.94 4,484.94 1,545.11 7,725.55
401a2ii CONCRETE CLASS "A2" (On ground) CM 635.57 1,059.94 4,762.41 1,614.48 8,072.39
401a2iii CONCRETE CLASS "A2" (Elevated) CM 635.57 1,059.94 5,317.35 1,753.21 8,766.07
401a3i CONCRETE CLASS "A3" (Underground) CM 635.57 1,059.94 4,862.94 1,639.61 8,198.05
401a3ii CONCRETE CLASS "A3" (On ground) CM 635.57 1,059.94 5,140.41 1,708.98 8,544.89
401a3iii CONCRETE CLASS "A3" (Elevated) CM 635.57 1,059.94 5,695.35 1,847.71 9,238.57
401ci CONCRETE CLASS "C" (Underground) CM 610.41 500.55 3,650.35 1,190.33 5,951.64
401cii CONCRETE CLASS "C" (On ground) CM 610.41 500.55 3,768.70 1,219.91 6,099.56
401ciii CONCRETE CLASS "C" (Elevated) CM 610.41 500.55 4,005.38 1,279.08 6,395.42
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 2,003.46 947.15 5,122.80 2,018.35 10,091.75
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 2,003.46 947.15 5,878.80 2,207.35 11,036.75
401gii PRECAST CONCRETE CLASS "B" CM 2,003.46 947.15 4,848.38 1,949.75 9,748.73
401giii(1) PRECAST CONCRETE CLASS "D1" CM 2,003.46 947.15 6,256.80 2,301.85 11,509.25
Page 59
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kharan
Kharan District Code: 31
401giii(2) PRECAST CONCRETE CLASS "D2" CM 2,003.46 947.15 6,634.80 2,396.35 11,981.75
401giii(3) PRECAST CONCRETE CLASS "D3" CM 2,003.46 947.15 7,012.80 2,490.85 12,454.25
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,927.38 781.47 62,538.00 16,311.71 81,558.56
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,927.38 781.47 69,888.00 18,149.21 90,746.06
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,537.06 5,393.81 56,354.53 15,821.35 79,106.75
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,175.96 15,659.05 133,848.61 38,170.91 190,854.53
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 134.73 - 324.58 114.83 574.14
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 134.73 - 322.45 114.29 571.47
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 23.87 69.68 116.32 52.47 262.34
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 396.78 1,654.04 1,000.94 762.94 3,814.70
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 595.16 2,481.06 1,501.42 1,144.41 5,722.05
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 595.16 2,481.06 1,104.54 1,045.19 5,225.96
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 991.94 4,135.11 1,292.35 1,604.85 8,024.25
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 850.23 4,884.94 1,487.54 1,805.68 9,028.40
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,487.91 6,909.78 1,629.97 2,506.92 12,534.58
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 25,720.44 45,769.30 100,350.54 42,960.07 214,800.35
407i PILE LOAD TEST UP TO 240 TON EACH 46,827.15 45,769.30 200,701.08 73,324.38 366,621.92
407j PILE LOAD TEST UP TO 360 TON EACH 67,933.87 50,188.38 301,051.62 104,793.47 523,967.34
407k CONFIRMATORY BORING (NX SIZE) M 217.36 1,582.02 6.37 451.44 2,257.18
411a STONE MASONRY RANDOM DRY CM 327.82 107.96 589.87 256.41 1,282.07
411b STONE MASONRY RANDOM WITH MORTAR CM 351.01 166.68 1,766.67 571.09 2,855.45
411c STONE MASONRY DRESSED UNCOURSED DRY CM 421.10 107.96 654.15 295.80 1,479.01
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 490.92 166.68 1,804.38 615.49 3,077.47
Page 60
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kharan
Kharan District Code: 31
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 654.28 264.08 1,709.57 656.98 3,284.92
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 259.57 437.48 648.10 336.29 1,681.44
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 250.36 577.19 839.81 416.84 2,084.20
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 254.27 935.96 1,076.43 566.67 2,833.33
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 263.13 1,146.39 1,605.92 753.86 3,769.31
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 303.69 1,078.41 2,305.56 921.92 4,609.59
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 376.65 1,331.30 3,625.66 1,333.40 6,667.00
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 487.42 1,481.41 4,691.56 1,665.10 8,325.49
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 575.31 1,798.85 5,978.11 2,088.07 10,440.35
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 679.35 2,098.66 9,229.63 3,001.91 15,009.55
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 259.57 507.33 731.50 374.60 1,873.01
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 250.36 577.19 858.63 421.55 2,107.73
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 247.57 935.96 1,051.01 558.64 2,793.18
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 263.13 1,146.39 1,749.67 789.80 3,949.00
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 303.69 1,078.41 3,324.58 1,176.67 5,883.36
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 376.65 1,331.30 4,882.97 1,647.73 8,238.64
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 487.42 1,481.41 6,819.99 2,197.21 10,986.03
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 575.31 1,798.85 9,248.39 2,905.64 14,528.19
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 679.35 2,098.66 13,008.49 3,946.63 19,733.13
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 109.01 118.93 425.44 163.34 816.72
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 941.45 612.95 3,674.60 1,307.25 6,536.25
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.44 - 112.48 29.73 148.65
508a BRICK PAVING (SINGLE COURSE) SM 122.38 32.70 215.77 92.71 463.56
508b BRICK PAVING (DOUBLE COURSE) SM 215.65 32.70 427.79 169.03 845.17
Page 61
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kharan
Kharan District Code: 31
509d GROUTED RIP RAP CLASS "A" CM 643.81 102.14 1,982.08 682.01 3,410.04
509e GROUTED RIP RAP CLASS "B" CM 617.59 81.72 1,823.65 630.74 3,153.70
509f GROUTED RIP RAP CLASS "C" CM 607.93 68.10 1,872.69 637.18 3,185.90
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 904.82 353.02 4,232.28 1,372.53 6,862.66
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 56.29 191.97 452.03 175.07 875.37
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 172.34 67.48 80.45 80.06 400.32
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 220.59 86.37 102.97 102.48 512.41
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 276.45 180.32 410.53 216.82 1,084.12
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 345.56 225.40 513.16 271.03 1,355.15
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 336.98 572.25 2,295.15 801.09 4,005.47
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,100.73 670.54 4,204.21 1,493.87 7,469.34
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 160.24 90.27 444.70 173.80 869.01
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 27.84 - 1,197.58 306.35 1,531.77
604d STEEL POST OF METAL GUARD RAIL EACH 108.43 976.73 3,776.31 1,215.37 6,076.84
605a CONCRETE BEAM GUARD RAIL M 82.99 30.82 608.68 180.62 903.12
605c CONCRETE POST FOR GUARD RAIL M 101.90 27.36 611.24 185.12 925.62
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 271.86 255.15 6,877.05 1,851.01 9,255.07
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 83.08 382.72 9,308.16 2,443.49 12,217.45
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 271.86 541.89 11,971.05 3,196.20 15,980.99
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 852.84 598.64 21,110.94 5,640.61 28,203.03
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 170.57 119.73 9,275.67 2,391.49 11,957.46
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.54 5.86 16.22 6.41 32.03
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.18 4.03 40.27 11.37 56.84
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.54 5.86 21.65 7.76 38.81
LINES OF 20 cm WIDTH
Page 62
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kharan
Kharan District Code: 31
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.18 4.03 53.71 14.73 73.64
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 86.62 5.22 156.76 62.15 310.74
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 86.62 9.98 507.42 151.01 755.03
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.42 8.59 22.54 8.89 44.44
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.42 9.63 67.50 20.39 101.95
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.42 6.95 30.05 10.36 51.78
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.42 9.63 90.01 26.02 130.08
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 86.62 3.73 217.61 76.99 384.95
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 86.62 7.90 851.20 236.43 1,182.14
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 72.71 3.73 104.50 45.23 226.17
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 72.71 7.90 338.79 104.85 524.25
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 72.71 3.73 145.08 55.38 276.89
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 72.71 7.90 568.32 162.23 811.16
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.80 81.62 193.99 71.85 359.26
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.80 81.62 233.99 81.85 409.25
DOUBLE)
610b RIGHT OF WAY MARKER EACH 116.13 121.33 309.38 136.71 683.55
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 709.38 976.31 2,105.36 947.76 4,738.82
610d TEN KILOMETRE POST EACH 1,372.40 1,952.61 4,601.96 1,981.74 9,908.71
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 155.85 91.00 959.93 301.70 1,508.48
PRECAST PRESTRESSED R.C.C. POST
Page 63
.
Page 64
NATIONAL HIGHWAY AUTHORITY
KHUZDAR
(33)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 65
.
Page 66
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Khuzdar
Khuzdar District Code: 33
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.10 173.32 1.17 45.65 228.23
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 22.24 456.54 2.63 120.35 601.75
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 88.94 1,826.16 10.51 481.40 2,407.02
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 156.45 316.30 50.82 130.89 654.47
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 20.77 337.99 - 89.69 448.46
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.89 262.40 - 69.07 345.35
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 156.45 316.30 50.82 130.89 654.47
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 24.85 316.03 - 85.22 426.10
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.65 263.92 - 68.64 343.22
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 10.09 137.60 0.38 37.02 185.09
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 75.80 287.11 70.80 108.43 542.14
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 138.05 427.01 33.88 149.74 748.69
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 115.54 292.53 - 102.02 510.10
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 71.00 238.86 - 77.47 387.33
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.77 174.71 5.09 47.14 235.71
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 24.42 482.48 54.04 140.23 701.17
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.31 416.71 2.42 109.36 546.80
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.66 177.46 7.94 48.76 243.82
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.89 76.32 5.09 22.32 111.62
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 17.36 110.29 3.03 32.67 163.35
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.74 27.34 1.46 7.63 38.17
Page 67
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Khuzdar
Khuzdar District Code: 33
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.31 18.21 0.77 5.07 25.36
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.06 15.26 0.79 4.28 21.39
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.60 15.57 0.90 4.52 22.58
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 76.40 1,510.17 6,398.76 1,996.33 9,981.65
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 79.55 1,510.17 6,848.85 2,109.64 10,548.20
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 86.10 1,577.28 6,388.12 2,012.88 10,064.38
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 86.10 1,571.31 7,001.17 2,164.64 10,823.21
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 302.82 915.38 56,458.83 14,419.26 72,096.29
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 302.82 915.38 54,880.70 14,024.73 70,123.63
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 93.34 112.80 984.32 297.61 1,488.07
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 166.57 2,437.94 6,018.98 2,155.87 10,779.37
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 100.63 126.27 738.83 241.43 1,207.17
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.22 45.04 1.26 12.13 60.64
207b DEEP PATCHING (16-30 cm) SM 2.22 39.67 1.26 10.79 53.94
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.04 110.61 0.68 28.58 142.92
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.61 22.12 0.14 5.72 28.58
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.37 1.57 40.07 10.50 52.51
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.36 1.57 44.73 11.66 58.32
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.15 0.58 16.77 4.37 21.87
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.15 0.58 19.56 5.07 25.37
Page 68
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Khuzdar
Khuzdar District Code: 33
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 74.21 1,489.33 7,525.65 2,272.30 11,361.49
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 74.21 1,438.23 8,134.05 2,411.62 12,058.11
"B")
307a DENSE GRADED HOT BIT-MAC CM 178.49 379.77 6,302.15 1,715.10 8,575.51
307b OPEN GRADED HOT BIT-MAC CM 178.49 379.77 6,115.14 1,668.35 8,341.76
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 32.53 590.65 2,166.44 697.41 3,487.03
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 30.51 650.70 48,639.76 12,330.24 61,651.21
401a1i CONCRETE CLASS "A1" (Underground) CM 618.44 1,059.94 4,057.86 1,434.06 7,170.29
401a1ii CONCRETE CLASS "A1" (On ground) CM 618.44 1,059.94 4,335.33 1,503.43 7,517.13
401a1iii CONCRETE CLASS "A1" (Elevated) CM 618.44 1,059.94 4,890.27 1,642.16 8,210.82
401a2i CONCRETE CLASS "A2" (Underground) CM 618.44 1,059.94 4,435.86 1,528.56 7,642.79
401a2ii CONCRETE CLASS "A2" (On ground) CM 618.44 1,059.94 4,713.33 1,597.93 7,989.63
401a2iii CONCRETE CLASS "A2" (Elevated) CM 618.44 1,059.94 5,268.27 1,736.66 8,683.32
401a3i CONCRETE CLASS "A3" (Underground) CM 618.44 1,059.94 4,813.86 1,623.06 8,115.29
401a3ii CONCRETE CLASS "A3" (On ground) CM 618.44 1,059.94 5,091.33 1,692.43 8,462.13
401a3iii CONCRETE CLASS "A3" (Elevated) CM 618.44 1,059.94 5,646.27 1,831.16 9,155.82
401ci CONCRETE CLASS "C" (Underground) CM 588.66 500.55 3,621.95 1,177.79 5,888.95
401cii CONCRETE CLASS "C" (On ground) CM 588.66 500.55 3,740.30 1,207.38 6,036.88
401ciii CONCRETE CLASS "C" (Elevated) CM 588.66 500.55 3,976.98 1,266.55 6,332.73
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,898.43 947.15 5,070.76 1,979.08 9,895.42
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,898.43 947.15 5,826.76 2,168.08 10,840.42
401gii PRECAST CONCRETE CLASS "B" CM 1,898.43 947.15 4,814.58 1,915.04 9,575.20
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,898.43 947.15 6,204.76 2,262.58 11,312.92
Page 69
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Khuzdar
Khuzdar District Code: 33
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,898.43 947.15 6,582.76 2,357.08 11,785.42
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,898.43 947.15 6,960.76 2,451.58 12,257.92
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,899.79 781.47 62,538.00 16,304.82 81,524.08
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,899.79 781.47 69,888.00 18,142.32 90,711.58
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,508.57 5,393.81 56,123.44 15,756.46 78,782.28
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,956.58 15,659.05 133,803.04 38,104.67 190,523.34
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 128.62 - 308.69 109.33 546.63
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 128.62 - 307.79 109.10 545.50
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 21.67 69.68 116.57 51.98 259.91
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 372.66 1,654.04 899.64 731.59 3,657.93
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 558.99 2,481.06 1,349.47 1,097.38 5,486.90
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 558.99 2,481.06 997.60 1,009.41 5,047.06
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 931.65 4,135.11 1,174.63 1,560.35 7,801.73
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 798.56 4,884.94 1,353.27 1,759.19 8,795.96
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,397.47 6,909.78 1,487.42 2,448.67 12,243.34
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 22,350.99 45,769.30 106,955.82 43,769.03 218,845.14
407i PILE LOAD TEST UP TO 240 TON EACH 40,434.51 45,769.30 213,911.64 75,028.86 375,144.32
407j PILE LOAD TEST UP TO 360 TON EACH 58,518.03 50,188.38 320,867.46 107,393.47 536,967.34
407k CONFIRMATORY BORING (NX SIZE) M 195.71 1,582.02 6.37 446.02 2,230.12
411a STONE MASONRY RANDOM DRY CM 309.01 107.96 704.07 280.26 1,401.29
411b STONE MASONRY RANDOM WITH MORTAR CM 332.19 166.68 1,790.80 572.42 2,862.09
411c STONE MASONRY DRESSED UNCOURSED DRY CM 395.56 107.96 777.49 320.25 1,601.26
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 462.02 166.68 1,860.16 622.22 3,111.08
Page 70
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Khuzdar
Khuzdar District Code: 33
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 611.94 264.08 1,765.36 660.35 3,301.73
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 231.86 437.48 645.28 328.66 1,643.28
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 223.15 577.19 836.43 409.19 2,045.97
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 229.97 935.96 1,072.49 559.60 2,798.02
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 236.46 1,146.39 1,601.32 746.04 3,730.21
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 272.68 1,078.41 2,300.96 913.01 4,565.07
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 338.81 1,331.30 3,619.00 1,322.28 6,611.39
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 438.45 1,481.41 4,684.94 1,651.20 8,256.00
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 515.85 1,798.85 5,970.07 2,071.19 10,355.97
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 609.98 2,098.66 9,220.25 2,982.22 14,911.11
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 231.86 507.33 725.87 366.27 1,831.34
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 223.15 577.19 855.25 413.90 2,069.49
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 223.27 935.96 1,047.07 551.58 2,757.88
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 236.46 1,146.39 1,746.09 782.23 3,911.17
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 272.68 1,078.41 3,319.46 1,167.64 5,838.20
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 338.81 1,331.30 4,876.31 1,636.60 8,183.02
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 438.45 1,481.41 6,813.37 2,183.31 10,916.54
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 515.85 1,798.85 9,240.35 2,888.76 14,443.81
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 609.98 2,098.66 12,999.11 3,926.94 19,634.69
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 98.04 118.93 515.51 183.12 915.60
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 905.37 612.95 3,632.91 1,287.81 6,439.03
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.01 - 111.15 29.29 146.44
508a BRICK PAVING (SINGLE COURSE) SM 113.30 32.70 216.70 90.67 453.37
508b BRICK PAVING (DOUBLE COURSE) SM 199.85 32.70 428.90 165.36 826.80
Page 71
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Khuzdar
Khuzdar District Code: 33
509d GROUTED RIP RAP CLASS "A" CM 598.39 102.14 2,039.99 685.13 3,425.66
509e GROUTED RIP RAP CLASS "B" CM 574.54 81.72 1,886.50 635.69 3,178.44
509f GROUTED RIP RAP CLASS "C" CM 565.34 68.10 1,934.35 641.95 3,209.73
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 850.41 353.02 4,193.04 1,349.12 6,745.59
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 50.46 191.97 462.32 176.19 880.95
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 160.58 67.48 99.01 81.76 408.82
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 205.54 86.37 126.73 104.66 523.29
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 258.71 180.32 414.88 213.48 1,067.39
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 323.38 225.40 518.60 266.85 1,334.23
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 327.76 572.25 2,269.05 792.26 3,961.32
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,044.61 670.54 4,177.15 1,473.07 7,365.36
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 151.64 90.27 440.20 170.53 852.64
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 25.67 - 1,197.58 305.81 1,529.06
604d STEEL POST OF METAL GUARD RAIL EACH 100.90 976.73 3,776.31 1,213.48 6,067.42
605a CONCRETE BEAM GUARD RAIL M 75.64 30.82 607.04 178.38 891.88
605c CONCRETE POST FOR GUARD RAIL M 92.88 27.36 609.18 182.36 911.78
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 248.26 255.15 6,870.86 1,843.57 9,217.83
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 80.55 382.72 9,280.81 2,436.02 12,180.10
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 248.26 541.89 11,924.73 3,178.72 15,893.60
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 760.33 598.64 21,024.32 5,595.82 27,979.12
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 152.07 119.73 9,237.77 2,377.39 11,886.96
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.32 5.86 16.19 6.34 31.71
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.11 4.03 39.90 11.26 56.29
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.32 5.86 21.60 7.69 38.47
LINES OF 20 cm WIDTH
Page 72
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Khuzdar
Khuzdar District Code: 33
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.11 4.03 53.22 14.59 72.94
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 84.87 5.22 156.40 61.62 308.10
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 84.87 9.98 502.79 149.41 747.05
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.15 8.59 22.50 8.81 44.05
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.15 9.63 67.50 20.32 101.61
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.15 6.95 30.00 10.28 51.38
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.15 9.63 90.01 25.95 129.73
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 84.87 3.73 217.26 76.46 382.31
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 84.87 7.90 851.20 235.99 1,179.96
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 70.96 3.73 104.27 44.74 223.69
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 70.96 7.90 335.70 103.64 518.19
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 70.96 3.73 144.84 54.88 274.40
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 70.96 7.90 568.32 161.79 808.97
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.80 81.62 193.88 71.83 359.13
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.80 81.62 233.88 81.82 409.11
DOUBLE)
610b RIGHT OF WAY MARKER EACH 104.26 121.33 307.51 133.28 666.38
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 654.97 976.31 2,087.58 929.71 4,648.56
610d TEN KILOMETRE POST EACH 1,263.56 1,952.61 4,570.57 1,946.68 9,733.42
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 146.80 91.00 957.69 298.87 1,494.37
PRECAST PRESTRESSED R.C.C. POST
Page 73
.
Page 74
NATIONAL HIGHWAY AUTHORITY
KOHLU
(36)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 75
.
Page 76
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohlu
Kohlu District Code: 36
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.56 173.32 1.17 45.76 228.81
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 24.40 456.54 2.63 120.89 604.45
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 97.58 1,826.16 10.51 483.56 2,417.82
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 148.72 316.30 50.82 128.96 644.81
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 20.48 337.99 - 89.62 448.09
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.57 262.40 - 68.99 344.96
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 148.72 316.30 50.82 128.96 644.81
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 23.66 316.03 - 84.92 424.61
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.40 263.92 - 68.58 342.91
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.16 137.60 0.38 36.79 183.93
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 72.87 287.11 70.80 107.70 538.49
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 131.45 427.01 33.88 148.09 740.43
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 110.93 292.53 - 100.87 504.34
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 67.60 238.86 - 76.62 383.08
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.42 174.71 5.09 47.05 235.27
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 24.17 482.48 54.04 140.17 700.86
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.13 416.71 2.42 109.31 546.57
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.56 177.46 7.94 48.74 243.70
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.52 76.32 5.09 22.23 111.15
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 17.47 110.29 3.03 32.70 163.48
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.69 27.34 1.46 7.62 38.10
Page 77
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohlu
Kohlu District Code: 36
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.23 18.21 0.77 5.05 25.27
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.02 15.26 0.79 4.27 21.35
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.55 15.57 0.90 4.50 22.52
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 85.91 1,510.17 6,788.18 2,096.06 10,480.32
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 89.15 1,510.17 7,294.60 2,223.48 11,117.40
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 95.53 1,577.28 6,776.93 2,112.44 10,562.18
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 95.53 1,571.31 7,454.21 2,280.26 11,401.30
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 289.28 915.38 60,773.55 15,494.55 77,472.76
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 289.28 915.38 59,195.42 15,100.02 75,500.10
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 110.54 112.80 1,048.34 317.92 1,589.60
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 177.99 2,437.94 6,371.09 2,246.76 11,233.78
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 121.15 126.27 746.46 248.47 1,242.36
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.08 45.04 1.26 12.09 60.47
207b DEEP PATCHING (16-30 cm) SM 2.08 39.67 1.26 10.75 53.77
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.63 110.61 0.68 28.48 142.40
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.53 22.12 0.14 5.70 28.48
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.36 1.57 43.13 11.27 56.33
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.34 1.57 48.15 12.52 62.58
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 18.05 4.69 23.47
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 21.06 5.45 27.23
Page 78
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohlu
Kohlu District Code: 36
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 81.51 1,489.33 8,026.96 2,399.45 11,997.26
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 81.51 1,438.23 8,684.85 2,551.15 12,755.75
"B")
307a DENSE GRADED HOT BIT-MAC CM 196.73 379.77 6,770.98 1,836.87 9,184.36
307b OPEN GRADED HOT BIT-MAC CM 196.73 379.77 6,584.99 1,790.37 8,951.86
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 35.43 590.65 2,281.17 726.81 3,634.06
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 30.66 650.70 53,082.64 13,441.00 67,204.99
401a1i CONCRETE CLASS "A1" (Underground) CM 584.77 1,059.94 4,158.67 1,450.84 7,254.21
401a1ii CONCRETE CLASS "A1" (On ground) CM 584.77 1,059.94 4,436.14 1,520.21 7,601.05
401a1iii CONCRETE CLASS "A1" (Elevated) CM 584.77 1,059.94 4,991.09 1,658.95 8,294.73
401a2i CONCRETE CLASS "A2" (Underground) CM 584.77 1,059.94 4,536.67 1,545.34 7,726.71
401a2ii CONCRETE CLASS "A2" (On ground) CM 584.77 1,059.94 4,814.14 1,614.71 8,073.55
401a2iii CONCRETE CLASS "A2" (Elevated) CM 584.77 1,059.94 5,369.09 1,753.45 8,767.23
401a3i CONCRETE CLASS "A3" (Underground) CM 584.77 1,059.94 4,914.67 1,639.84 8,199.21
401a3ii CONCRETE CLASS "A3" (On ground) CM 584.77 1,059.94 5,192.14 1,709.21 8,546.05
401a3iii CONCRETE CLASS "A3" (Elevated) CM 584.77 1,059.94 5,747.09 1,847.95 9,239.73
401ci CONCRETE CLASS "C" (Underground) CM 582.99 500.55 3,755.90 1,209.86 6,049.29
401cii CONCRETE CLASS "C" (On ground) CM 582.99 500.55 3,874.24 1,239.44 6,197.22
401ciii CONCRETE CLASS "C" (Elevated) CM 582.99 500.55 4,110.93 1,298.62 6,493.08
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,951.31 947.15 5,174.50 2,018.24 10,091.20
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,951.31 947.15 5,930.50 2,207.24 11,036.20
401gii PRECAST CONCRETE CLASS "B" CM 1,951.31 947.15 4,973.08 1,967.88 9,839.42
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,951.31 947.15 6,308.50 2,301.74 11,508.70
Page 79
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohlu
Kohlu District Code: 36
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,951.31 947.15 6,686.50 2,396.24 11,981.20
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,951.31 947.15 7,064.50 2,490.74 12,453.70
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,696.82 781.47 62,538.00 16,254.07 81,270.37
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,696.82 781.47 69,888.00 18,091.57 90,457.87
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,362.18 5,393.81 56,398.96 15,788.74 78,943.70
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,964.71 15,659.05 133,874.35 38,124.53 190,622.63
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 122.60 - 331.25 113.46 567.32
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 122.60 - 328.88 112.87 564.36
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 21.80 69.68 116.30 51.95 259.73
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 369.45 1,654.04 903.72 731.80 3,659.01
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 554.17 2,481.06 1,355.58 1,097.70 5,488.51
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 554.17 2,481.06 1,004.17 1,009.85 5,049.25
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 923.61 4,135.11 1,185.58 1,561.08 7,805.38
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 791.67 4,884.94 1,368.77 1,761.35 8,806.73
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,385.42 6,909.78 1,503.86 2,449.76 12,248.82
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 26,828.90 45,769.30 128,974.30 50,393.13 251,965.63
407i PILE LOAD TEST UP TO 240 TON EACH 49,966.53 45,769.30 257,948.60 88,421.11 442,105.54
407j PILE LOAD TEST UP TO 360 TON EACH 73,104.16 50,188.38 386,922.90 127,553.86 637,769.31
407k CONFIRMATORY BORING (NX SIZE) M 215.96 1,582.02 6.37 451.09 2,255.44
411a STONE MASONRY RANDOM DRY CM 336.62 107.96 564.53 252.28 1,261.39
411b STONE MASONRY RANDOM WITH MORTAR CM 361.50 166.68 1,731.33 564.88 2,824.39
411c STONE MASONRY DRESSED UNCOURSED DRY CM 437.81 107.96 626.77 293.13 1,465.67
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 513.28 166.68 1,769.50 612.37 3,061.83
Page 80
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohlu
Kohlu District Code: 36
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 690.77 264.08 1,674.69 657.39 3,286.93
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 268.08 437.48 647.78 338.34 1,691.69
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 260.72 577.19 839.44 419.33 2,096.67
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 255.41 935.96 1,076.00 566.84 2,834.20
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 267.25 1,146.39 1,605.41 754.76 3,773.81
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 309.09 1,078.41 2,305.05 923.14 4,615.69
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 382.88 1,331.30 3,624.92 1,334.78 6,673.88
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 495.50 1,481.41 4,690.82 1,666.93 8,334.66
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 583.90 1,798.85 5,977.22 2,089.99 10,449.97
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 689.71 2,098.66 9,228.59 3,004.24 15,021.20
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 268.08 507.33 730.88 376.57 1,882.87
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 260.72 577.19 858.26 424.04 2,120.20
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 248.06 935.96 1,050.58 558.65 2,793.25
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 267.25 1,146.39 1,749.27 790.73 3,953.64
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 309.09 1,078.41 3,324.01 1,177.88 5,889.39
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 382.88 1,331.30 4,882.23 1,649.10 8,245.51
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 495.50 1,481.41 6,819.25 2,199.04 10,995.20
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 583.90 1,798.85 9,247.50 2,907.56 14,537.81
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 689.71 2,098.66 13,007.45 3,948.96 19,744.78
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 107.06 118.93 694.17 230.04 1,150.19
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 880.72 612.95 3,785.54 1,319.80 6,599.01
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.82 - 102.73 27.14 135.68
508a BRICK PAVING (SINGLE COURSE) SM 129.42 32.70 217.91 95.01 475.03
508b BRICK PAVING (DOUBLE COURSE) SM 230.60 32.70 428.81 173.03 865.14
Page 81
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohlu
Kohlu District Code: 36
509d GROUTED RIP RAP CLASS "A" CM 683.30 102.14 1,950.49 683.98 3,419.92
509e GROUTED RIP RAP CLASS "B" CM 657.78 81.72 1,792.91 633.10 3,165.51
509f GROUTED RIP RAP CLASS "C" CM 649.34 68.10 1,841.51 639.74 3,198.68
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 936.15 353.02 4,337.27 1,406.61 7,033.05
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 57.78 191.97 659.02 227.20 1,135.98
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 177.90 67.48 76.33 80.43 402.13
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 227.71 86.37 97.70 102.95 514.73
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 288.10 180.32 429.06 224.37 1,121.85
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 360.12 225.40 536.32 280.46 1,402.31
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 309.98 572.25 2,322.32 801.14 4,005.68
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,070.10 670.54 4,231.10 1,492.93 7,464.66
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 156.64 90.27 452.67 174.89 874.47
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 27.12 - 1,197.58 306.17 1,530.86
604d STEEL POST OF METAL GUARD RAIL EACH 96.43 976.73 3,776.31 1,212.37 6,061.84
605a CONCRETE BEAM GUARD RAIL M 84.56 30.82 610.37 181.44 907.20
605c CONCRETE POST FOR GUARD RAIL M 103.83 27.36 613.26 186.11 930.56
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 264.61 255.15 6,895.52 1,853.82 9,269.10
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 85.95 382.72 9,333.53 2,450.55 12,252.75
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 264.61 541.89 12,011.97 3,204.62 16,023.08
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 869.50 598.64 21,175.72 5,660.97 28,304.84
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 173.90 119.73 9,292.70 2,396.58 11,982.92
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.38 5.86 16.23 6.37 31.83
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.13 4.03 39.98 11.28 56.42
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.38 5.86 21.66 7.72 38.62
LINES OF 20 cm WIDTH
Page 82
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Kohlu
Kohlu District Code: 36
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.13 4.03 53.33 14.62 73.10
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 72.44 5.22 156.83 58.62 293.11
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 72.44 9.98 503.85 146.57 732.85
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.22 8.59 22.55 8.84 44.19
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.22 9.63 67.50 20.34 101.70
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.22 6.95 30.06 10.31 51.54
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.22 9.63 90.01 25.96 129.82
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 72.44 3.73 217.68 73.46 367.32
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 72.44 7.90 851.20 232.89 1,164.43
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 61.78 3.73 104.55 42.51 212.57
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 61.78 7.90 336.41 101.52 507.61
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 61.78 3.73 145.12 52.66 263.29
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 61.78 7.90 568.32 159.50 797.50
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.72 81.62 193.98 71.83 359.15
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.72 81.62 233.98 81.83 409.14
DOUBLE)
610b RIGHT OF WAY MARKER EACH 120.56 121.33 311.10 138.25 691.24
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 695.62 976.31 2,118.95 947.72 4,738.59
610d TEN KILOMETRE POST EACH 1,327.25 1,952.61 4,629.73 1,977.40 9,886.99
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 152.84 91.00 964.12 301.99 1,509.96
PRECAST PRESTRESSED R.C.C. POST
Page 83
.
Page 84
NATIONAL HIGHWAY AUTHORITY
LASBELA
(39)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 85
.
Page 86
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lasbela
Lasbela District Code: 39
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.52 173.32 1.17 45.75 228.77
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 24.06 456.54 2.63 120.81 604.04
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 96.25 1,826.16 10.51 483.23 2,416.15
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 152.58 316.30 50.82 129.92 649.62
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 19.86 337.99 - 89.46 447.32
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.28 262.40 - 68.92 344.60
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 152.58 316.30 50.82 129.92 649.62
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 24.30 316.03 - 85.08 425.41
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.06 263.92 - 68.49 342.47
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.35 137.60 0.38 36.83 184.17
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 72.43 287.11 70.80 107.59 537.94
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 135.00 427.01 33.88 148.97 744.87
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 112.96 292.53 - 101.37 506.87
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 69.43 238.86 - 77.07 385.37
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.22 174.71 5.09 47.00 235.02
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 23.87 482.48 54.04 140.10 700.49
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 17.90 416.71 2.42 109.26 546.29
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.30 177.46 7.94 48.68 243.38
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.40 76.32 5.09 22.20 111.02
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 17.09 110.29 3.03 32.60 163.01
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.68 27.34 1.46 7.62 38.09
Page 87
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lasbela
Lasbela District Code: 39
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.24 18.21 0.77 5.06 25.28
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.03 15.26 0.79 4.27 21.36
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.50 15.57 0.90 4.49 22.46
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 81.37 1,510.17 6,071.66 1,915.80 9,578.99
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 84.30 1,510.17 6,491.07 2,021.38 10,106.92
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 91.06 1,577.28 6,061.51 1,932.46 9,662.32
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 91.06 1,571.31 6,638.80 2,075.29 10,376.46
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 310.13 915.38 53,525.79 13,687.82 68,439.11
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 310.13 915.38 51,947.66 13,293.29 66,466.45
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 106.35 112.80 897.89 279.26 1,396.30
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 168.74 2,437.94 5,722.91 2,082.40 10,412.00
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 116.28 126.27 786.43 257.25 1,286.23
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.09 45.04 1.26 12.10 60.48
207b DEEP PATCHING (16-30 cm) SM 2.09 39.67 1.26 10.76 53.78
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.87 110.61 0.68 28.54 142.71
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.57 22.12 0.14 5.71 28.54
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.36 1.57 37.99 9.98 49.91
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.35 1.57 42.41 11.08 55.42
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 15.90 4.16 20.78
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 18.55 4.82 24.09
Page 88
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lasbela
Lasbela District Code: 39
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 76.86 1,489.33 7,128.56 2,173.69 10,868.44
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 76.86 1,438.23 7,699.83 2,303.73 11,518.66
"B")
307a DENSE GRADED HOT BIT-MAC CM 180.75 379.77 5,929.54 1,622.51 8,112.57
307b OPEN GRADED HOT BIT-MAC CM 180.75 379.77 5,747.29 1,576.95 7,884.76
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 30.00 590.65 2,080.27 675.23 3,376.15
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 32.54 650.70 45,619.60 11,575.71 57,878.55
401a1i CONCRETE CLASS "A1" (Underground) CM 526.34 1,059.94 3,934.48 1,380.19 6,900.94
401a1ii CONCRETE CLASS "A1" (On ground) CM 526.34 1,059.94 4,211.95 1,449.56 7,247.78
401a1iii CONCRETE CLASS "A1" (Elevated) CM 526.34 1,059.94 4,766.89 1,588.29 7,941.46
401a2i CONCRETE CLASS "A2" (Underground) CM 526.34 1,059.94 4,312.48 1,474.69 7,373.44
401a2ii CONCRETE CLASS "A2" (On ground) CM 526.34 1,059.94 4,589.95 1,544.06 7,720.28
401a2iii CONCRETE CLASS "A2" (Elevated) CM 526.34 1,059.94 5,144.89 1,682.79 8,413.96
401a3i CONCRETE CLASS "A3" (Underground) CM 526.34 1,059.94 4,690.48 1,569.19 7,845.94
401a3ii CONCRETE CLASS "A3" (On ground) CM 526.34 1,059.94 4,967.95 1,638.56 8,192.78
401a3iii CONCRETE CLASS "A3" (Elevated) CM 526.34 1,059.94 5,522.89 1,777.29 8,886.46
401ci CONCRETE CLASS "C" (Underground) CM 520.20 500.55 3,473.45 1,123.55 5,617.74
401cii CONCRETE CLASS "C" (On ground) CM 520.20 500.55 3,591.79 1,153.13 5,765.67
401ciii CONCRETE CLASS "C" (Elevated) CM 520.20 500.55 3,828.47 1,212.30 6,061.52
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,775.40 947.15 4,936.34 1,914.72 9,573.61
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,775.40 947.15 5,692.34 2,103.72 10,518.61
401gii PRECAST CONCRETE CLASS "B" CM 1,775.40 947.15 4,658.04 1,845.15 9,225.74
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,775.40 947.15 6,070.34 2,198.22 10,991.11
Page 89
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lasbela
Lasbela District Code: 39
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,775.40 947.15 6,448.34 2,292.72 11,463.61
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,775.40 947.15 6,826.34 2,387.22 11,936.11
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,581.88 781.47 61,478.00 15,960.34 79,801.69
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,581.88 781.47 68,828.00 17,797.84 88,989.19
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,243.40 5,393.81 55,552.99 15,547.55 77,737.76
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,917.21 15,659.05 133,753.41 38,082.42 190,412.09
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 114.89 - 305.91 105.20 526.00
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 114.89 - 305.71 105.15 525.75
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 22.24 69.68 118.84 52.69 263.46
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 371.55 1,654.04 814.09 709.92 3,549.61
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 557.33 2,481.06 1,221.13 1,064.88 5,324.41
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 557.33 2,481.06 915.12 988.38 4,941.90
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 928.89 4,135.11 1,098.17 1,540.54 7,702.70
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 796.19 4,884.94 1,286.77 1,741.98 8,709.88
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,393.33 6,909.78 1,407.04 2,427.54 12,137.69
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 26,013.82 45,769.30 104,753.18 44,134.08 220,670.38
407i PILE LOAD TEST UP TO 240 TON EACH 47,982.98 45,769.30 209,506.36 75,814.66 379,073.31
407j PILE LOAD TEST UP TO 360 TON EACH 69,952.14 50,188.38 314,259.54 108,600.02 543,000.08
407k CONFIRMATORY BORING (NX SIZE) M 212.85 1,582.02 6.37 450.31 2,251.54
411a STONE MASONRY RANDOM DRY CM 307.13 107.96 669.99 271.27 1,356.36
411b STONE MASONRY RANDOM WITH MORTAR CM 327.74 166.68 1,696.67 547.77 2,738.86
411c STONE MASONRY DRESSED UNCOURSED DRY CM 397.17 107.96 739.51 311.16 1,555.80
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 462.80 166.68 1,777.15 601.66 3,008.28
Page 90
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lasbela
Lasbela District Code: 39
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 622.26 264.08 1,682.34 642.17 3,210.85
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 258.35 437.48 643.41 334.81 1,674.05
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 249.81 577.19 834.18 415.30 2,076.48
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 246.07 935.96 1,069.87 562.97 2,814.86
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 256.98 1,146.39 1,598.24 750.40 3,752.02
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 295.85 1,078.41 2,297.88 918.04 4,590.18
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 364.67 1,331.30 3,614.57 1,327.64 6,638.18
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 471.93 1,481.41 4,680.52 1,658.46 8,292.32
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 558.34 1,798.85 5,964.71 2,080.48 10,402.38
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 661.54 2,098.66 9,213.99 2,993.55 14,967.73
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 258.35 507.33 722.12 371.95 1,859.76
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 249.81 577.19 853.00 420.00 2,100.00
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 241.85 935.96 1,044.45 555.56 2,777.81
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 256.98 1,146.39 1,743.70 786.77 3,933.84
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 295.85 1,078.41 3,316.05 1,172.58 5,862.89
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 364.67 1,331.30 4,871.88 1,641.96 8,209.81
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 471.93 1,481.41 6,808.95 2,190.57 10,952.86
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 558.34 1,798.85 9,234.98 2,898.04 14,490.22
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 661.54 2,098.66 12,992.85 3,938.26 19,691.31
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 107.23 118.93 485.48 177.91 889.55
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 796.67 612.95 3,485.82 1,223.86 6,119.29
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.07 - 109.21 28.82 144.09
508a BRICK PAVING (SINGLE COURSE) SM 117.53 32.70 223.93 93.54 467.69
508b BRICK PAVING (DOUBLE COURSE) SM 207.57 32.70 443.59 170.96 854.82
Page 91
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lasbela
Lasbela District Code: 39
509d GROUTED RIP RAP CLASS "A" CM 616.89 102.14 1,968.38 671.85 3,359.27
509e GROUTED RIP RAP CLASS "B" CM 591.79 81.72 1,819.06 623.14 3,115.72
509f GROUTED RIP RAP CLASS "C" CM 583.20 68.10 1,865.24 629.13 3,145.67
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 812.69 353.02 4,054.08 1,304.95 6,524.73
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 54.97 191.97 468.77 178.93 894.65
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 164.11 67.48 93.47 81.26 406.32
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 210.07 86.37 119.64 104.02 520.09
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 262.57 180.32 392.79 208.92 1,044.60
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 328.21 225.40 490.99 261.15 1,305.75
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 279.28 572.25 2,204.71 764.06 3,820.30
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 973.77 670.54 4,085.20 1,432.38 7,161.88
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 142.60 90.27 426.68 164.88 824.42
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 27.68 - 1,197.58 306.31 1,531.57
604d STEEL POST OF METAL GUARD RAIL EACH 102.74 976.73 3,776.31 1,213.95 6,069.73
605a CONCRETE BEAM GUARD RAIL M 79.97 30.82 597.66 177.11 885.57
605c CONCRETE POST FOR GUARD RAIL M 98.20 27.36 598.33 180.97 904.86
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 256.83 255.15 6,851.56 1,840.88 9,204.42
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 71.30 382.72 9,240.58 2,423.65 12,118.25
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 256.83 541.89 11,857.28 3,164.00 15,819.99
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 841.43 598.64 20,913.78 5,588.46 27,942.31
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 168.29 119.73 9,203.07 2,372.77 11,863.86
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.27 5.86 16.17 6.32 31.62
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.09 4.03 39.68 11.20 56.00
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.27 5.86 21.57 7.68 38.38
LINES OF 20 cm WIDTH
Page 92
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Lasbela
Lasbela District Code: 39
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.09 4.03 52.93 14.51 72.56
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 76.79 5.22 156.20 59.55 297.75
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 76.79 9.98 500.07 146.71 733.56
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.09 8.59 22.48 8.79 43.95
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.09 9.63 67.50 20.31 101.53
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.09 6.95 29.97 10.25 51.27
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.09 9.63 90.01 25.93 129.66
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 76.79 3.73 217.05 74.39 371.96
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 76.79 7.90 851.20 233.97 1,169.86
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 64.43 3.73 104.13 43.07 215.35
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 64.43 7.90 333.89 101.55 507.76
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 64.43 3.73 144.70 53.21 266.07
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 64.43 7.90 568.32 160.16 800.81
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.62 81.62 193.80 71.26 356.30
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.62 81.62 233.80 81.26 406.29
DOUBLE)
610b RIGHT OF WAY MARKER EACH 113.41 121.33 301.42 134.04 670.19
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 685.10 976.31 2,032.24 923.41 4,617.06
610d TEN KILOMETRE POST EACH 1,328.98 1,952.61 4,462.44 1,936.01 9,680.04
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 143.36 91.00 950.22 296.15 1,480.73
PRECAST PRESTRESSED R.C.C. POST
Page 93
.
Page 94
NATIONAL HIGHWAY AUTHORITY
LORALAI
(41)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 95
.
Page 96
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Loralai
Loralai District Code: 41
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.59 173.32 1.17 45.77 228.85
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.74 456.54 2.63 120.73 603.63
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 94.95 1,826.16 10.51 482.91 2,414.53
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 159.66 316.30 50.82 131.70 658.48
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 20.68 337.99 - 89.67 448.35
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.39 262.40 - 68.95 344.73
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 159.66 316.30 50.82 131.70 658.48
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 25.31 316.03 - 85.33 426.67
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.50 263.92 - 68.61 343.03
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.45 137.60 0.38 36.86 184.29
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 69.45 287.11 70.80 106.84 534.21
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 140.59 427.01 33.88 150.37 751.85
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 117.49 292.53 - 102.51 512.53
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 72.30 238.86 - 77.79 388.96
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.30 174.71 5.09 47.03 235.13
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 24.23 482.48 54.04 140.19 700.94
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.17 416.71 2.42 109.33 546.63
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.28 177.46 7.94 48.67 243.35
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.68 76.32 5.09 22.27 111.36
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 17.04 110.29 3.03 32.59 162.94
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.69 27.34 1.46 7.62 38.10
Page 97
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Loralai
Loralai District Code: 41
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.27 18.21 0.77 5.06 25.32
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.07 15.26 0.79 4.28 21.41
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.52 15.57 0.90 4.50 22.48
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 75.85 1,510.17 6,803.34 2,097.34 10,486.69
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 78.10 1,510.17 7,291.02 2,219.82 11,099.11
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 84.17 1,577.28 6,791.07 2,113.13 10,565.65
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 84.17 1,571.31 7,455.15 2,277.66 11,388.28
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 297.11 915.38 63,064.23 16,069.18 80,345.89
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 297.11 915.38 61,486.10 15,674.65 78,373.23
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 99.10 112.80 798.63 252.63 1,263.16
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 159.69 2,437.94 6,242.80 2,210.11 11,050.55
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 107.74 126.27 749.85 245.97 1,229.83
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.24 45.04 1.26 12.13 60.66
207b DEEP PATCHING (16-30 cm) SM 2.24 39.67 1.26 10.79 53.96
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.98 110.61 0.68 28.57 142.84
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.60 22.12 0.14 5.71 28.57
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.35 1.57 44.76 11.67 58.36
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.34 1.57 49.96 12.97 64.85
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 18.73 4.86 24.32
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 21.85 5.64 28.22
Page 98
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Loralai
Loralai District Code: 41
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 71.63 1,489.33 8,080.60 2,410.39 12,051.95
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 71.63 1,438.23 8,773.07 2,570.73 12,853.66
"B")
307a DENSE GRADED HOT BIT-MAC CM 180.03 379.77 6,869.14 1,857.24 9,286.18
307b OPEN GRADED HOT BIT-MAC CM 180.03 379.77 6,621.92 1,795.43 8,977.15
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 30.51 590.65 2,288.01 727.29 3,636.45
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 32.33 650.70 55,441.36 14,031.10 70,155.49
401a1i CONCRETE CLASS "A1" (Underground) CM 574.08 1,059.94 3,963.29 1,399.32 6,996.62
401a1ii CONCRETE CLASS "A1" (On ground) CM 574.08 1,059.94 4,240.76 1,468.69 7,343.46
401a1iii CONCRETE CLASS "A1" (Elevated) CM 574.08 1,059.94 4,795.70 1,607.43 8,037.14
401a2i CONCRETE CLASS "A2" (Underground) CM 574.08 1,059.94 4,341.29 1,493.82 7,469.12
401a2ii CONCRETE CLASS "A2" (On ground) CM 574.08 1,059.94 4,618.76 1,563.19 7,815.96
401a2iii CONCRETE CLASS "A2" (Elevated) CM 574.08 1,059.94 5,173.70 1,701.93 8,509.64
401a3i CONCRETE CLASS "A3" (Underground) CM 574.08 1,059.94 4,719.29 1,588.32 7,941.62
401a3ii CONCRETE CLASS "A3" (On ground) CM 574.08 1,059.94 4,996.76 1,657.69 8,288.46
401a3iii CONCRETE CLASS "A3" (Elevated) CM 574.08 1,059.94 5,551.70 1,796.43 8,982.14
401ci CONCRETE CLASS "C" (Underground) CM 569.19 500.55 3,461.57 1,132.83 5,664.13
401cii CONCRETE CLASS "C" (On ground) CM 569.19 500.55 3,579.91 1,162.41 5,812.05
401ciii CONCRETE CLASS "C" (Elevated) CM 569.19 500.55 3,816.60 1,221.58 6,107.91
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,919.81 947.15 4,971.28 1,959.56 9,797.80
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,919.81 947.15 5,727.28 2,148.56 10,742.80
401gii PRECAST CONCRETE CLASS "B" CM 1,919.81 947.15 4,616.70 1,870.92 9,354.58
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,919.81 947.15 6,105.28 2,243.06 11,215.30
Page 99
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Loralai
Loralai District Code: 41
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,919.81 947.15 6,483.28 2,337.56 11,687.80
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,919.81 947.15 6,861.28 2,432.06 12,160.30
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,686.08 781.47 61,478.00 15,986.39 79,931.93
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,686.08 781.47 68,828.00 17,823.89 89,119.43
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,332.87 5,393.81 55,878.77 15,651.36 78,256.82
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,914.23 15,659.05 133,823.62 38,099.22 190,496.11
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 122.60 - 328.17 112.69 563.45
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 122.60 - 326.25 112.21 561.05
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 22.32 69.68 115.80 51.95 259.76
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 384.60 1,654.04 902.88 735.38 3,676.90
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 576.90 2,481.06 1,354.32 1,103.07 5,515.36
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 576.90 2,481.06 1,002.77 1,015.18 5,075.92
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 961.50 4,135.11 1,183.25 1,569.96 7,849.82
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 824.14 4,884.94 1,365.77 1,768.71 8,843.57
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,442.25 6,909.78 1,500.36 2,463.10 12,315.48
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 24,347.90 45,769.30 104,754.94 43,718.04 218,590.18
407i PILE LOAD TEST UP TO 240 TON EACH 44,174.86 45,769.30 209,509.88 74,863.51 374,317.55
407j PILE LOAD TEST UP TO 360 TON EACH 64,001.82 50,188.38 314,264.82 107,113.75 535,568.77
407k CONFIRMATORY BORING (NX SIZE) M 213.16 1,582.02 6.37 450.39 2,251.94
411a STONE MASONRY RANDOM DRY CM 333.78 107.96 516.06 239.45 1,197.24
411b STONE MASONRY RANDOM WITH MORTAR CM 360.82 166.68 1,602.79 532.57 2,662.86
411c STONE MASONRY DRESSED UNCOURSED DRY CM 431.93 107.96 574.43 278.58 1,392.91
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 508.06 166.68 1,657.11 582.96 2,914.81
Page 100
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Loralai
Loralai District Code: 41
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 677.32 264.08 1,562.30 625.93 3,129.63
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 250.53 437.48 645.28 333.33 1,666.63
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 241.49 577.19 836.43 413.78 2,068.89
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 245.62 935.96 1,072.49 563.52 2,817.59
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 253.33 1,146.39 1,601.32 750.26 3,751.29
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 286.18 1,078.41 2,300.96 916.39 4,581.94
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 352.30 1,331.30 3,619.00 1,325.65 6,628.26
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 455.92 1,481.41 4,684.94 1,655.57 8,277.83
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 534.30 1,798.85 5,970.07 2,075.81 10,379.03
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 635.24 2,098.66 9,220.25 2,988.54 14,942.69
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 250.53 507.33 725.87 370.94 1,854.68
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 241.49 577.19 855.25 418.48 2,092.42
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 239.23 935.96 1,047.07 555.56 2,777.82
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 253.33 1,146.39 1,746.09 786.45 3,932.26
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 286.18 1,078.41 3,319.46 1,171.02 5,855.08
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 352.30 1,331.30 4,876.31 1,639.98 8,199.90
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 455.92 1,481.41 6,813.37 2,187.67 10,938.37
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 534.30 1,798.85 9,240.35 2,893.37 14,466.87
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 635.24 2,098.66 12,999.11 3,933.25 19,666.26
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 103.62 118.93 485.50 177.01 885.05
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 857.93 612.95 3,460.38 1,232.82 6,164.08
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.66 - 104.94 27.65 138.25
508a BRICK PAVING (SINGLE COURSE) SM 124.45 32.70 218.28 93.86 469.28
508b BRICK PAVING (DOUBLE COURSE) SM 222.60 32.70 432.29 171.90 859.50
Page 101
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Loralai
Loralai District Code: 41
509d GROUTED RIP RAP CLASS "A" CM 663.28 102.14 1,851.97 654.35 3,271.75
509e GROUTED RIP RAP CLASS "B" CM 639.60 81.72 1,699.99 605.33 3,026.63
509f GROUTED RIP RAP CLASS "C" CM 631.16 68.10 1,746.34 611.40 3,056.98
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 892.02 353.02 4,043.66 1,322.17 6,610.87
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 51.05 191.97 438.77 170.45 852.23
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 175.39 67.48 68.45 77.83 389.14
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 224.49 86.37 87.62 99.62 498.10
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 285.39 180.32 402.30 217.00 1,085.02
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 356.74 225.40 502.88 271.26 1,356.28
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 304.41 572.25 2,220.48 774.29 3,871.43
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,053.66 670.54 4,103.37 1,456.89 7,284.46
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 154.01 90.27 428.23 168.13 840.63
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 27.64 - 1,197.58 306.30 1,531.52
604d STEEL POST OF METAL GUARD RAIL EACH 107.51 976.73 3,776.31 1,215.14 6,075.69
605a CONCRETE BEAM GUARD RAIL M 79.26 30.82 598.85 177.23 886.17
605c CONCRETE POST FOR GUARD RAIL M 97.32 27.36 599.84 181.13 905.65
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 261.02 255.15 6,862.43 1,844.65 9,223.25
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 82.46 382.72 9,268.15 2,433.33 12,166.67
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 261.02 541.89 11,902.74 3,176.41 15,882.06
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 804.68 598.64 21,005.93 5,602.31 28,011.57
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 160.94 119.73 9,250.26 2,382.73 11,913.66
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.31 5.86 16.22 6.35 31.73
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.10 4.03 40.21 11.34 56.68
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.31 5.86 21.64 7.70 38.51
LINES OF 20 cm WIDTH
Page 102
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Loralai
Loralai District Code: 41
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.10 4.03 53.63 14.69 73.45
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 75.28 5.22 156.69 59.30 296.48
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 75.28 9.98 506.69 147.99 739.94
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.14 8.59 22.53 8.81 44.07
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.14 9.63 67.50 20.32 101.59
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.14 6.95 30.04 10.28 51.42
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.14 9.63 90.01 25.94 129.72
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 75.28 3.73 217.55 74.14 370.69
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 75.28 7.90 851.20 233.59 1,167.97
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 63.68 3.73 104.46 42.97 214.84
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 63.68 7.90 338.31 102.47 512.36
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 63.68 3.73 145.03 53.11 265.56
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 63.68 7.90 568.32 159.98 799.88
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.51 81.62 193.88 71.75 358.76
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.51 81.62 233.88 81.75 408.75
DOUBLE)
610b RIGHT OF WAY MARKER EACH 110.57 121.33 302.74 133.66 668.30
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 672.32 976.31 2,044.03 923.16 4,615.82
610d TEN KILOMETRE POST EACH 1,275.09 1,952.61 4,483.69 1,927.85 9,639.24
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 150.08 91.00 950.22 297.82 1,489.12
PRECAST PRESTRESSED R.C.C. POST
Page 103
.
Page 104
NATIONAL HIGHWAY AUTHORITY
MASTUNG
(47-B)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 105
.
Page 106
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mastung
Mastung District Code: 47-B
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.02 173.32 1.17 45.63 228.14
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 22.04 456.54 2.63 120.30 601.51
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 88.15 1,826.16 10.51 481.20 2,406.02
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 153.34 316.30 50.82 130.12 650.58
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 19.69 337.99 - 89.42 447.10
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.14 262.40 - 68.88 344.42
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 153.34 316.30 50.82 130.12 650.58
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 24.44 316.03 - 85.12 425.59
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.05 263.92 - 68.49 342.46
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.75 137.60 0.38 36.93 184.66
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 70.97 287.11 70.80 107.22 536.11
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 135.80 427.01 33.88 149.17 745.87
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 113.26 292.53 - 101.45 507.24
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 69.84 238.86 - 77.18 385.88
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.35 174.71 5.09 47.04 235.18
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 23.48 482.48 54.04 140.00 700.00
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 17.61 416.71 2.42 109.18 545.92
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.23 177.46 7.94 48.66 243.29
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.48 76.32 5.09 22.22 111.11
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 16.62 110.29 3.03 32.48 162.42
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.68 27.34 1.46 7.62 38.09
Page 107
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mastung
Mastung District Code: 47-B
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.25 18.21 0.77 5.06 25.29
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.01 15.26 0.79 4.27 21.33
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.50 15.57 0.90 4.49 22.45
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 74.56 1,510.17 6,447.04 2,007.94 10,039.70
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 77.68 1,510.17 6,927.54 2,128.85 10,644.23
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 83.76 1,577.28 6,435.79 2,024.21 10,121.05
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 83.76 1,571.31 7,084.10 2,184.79 10,923.97
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 298.41 915.38 58,676.79 14,972.64 74,863.22
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 298.41 915.38 57,098.66 14,578.11 72,890.56
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 91.62 112.80 864.69 267.28 1,336.39
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 160.95 2,437.94 6,024.94 2,155.96 10,779.80
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 99.22 126.27 759.81 246.33 1,231.64
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.10 45.04 1.26 12.10 60.49
207b DEEP PATCHING (16-30 cm) SM 2.10 39.67 1.26 10.76 53.79
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.92 110.61 0.68 28.55 142.76
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.58 22.12 0.14 5.71 28.55
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.36 1.57 41.64 10.89 54.47
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.35 1.57 46.49 12.10 60.51
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 17.43 4.54 22.69
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 20.33 5.26 26.32
Page 108
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mastung
Mastung District Code: 47-B
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 72.20 1,489.33 7,631.01 2,298.13 11,490.67
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 72.20 1,438.23 8,259.75 2,442.54 12,212.72
"B")
307a DENSE GRADED HOT BIT-MAC CM 171.58 379.77 6,411.48 1,740.71 8,703.55
307b OPEN GRADED HOT BIT-MAC CM 171.58 379.77 6,213.87 1,691.31 8,456.54
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 30.41 590.65 2,196.34 704.35 3,521.75
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 30.98 650.70 50,923.60 12,901.32 64,506.59
401a1i CONCRETE CLASS "A1" (Underground) CM 551.33 1,059.94 4,066.19 1,419.36 7,096.82
401a1ii CONCRETE CLASS "A1" (On ground) CM 551.33 1,059.94 4,343.66 1,488.73 7,443.67
401a1iii CONCRETE CLASS "A1" (Elevated) CM 551.33 1,059.94 4,898.61 1,627.47 8,137.35
401a2i CONCRETE CLASS "A2" (Underground) CM 551.33 1,059.94 4,444.19 1,513.86 7,569.32
401a2ii CONCRETE CLASS "A2" (On ground) CM 551.33 1,059.94 4,721.66 1,583.23 7,916.17
401a2iii CONCRETE CLASS "A2" (Elevated) CM 551.33 1,059.94 5,276.61 1,721.97 8,609.85
401a3i CONCRETE CLASS "A3" (Underground) CM 551.33 1,059.94 4,822.19 1,608.36 8,041.82
401a3ii CONCRETE CLASS "A3" (On ground) CM 551.33 1,059.94 5,099.66 1,677.73 8,388.67
401a3iii CONCRETE CLASS "A3" (Elevated) CM 551.33 1,059.94 5,654.61 1,816.47 9,082.35
401ci CONCRETE CLASS "C" (Underground) CM 527.80 500.55 3,611.31 1,159.91 5,799.57
401cii CONCRETE CLASS "C" (On ground) CM 527.80 500.55 3,729.65 1,189.50 5,947.50
401ciii CONCRETE CLASS "C" (Elevated) CM 527.80 500.55 3,966.34 1,248.67 6,243.35
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,730.00 947.15 5,078.54 1,938.92 9,694.61
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,730.00 947.15 5,834.54 2,127.92 10,639.61
401gii PRECAST CONCRETE CLASS "B" CM 1,730.00 947.15 4,821.09 1,874.56 9,372.81
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,730.00 947.15 6,212.54 2,222.42 11,112.11
Page 109
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mastung
Mastung District Code: 47-B
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,730.00 947.15 6,590.54 2,316.92 11,584.61
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,730.00 947.15 6,968.54 2,411.42 12,057.11
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,685.13 781.47 61,478.00 15,986.15 79,930.75
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,685.13 781.47 68,828.00 17,823.65 89,118.25
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,328.45 5,393.81 55,726.92 15,612.29 78,061.47
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,930.18 15,659.05 133,793.54 38,095.69 190,478.47
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 115.89 - 313.51 107.35 536.75
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 115.89 - 312.41 107.07 535.37
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 20.97 69.68 115.95 51.65 258.26
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 368.92 1,654.04 905.29 732.06 3,660.32
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 553.39 2,481.06 1,357.93 1,098.10 5,490.48
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 553.39 2,481.06 1,006.12 1,010.14 5,050.71
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 922.31 4,135.11 1,188.83 1,561.56 7,807.81
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 790.55 4,884.94 1,377.20 1,763.17 8,815.87
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,383.47 6,909.78 1,508.73 2,450.49 12,252.47
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 22,211.19 45,769.30 111,448.22 44,857.18 224,285.89
407i PILE LOAD TEST UP TO 240 TON EACH 40,133.25 45,769.30 222,896.44 77,199.75 385,998.74
407j PILE LOAD TEST UP TO 360 TON EACH 58,055.31 50,188.38 334,344.66 110,647.09 553,235.44
407k CONFIRMATORY BORING (NX SIZE) M 193.96 1,582.02 6.37 445.59 2,227.94
411a STONE MASONRY RANDOM DRY CM 285.82 107.96 499.77 223.39 1,116.93
411b STONE MASONRY RANDOM WITH MORTAR CM 306.24 166.68 1,676.57 537.37 2,686.87
411c STONE MASONRY DRESSED UNCOURSED DRY CM 366.49 107.96 556.84 257.82 1,289.12
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 427.25 166.68 1,707.07 575.25 2,876.26
Page 110
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mastung
Mastung District Code: 47-B
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 568.18 264.08 1,612.27 611.13 3,055.66
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 226.65 437.48 648.10 328.06 1,640.29
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 217.69 577.19 839.81 408.67 2,043.36
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 222.19 935.96 1,076.43 558.65 2,793.23
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 229.15 1,146.39 1,605.92 745.36 3,726.82
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 265.05 1,078.41 2,305.56 912.26 4,561.28
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 329.42 1,331.30 3,625.66 1,321.59 6,607.97
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 426.31 1,481.41 4,691.56 1,649.82 8,249.09
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 503.07 1,798.85 5,978.11 2,070.01 10,350.04
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 595.08 2,098.66 9,229.63 2,980.84 14,904.22
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 226.65 507.33 731.50 366.37 1,831.86
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 217.69 577.19 858.63 413.38 2,066.88
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 216.88 935.96 1,051.01 550.96 2,754.82
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 229.15 1,146.39 1,749.67 781.30 3,906.51
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 265.05 1,078.41 3,324.58 1,167.01 5,835.05
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 329.42 1,331.30 4,882.97 1,635.92 8,179.61
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 426.31 1,481.41 6,819.99 2,181.93 10,909.63
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 503.07 1,798.85 9,248.39 2,887.58 14,437.89
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 595.08 2,098.66 13,008.49 3,925.56 19,627.79
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 96.99 118.93 589.74 201.41 1,007.07
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 822.05 612.95 3,648.60 1,270.90 6,354.50
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.79 - 104.94 27.68 138.42
508a BRICK PAVING (SINGLE COURSE) SM 106.54 32.70 222.08 90.33 451.65
508b BRICK PAVING (DOUBLE COURSE) SM 187.22 32.70 439.14 164.76 823.82
Page 111
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mastung
Mastung District Code: 47-B
509d GROUTED RIP RAP CLASS "A" CM 561.50 102.14 1,891.98 638.91 3,194.53
509e GROUTED RIP RAP CLASS "B" CM 538.04 81.72 1,734.27 588.51 2,942.53
509f GROUTED RIP RAP CLASS "C" CM 529.04 68.10 1,782.59 594.93 2,974.66
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 778.59 353.02 4,207.60 1,334.80 6,674.01
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 48.85 191.97 487.17 182.00 909.99
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 150.78 67.48 65.81 71.02 355.08
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 193.00 86.37 84.23 90.90 454.50
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 241.61 180.32 406.69 207.16 1,035.78
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 302.01 225.40 508.36 258.94 1,294.72
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 292.33 572.25 2,273.55 784.53 3,922.67
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 951.09 670.54 4,159.15 1,445.19 7,225.97
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 138.64 90.27 441.37 167.57 837.85
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 25.77 - 1,197.58 305.84 1,529.18
604d STEEL POST OF METAL GUARD RAIL EACH 101.66 976.73 3,776.31 1,213.67 6,068.37
605a CONCRETE BEAM GUARD RAIL M 71.78 30.82 602.25 176.21 881.07
605c CONCRETE POST FOR GUARD RAIL M 88.13 27.36 603.99 179.87 899.36
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 236.24 255.15 6,859.22 1,837.65 9,188.25
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 70.12 382.72 9,283.20 2,434.01 12,170.06
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 236.24 541.89 11,930.42 3,177.14 15,885.68
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 733.73 598.64 21,036.10 5,592.12 27,960.59
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 146.75 119.73 9,242.66 2,377.28 11,886.42
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.10 5.86 16.19 6.29 31.44
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.03 4.03 39.96 11.26 56.28
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.10 5.86 21.61 7.64 38.21
LINES OF 20 cm WIDTH
Page 112
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Mastung
Mastung District Code: 47-B
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.03 4.03 53.30 14.59 72.95
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 75.96 5.22 156.46 59.41 297.05
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 75.96 9.98 503.58 147.38 736.91
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.87 8.59 22.51 8.74 43.71
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.87 9.63 67.50 20.25 101.26
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 3.87 6.95 30.01 10.21 51.04
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 3.87 9.63 90.01 25.88 129.39
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 75.96 3.73 217.32 74.25 371.26
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 75.96 7.90 851.20 233.76 1,168.82
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 63.71 3.73 104.31 42.93 214.67
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 63.71 7.90 336.23 101.96 509.79
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 63.71 3.73 144.88 53.08 265.39
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 63.71 7.90 568.32 159.98 799.91
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.92 81.62 193.99 71.38 356.91
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 9.92 81.62 233.99 81.38 406.90
DOUBLE)
610b RIGHT OF WAY MARKER EACH 100.15 121.33 306.41 131.97 659.86
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 619.19 976.31 2,076.55 918.01 4,590.07
610d TEN KILOMETRE POST EACH 1,197.54 1,952.61 4,543.64 1,923.45 9,617.23
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 136.86 91.00 957.70 296.39 1,481.95
PRECAST PRESTRESSED R.C.C. POST
Page 113
.
Page 114
NATIONAL HIGHWAY AUTHORITY
MUSAKHAIL
(47-C)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 115
.
Page 116
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Musakhail
Musakhail District Code: 47-C
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.47 173.32 1.17 45.74 228.70
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.42 456.54 2.63 120.65 603.24
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 93.70 1,826.16 10.51 482.59 2,412.96
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 157.47 316.30 50.82 131.15 655.74
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 20.30 337.99 - 89.57 447.86
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.15 262.40 - 68.89 344.43
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 157.47 316.30 50.82 131.15 655.74
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 24.98 316.03 - 85.25 426.26
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.29 263.92 - 68.55 342.77
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.26 137.60 0.38 36.81 184.05
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 67.74 287.11 70.80 106.41 532.07
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 138.77 427.01 33.88 149.92 749.58
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 115.93 292.53 - 102.12 510.58
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 71.37 238.86 - 77.56 387.79
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.14 174.71 5.09 46.99 234.93
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 23.81 482.48 54.04 140.08 700.42
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 17.86 416.71 2.42 109.25 546.23
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.11 177.46 7.94 48.63 243.13
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.52 76.32 5.09 22.23 111.16
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 16.72 110.29 3.03 32.51 162.55
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.66 27.34 1.46 7.61 38.07
Page 117
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Musakhail
Musakhail District Code: 47-C
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.25 18.21 0.77 5.06 25.29
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.05 15.26 0.79 4.28 21.38
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.48 15.57 0.90 4.49 22.43
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 74.79 1,510.17 6,472.20 2,014.29 10,071.45
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 77.03 1,510.17 6,975.12 2,140.58 10,702.88
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 83.02 1,577.28 6,460.92 2,030.31 10,151.53
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 83.02 1,571.31 7,132.66 2,196.75 10,983.74
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 294.46 915.38 59,234.31 15,111.04 75,555.18
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 294.46 915.38 57,656.18 14,716.50 73,582.52
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 97.93 112.80 897.87 277.15 1,385.75
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 157.04 2,437.94 6,083.08 2,169.52 10,847.59
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 106.61 126.27 769.46 250.59 1,252.93
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.19 45.04 1.26 12.12 60.60
207b DEEP PATCHING (16-30 cm) SM 2.19 39.67 1.26 10.78 53.90
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.93 110.61 0.68 28.55 142.77
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.59 22.12 0.14 5.71 28.55
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.35 1.57 42.04 10.99 54.95
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.34 1.57 46.93 12.21 61.05
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 17.59 4.58 22.89
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 20.53 5.31 26.56
Page 118
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Musakhail
Musakhail District Code: 47-C
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 70.56 1,489.33 7,675.88 2,308.94 11,544.72
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 70.56 1,438.23 8,305.45 2,453.56 12,267.80
"B")
307a DENSE GRADED HOT BIT-MAC CM 176.39 379.77 6,439.46 1,748.91 8,744.53
307b OPEN GRADED HOT BIT-MAC CM 176.39 379.77 6,266.60 1,705.69 8,528.46
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 29.51 590.65 2,215.92 709.02 3,545.09
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 32.04 650.70 51,497.68 13,045.11 65,225.53
401a1i CONCRETE CLASS "A1" (Underground) CM 549.12 1,059.94 3,983.03 1,398.02 6,990.10
401a1ii CONCRETE CLASS "A1" (On ground) CM 549.12 1,059.94 4,260.50 1,467.39 7,336.94
401a1iii CONCRETE CLASS "A1" (Elevated) CM 549.12 1,059.94 4,815.44 1,606.12 8,030.62
401a2i CONCRETE CLASS "A2" (Underground) CM 549.12 1,059.94 4,361.03 1,492.52 7,462.60
401a2ii CONCRETE CLASS "A2" (On ground) CM 549.12 1,059.94 4,638.50 1,561.89 7,809.44
401a2iii CONCRETE CLASS "A2" (Elevated) CM 549.12 1,059.94 5,193.44 1,700.62 8,503.12
401a3i CONCRETE CLASS "A3" (Underground) CM 549.12 1,059.94 4,739.03 1,587.02 7,935.10
401a3ii CONCRETE CLASS "A3" (On ground) CM 549.12 1,059.94 5,016.50 1,656.39 8,281.94
401a3iii CONCRETE CLASS "A3" (Elevated) CM 549.12 1,059.94 5,571.44 1,795.12 8,975.62
401ci CONCRETE CLASS "C" (Underground) CM 545.75 500.55 3,556.53 1,150.71 5,753.54
401cii CONCRETE CLASS "C" (On ground) CM 545.75 500.55 3,674.88 1,180.29 5,901.46
401ciii CONCRETE CLASS "C" (Elevated) CM 545.75 500.55 3,911.56 1,239.46 6,197.32
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,851.47 947.15 4,982.00 1,945.16 9,725.78
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,851.47 947.15 5,738.00 2,134.16 10,670.78
401gii PRECAST CONCRETE CLASS "B" CM 1,851.47 947.15 4,786.29 1,896.23 9,481.14
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,851.47 947.15 6,116.00 2,228.66 11,143.28
Page 119
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Musakhail
Musakhail District Code: 47-C
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,851.47 947.15 6,494.00 2,323.16 11,615.78
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,851.47 947.15 6,872.00 2,417.66 12,088.28
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,605.46 781.47 61,478.00 15,966.23 79,831.16
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,605.46 781.47 68,828.00 17,803.73 89,018.66
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,268.53 5,393.81 55,878.77 15,635.28 78,176.39
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,888.21 15,659.05 133,827.04 38,093.57 190,467.87
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 117.86 - 323.95 110.45 552.27
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 117.86 - 322.03 109.97 549.86
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 22.00 69.68 115.80 51.87 259.35
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 380.28 1,654.04 896.28 732.65 3,663.25
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 570.42 2,481.06 1,344.42 1,098.98 5,494.88
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 570.42 2,481.06 992.87 1,011.09 5,055.44
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 950.70 4,135.11 1,166.75 1,563.14 7,815.70
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 814.89 4,884.94 1,337.49 1,759.33 8,796.64
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,426.05 6,909.78 1,475.61 2,452.86 12,264.30
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 24,130.51 45,769.30 111,447.34 45,336.79 226,683.94
407i PILE LOAD TEST UP TO 240 TON EACH 43,780.44 45,769.30 222,894.68 78,111.11 390,555.53
407j PILE LOAD TEST UP TO 360 TON EACH 63,430.37 50,188.38 334,342.02 111,990.19 559,950.97
407k CONFIRMATORY BORING (NX SIZE) M 211.26 1,582.02 6.37 449.91 2,249.56
411a STONE MASONRY RANDOM DRY CM 324.40 107.96 537.38 242.43 1,212.17
411b STONE MASONRY RANDOM WITH MORTAR CM 350.33 166.68 1,664.14 545.29 2,726.44
411c STONE MASONRY DRESSED UNCOURSED DRY CM 419.93 107.96 597.47 281.34 1,406.70
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 493.63 166.68 1,710.16 592.62 2,963.09
Page 120
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Musakhail
Musakhail District Code: 47-C
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 658.76 264.08 1,615.35 634.55 3,172.75
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 246.92 437.48 646.53 332.73 1,663.67
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 237.96 577.19 837.94 413.27 2,066.35
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 241.53 935.96 1,074.25 562.93 2,814.67
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 249.35 1,146.39 1,603.36 749.78 3,748.88
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 281.91 1,078.41 2,303.00 915.83 4,579.16
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 347.04 1,331.30 3,621.96 1,325.08 6,625.38
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 449.12 1,481.41 4,687.88 1,654.60 8,273.00
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 526.83 1,798.85 5,973.65 2,074.83 10,374.16
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 626.54 2,098.66 9,224.42 2,987.40 14,937.02
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 246.92 507.33 728.37 370.66 1,853.28
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 237.96 577.19 856.76 417.97 2,089.87
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 235.71 935.96 1,048.83 555.12 2,775.62
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 249.35 1,146.39 1,747.68 785.86 3,929.28
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 281.91 1,078.41 3,321.74 1,170.52 5,852.58
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 347.04 1,331.30 4,879.27 1,639.40 8,197.02
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 449.12 1,481.41 6,816.31 2,186.71 10,933.54
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 526.83 1,798.85 9,243.92 2,892.40 14,462.00
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 626.54 2,098.66 13,003.28 3,932.12 19,660.60
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 102.35 118.93 589.73 202.75 1,013.76
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 824.73 612.95 3,612.23 1,262.48 6,312.39
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.55 - 104.94 27.62 138.12
508a BRICK PAVING (SINGLE COURSE) SM 121.39 32.70 227.73 95.45 477.27
508b BRICK PAVING (DOUBLE COURSE) SM 216.92 32.70 450.44 175.01 875.07
Page 121
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Musakhail
Musakhail District Code: 47-C
509d GROUTED RIP RAP CLASS "A" CM 646.37 102.14 1,898.32 661.71 3,308.54
509e GROUTED RIP RAP CLASS "B" CM 623.00 81.72 1,743.56 612.07 3,060.35
509f GROUTED RIP RAP CLASS "C" CM 614.70 68.10 1,791.01 618.45 3,092.26
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 861.52 353.02 4,173.37 1,346.98 6,734.89
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 50.28 191.97 479.70 180.49 902.45
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 171.00 67.48 71.92 77.60 387.99
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 218.88 86.37 92.06 99.33 496.63
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 277.84 180.32 405.93 216.02 1,080.11
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 347.30 225.40 507.41 270.03 1,350.14
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 291.23 572.25 2,230.62 773.52 3,867.62
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,015.82 670.54 4,108.95 1,448.83 7,244.13
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 148.68 90.27 433.79 168.18 840.91
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 27.39 - 1,197.58 306.24 1,531.21
604d STEEL POST OF METAL GUARD RAIL EACH 106.55 976.73 3,776.31 1,214.90 6,074.49
605a CONCRETE BEAM GUARD RAIL M 77.45 30.82 598.69 176.74 883.71
605c CONCRETE POST FOR GUARD RAIL M 95.10 27.36 599.60 180.52 902.58
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 256.02 255.15 6,872.64 1,845.95 9,229.77
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 78.82 382.72 9,291.98 2,438.38 12,191.90
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 256.02 541.89 11,942.74 3,185.16 15,925.80
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 792.25 598.64 21,065.93 5,614.20 28,071.02
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 158.45 119.73 9,262.26 2,385.11 11,925.55
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.23 5.86 16.22 6.33 31.63
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.08 4.03 40.21 11.33 56.64
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.23 5.86 21.64 7.68 38.41
LINES OF 20 cm WIDTH
Page 122
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Musakhail
Musakhail District Code: 47-C
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.08 4.03 53.63 14.68 73.42
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 72.38 5.22 156.69 58.57 292.86
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 72.38 9.98 506.69 147.26 736.32
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.04 8.59 22.53 8.79 43.95
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.04 9.63 67.50 20.29 101.47
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.04 6.95 30.04 10.26 51.29
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.04 9.63 90.01 25.92 129.59
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 72.38 3.73 217.55 73.41 367.07
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 72.38 7.90 851.20 232.87 1,164.34
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 61.26 3.73 104.46 42.36 211.81
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 61.26 7.90 338.31 101.87 509.33
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 61.26 3.73 145.03 52.51 262.53
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 61.26 7.90 568.32 159.37 796.85
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.91 81.62 193.93 71.62 358.08
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.91 81.62 233.93 81.61 408.07
DOUBLE)
610b RIGHT OF WAY MARKER EACH 108.41 121.33 302.58 133.08 665.39
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 657.45 976.31 2,044.34 919.52 4,597.62
610d TEN KILOMETRE POST EACH 1,248.22 1,952.61 4,481.69 1,920.63 9,603.15
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 146.03 91.00 954.74 297.94 1,489.72
PRECAST PRESTRESSED R.C.C. POST
Page 123
.
Page 124
NATIONAL HIGHWAY AUTHORITY
NASEERABAD
(48)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 125
.
Page 126
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Naseerabad
Naseerabad District Code: 48
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.13 173.32 1.17 45.65 228.27
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 22.65 456.54 2.63 120.46 602.28
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 90.62 1,826.16 10.51 481.82 2,409.11
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 148.12 316.30 50.82 128.81 644.05
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 19.84 337.99 - 89.46 447.29
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.08 262.40 - 68.87 344.34
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 148.12 316.30 50.82 128.81 644.05
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 23.53 316.03 - 84.89 424.45
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.12 263.92 - 68.51 342.55
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.28 137.60 0.38 36.82 184.08
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 70.62 287.11 70.80 107.13 535.67
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 130.70 427.01 33.88 147.90 739.49
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 109.66 292.53 - 100.55 502.75
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 67.22 238.86 - 76.52 382.60
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.23 174.71 5.09 47.01 235.04
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 23.39 482.48 54.04 139.98 699.89
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 17.54 416.71 2.42 109.17 545.84
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.20 177.46 7.94 48.65 243.25
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.42 76.32 5.09 22.21 111.04
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 16.72 110.29 3.03 32.51 162.55
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.65 27.34 1.46 7.61 38.05
Page 127
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Naseerabad
Naseerabad District Code: 48
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.23 18.21 0.77 5.05 25.26
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.01 15.26 0.79 4.27 21.33
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.51 15.57 0.90 4.49 22.47
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 77.41 1,510.17 6,487.70 2,018.82 10,094.09
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 80.31 1,510.17 6,951.99 2,135.62 10,678.08
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 86.27 1,577.28 6,476.94 2,035.12 10,175.62
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 86.27 1,571.31 7,106.33 2,190.98 10,954.88
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 282.63 915.38 57,585.99 14,696.00 73,479.99
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 282.63 915.38 56,007.86 14,301.47 71,507.33
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 97.52 112.80 984.34 298.67 1,493.33
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 164.34 2,437.94 6,092.48 2,173.69 10,868.46
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 105.99 126.27 761.82 248.52 1,242.60
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.09 45.04 1.26 12.10 60.48
207b DEEP PATCHING (16-30 cm) SM 2.09 39.67 1.26 10.76 53.78
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.74 110.61 0.68 28.51 142.54
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.55 22.12 0.14 5.70 28.51
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.35 1.57 40.87 10.70 53.49
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.34 1.57 45.62 11.88 59.41
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 17.10 4.46 22.28
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 19.96 5.17 25.84
Page 128
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Naseerabad
Naseerabad District Code: 48
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 74.13 1,489.33 7,645.19 2,302.16 11,510.81
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 74.13 1,438.23 8,266.66 2,444.75 12,223.77
"B")
307a DENSE GRADED HOT BIT-MAC CM 182.09 379.77 6,416.30 1,744.54 8,722.70
307b OPEN GRADED HOT BIT-MAC CM 182.09 379.77 6,226.40 1,697.07 8,485.33
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 33.00 590.65 2,193.23 704.22 3,521.09
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 29.83 650.70 49,800.40 12,620.23 63,101.16
401a1i CONCRETE CLASS "A1" (Underground) CM 593.40 1,059.94 4,189.22 1,460.64 7,303.20
401a1ii CONCRETE CLASS "A1" (On ground) CM 593.40 1,059.94 4,466.69 1,530.01 7,650.04
401a1iii CONCRETE CLASS "A1" (Elevated) CM 593.40 1,059.94 5,021.64 1,668.74 8,343.72
401a2i CONCRETE CLASS "A2" (Underground) CM 593.40 1,059.94 4,567.22 1,555.14 7,775.70
401a2ii CONCRETE CLASS "A2" (On ground) CM 593.40 1,059.94 4,844.69 1,624.51 8,122.54
401a2iii CONCRETE CLASS "A2" (Elevated) CM 593.40 1,059.94 5,399.64 1,763.24 8,816.22
401a3i CONCRETE CLASS "A3" (Underground) CM 593.40 1,059.94 4,945.22 1,649.64 8,248.20
401a3ii CONCRETE CLASS "A3" (On ground) CM 593.40 1,059.94 5,222.69 1,719.01 8,595.04
401a3iii CONCRETE CLASS "A3" (Elevated) CM 593.40 1,059.94 5,777.64 1,857.74 9,288.72
401ci CONCRETE CLASS "C" (Underground) CM 581.68 500.55 3,759.45 1,210.42 6,052.10
401cii CONCRETE CLASS "C" (On ground) CM 581.68 500.55 3,877.79 1,240.00 6,200.02
401ciii CONCRETE CLASS "C" (Elevated) CM 581.68 500.55 4,114.47 1,299.18 6,495.88
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,918.67 947.15 5,211.34 2,019.29 10,096.45
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,918.67 947.15 5,967.34 2,208.29 11,041.45
401gii PRECAST CONCRETE CLASS "B" CM 1,918.67 947.15 4,964.03 1,957.46 9,787.31
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,918.67 947.15 6,345.34 2,302.79 11,513.95
Page 129
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Naseerabad
Naseerabad District Code: 48
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,918.67 947.15 6,723.34 2,397.29 11,986.45
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,918.67 947.15 7,101.34 2,491.79 12,458.95
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,748.53 781.47 62,538.00 16,267.00 81,335.00
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,748.53 781.47 69,888.00 18,104.50 90,522.50
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,389.65 5,393.81 56,188.79 15,743.06 78,715.31
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 2,641.63 15,659.05 133,829.97 38,032.66 190,163.32
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 122.17 - 314.08 109.06 545.31
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 122.17 - 312.83 108.75 543.75
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 20.85 69.68 116.49 51.76 258.78
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 331.66 1,654.04 895.02 720.18 3,600.90
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 497.49 2,481.06 1,342.53 1,080.27 5,401.35
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 497.49 2,481.06 990.77 992.33 4,961.65
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 829.15 4,135.11 1,163.25 1,531.88 7,659.38
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 710.70 4,884.94 1,332.99 1,732.16 8,660.78
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,243.72 6,909.78 1,470.36 2,405.96 12,029.82
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 23,568.99 45,769.30 126,772.54 49,027.71 245,138.54
407i PILE LOAD TEST UP TO 240 TON EACH 43,218.92 45,769.30 253,545.08 85,633.33 428,166.63
407j PILE LOAD TEST UP TO 360 TON EACH 62,868.85 50,188.38 380,317.62 123,343.71 616,718.56
407k CONFIRMATORY BORING (NX SIZE) M 188.24 1,582.02 6.37 444.16 2,220.78
411a STONE MASONRY RANDOM DRY CM 328.76 107.96 634.34 267.77 1,338.84
411b STONE MASONRY RANDOM WITH MORTAR CM 355.57 166.68 1,841.17 590.86 2,954.28
411c STONE MASONRY DRESSED UNCOURSED DRY CM 426.04 107.96 702.17 309.04 1,545.22
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 501.49 166.68 1,874.92 635.77 3,178.87
Page 130
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Naseerabad
Naseerabad District Code: 48
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 669.24 264.08 1,780.11 678.36 3,391.80
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 243.81 437.48 649.04 332.58 1,662.91
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 235.85 577.19 840.94 413.49 2,067.46
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 237.23 935.96 1,077.75 562.73 2,813.67
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 245.44 1,146.39 1,607.46 749.82 3,749.11
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 281.81 1,078.41 2,307.10 916.83 4,584.15
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 349.71 1,331.30 3,627.88 1,327.22 6,636.10
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 452.56 1,481.41 4,693.77 1,656.93 8,284.67
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 530.39 1,798.85 5,980.80 2,077.51 10,387.55
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 629.00 2,098.66 9,232.76 2,990.10 14,950.52
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 243.81 507.33 733.38 371.13 1,855.66
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 235.85 577.19 859.76 418.20 2,090.99
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 229.95 935.96 1,052.33 554.56 2,772.80
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 245.44 1,146.39 1,750.87 785.67 3,928.37
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 281.81 1,078.41 3,326.29 1,171.63 5,858.14
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 349.71 1,331.30 4,885.19 1,641.55 8,207.74
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 452.56 1,481.41 6,822.20 2,189.04 10,945.21
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 530.39 1,798.85 9,251.07 2,895.08 14,475.39
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 629.00 2,098.66 13,011.62 3,934.82 19,674.09
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 99.04 118.93 704.67 230.66 1,153.29
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 877.25 612.95 3,782.76 1,318.24 6,591.19
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 5.62 - 112.48 29.52 147.62
508a BRICK PAVING (SINGLE COURSE) SM 123.57 32.70 230.79 96.77 483.83
508b BRICK PAVING (DOUBLE COURSE) SM 220.85 32.70 454.81 177.09 885.46
Page 131
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Naseerabad
Naseerabad District Code: 48
509d GROUTED RIP RAP CLASS "A" CM 658.06 102.14 2,045.32 701.38 3,506.91
509e GROUTED RIP RAP CLASS "B" CM 634.45 81.72 1,884.59 650.19 3,250.94
509f GROUTED RIP RAP CLASS "C" CM 625.99 68.10 1,934.68 657.19 3,285.96
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 903.73 353.02 4,334.58 1,397.83 6,989.17
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 51.55 191.97 628.00 217.88 1,089.41
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 171.94 67.48 87.67 81.77 408.87
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 220.09 86.37 112.22 104.67 523.35
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 280.44 180.32 436.34 224.28 1,121.38
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 350.55 225.40 545.43 280.35 1,401.73
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 314.43 572.25 2,337.63 806.08 4,030.39
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,054.17 670.54 4,250.25 1,493.74 7,468.69
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 153.80 90.27 455.00 174.77 873.83
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 23.89 - 1,197.58 305.37 1,526.83
604d STEEL POST OF METAL GUARD RAIL EACH 93.25 976.73 3,776.31 1,211.57 6,057.85
605a CONCRETE BEAM GUARD RAIL M 78.51 30.82 611.73 180.27 901.34
605c CONCRETE POST FOR GUARD RAIL M 96.40 27.36 614.95 184.68 923.40
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 250.84 255.15 6,875.06 1,845.26 9,226.31
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 84.59 382.72 9,312.33 2,444.91 12,224.56
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 250.84 541.89 11,979.31 3,193.01 15,965.05
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 785.72 598.64 21,110.96 5,623.83 28,119.16
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 157.14 119.73 9,260.82 2,384.42 11,922.12
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.23 5.86 16.20 6.32 31.61
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.08 4.03 40.00 11.28 56.38
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.23 5.86 21.61 7.68 38.38
LINES OF 20 cm WIDTH
Page 132
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Naseerabad
Naseerabad District Code: 48
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.08 4.03 53.35 14.61 73.07
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 74.85 5.22 156.50 59.14 295.71
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 74.85 9.98 504.05 147.22 736.11
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.04 8.59 22.51 8.78 43.92
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.04 9.63 67.50 20.29 101.47
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.04 6.95 30.02 10.25 51.26
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.04 9.63 90.01 25.92 129.59
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 74.85 3.73 217.36 73.98 369.92
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 74.85 7.90 851.20 233.49 1,167.44
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 63.36 3.73 104.33 42.86 214.28
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 63.36 7.90 336.54 101.95 509.75
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 63.36 3.73 144.90 53.00 264.99
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 63.36 7.90 568.32 159.90 799.48
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.88 81.62 194.03 71.88 359.41
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.88 81.62 234.03 81.88 409.41
DOUBLE)
610b RIGHT OF WAY MARKER EACH 109.45 121.33 312.62 135.85 679.24
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 659.34 976.31 2,132.47 942.03 4,710.14
610d TEN KILOMETRE POST EACH 1,249.74 1,952.61 4,654.42 1,964.19 9,820.96
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 145.34 91.00 964.77 300.28 1,501.38
PRECAST PRESTRESSED R.C.C. POST
Page 133
.
Page 134
NATIONAL HIGHWAY AUTHORITY
PANJGOOR
(51)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 135
.
Page 136
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Panjgoor
Panjgoor District Code: 51
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.71 173.32 1.17 45.80 229.00
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 24.71 456.54 2.63 120.97 604.84
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 98.83 1,826.16 10.51 483.87 2,419.37
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 153.70 316.30 50.82 130.21 651.03
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 20.71 337.99 - 89.68 448.38
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.66 262.40 - 69.01 345.07
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 153.70 316.30 50.82 130.21 651.03
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 24.42 316.03 - 85.11 425.57
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.50 263.92 - 68.61 343.03
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.26 137.60 0.38 36.81 184.05
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 74.81 287.11 70.80 108.18 540.91
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 135.69 427.01 33.88 149.15 745.73
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 114.15 292.53 - 101.67 508.36
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 69.78 238.86 - 77.16 385.81
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.41 174.71 5.09 47.05 235.27
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 24.45 482.48 54.04 140.24 701.21
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.34 416.71 2.42 109.37 546.83
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.55 177.46 7.94 48.74 243.68
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.61 76.32 5.09 22.25 111.27
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 17.54 110.29 3.03 32.71 163.57
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.70 27.34 1.46 7.62 38.12
Page 137
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Panjgoor
Panjgoor District Code: 51
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.25 18.21 0.77 5.06 25.29
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.05 15.26 0.79 4.28 21.38
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.55 15.57 0.90 4.50 22.52
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 84.45 1,510.17 6,469.13 2,015.93 10,079.67
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 87.35 1,510.17 6,935.68 2,133.30 10,666.50
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 93.92 1,577.28 6,458.26 2,032.37 10,161.83
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 93.92 1,571.31 7,090.41 2,188.91 10,944.54
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 300.14 915.38 57,755.67 14,742.80 73,713.98
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 300.14 915.38 56,177.54 14,348.26 71,741.32
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 110.42 112.80 952.32 293.89 1,469.43
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 174.58 2,437.94 6,066.97 2,169.87 10,849.37
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 120.92 126.27 728.85 244.01 1,220.06
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.15 45.04 1.26 12.11 60.55
207b DEEP PATCHING (16-30 cm) SM 2.15 39.67 1.26 10.77 53.84
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.78 110.61 0.68 28.52 142.59
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.56 22.12 0.14 5.70 28.52
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.36 1.57 40.99 10.73 53.66
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.35 1.57 45.76 11.92 59.60
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 17.16 4.47 22.35
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 20.01 5.18 25.92
Page 138
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Panjgoor
Panjgoor District Code: 51
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 79.63 1,489.33 7,630.47 2,299.86 11,499.28
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 79.63 1,438.23 8,252.75 2,442.65 12,213.26
"B")
307a DENSE GRADED HOT BIT-MAC CM 193.39 379.77 6,405.05 1,744.55 8,722.77
307b OPEN GRADED HOT BIT-MAC CM 193.39 379.77 6,212.49 1,696.41 8,482.06
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 33.39 590.65 2,191.16 703.80 3,518.99
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 31.90 650.70 49,975.12 12,664.43 63,322.15
401a1i CONCRETE CLASS "A1" (Underground) CM 589.46 1,059.94 4,147.49 1,449.22 7,246.11
401a1ii CONCRETE CLASS "A1" (On ground) CM 589.46 1,059.94 4,424.96 1,518.59 7,592.95
401a1iii CONCRETE CLASS "A1" (Elevated) CM 589.46 1,059.94 4,979.90 1,657.33 8,286.63
401a2i CONCRETE CLASS "A2" (Underground) CM 589.46 1,059.94 4,525.49 1,543.72 7,718.61
401a2ii CONCRETE CLASS "A2" (On ground) CM 589.46 1,059.94 4,802.96 1,613.09 8,065.45
401a2iii CONCRETE CLASS "A2" (Elevated) CM 589.46 1,059.94 5,357.90 1,751.83 8,759.13
401a3i CONCRETE CLASS "A3" (Underground) CM 589.46 1,059.94 4,903.49 1,638.22 8,191.11
401a3ii CONCRETE CLASS "A3" (On ground) CM 589.46 1,059.94 5,180.96 1,707.59 8,537.95
401a3iii CONCRETE CLASS "A3" (Elevated) CM 589.46 1,059.94 5,735.90 1,846.33 9,231.63
401ci CONCRETE CLASS "C" (Underground) CM 577.60 500.55 3,708.60 1,196.69 5,983.43
401cii CONCRETE CLASS "C" (On ground) CM 577.60 500.55 3,826.94 1,226.27 6,131.36
401ciii CONCRETE CLASS "C" (Elevated) CM 577.60 500.55 4,063.62 1,285.44 6,427.21
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,940.41 947.15 5,166.85 2,013.60 10,068.01
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,940.41 947.15 5,922.85 2,202.60 11,013.01
401gii PRECAST CONCRETE CLASS "B" CM 1,940.41 947.15 4,914.16 1,950.43 9,752.15
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,940.41 947.15 6,300.85 2,297.10 11,485.51
Page 139
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Panjgoor
Panjgoor District Code: 51
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,940.41 947.15 6,678.85 2,391.60 11,958.01
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,940.41 947.15 7,056.85 2,486.10 12,430.51
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,789.78 781.47 62,538.00 16,277.31 81,386.57
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,789.78 781.47 69,888.00 18,114.81 90,574.07
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,424.06 5,393.81 56,359.04 15,794.23 78,971.14
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,054.65 15,659.05 133,853.72 38,141.85 190,709.27
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 129.09 - 325.29 113.59 567.97
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 129.09 - 323.14 113.06 565.28
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 23.02 69.68 116.34 52.26 261.31
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 391.02 1,654.04 896.76 735.45 3,677.27
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 586.52 2,481.06 1,345.14 1,103.18 5,515.91
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 586.52 2,481.06 993.67 1,015.31 5,076.57
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 977.54 4,135.11 1,168.08 1,570.18 7,850.91
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 837.89 4,884.94 1,339.20 1,765.51 8,827.54
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,466.31 6,909.78 1,477.61 2,463.42 12,317.12
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 26,968.06 45,769.30 109,157.58 45,473.74 227,368.68
407i PILE LOAD TEST UP TO 240 TON EACH 49,963.44 45,769.30 218,315.16 78,511.98 392,559.88
407j PILE LOAD TEST UP TO 360 TON EACH 72,958.82 50,188.38 327,472.74 112,654.99 563,274.93
407k CONFIRMATORY BORING (NX SIZE) M 225.12 1,582.02 6.37 453.38 2,266.89
411a STONE MASONRY RANDOM DRY CM 315.76 107.96 505.32 232.26 1,161.30
411b STONE MASONRY RANDOM WITH MORTAR CM 336.35 166.68 1,692.13 548.79 2,743.95
411c STONE MASONRY DRESSED UNCOURSED DRY CM 408.04 107.96 546.40 265.60 1,327.99
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 474.76 166.68 1,704.13 586.39 2,931.97
Page 140
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Panjgoor
Panjgoor District Code: 51
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 638.73 264.08 1,609.33 628.03 3,140.17
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 265.35 437.48 648.41 337.81 1,689.05
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 257.38 577.19 840.19 418.69 2,093.45
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 253.52 935.96 1,076.87 566.59 2,832.93
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 265.31 1,146.39 1,606.43 754.53 3,772.67
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 305.06 1,078.41 2,306.07 922.39 4,611.94
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 375.40 1,331.30 3,626.40 1,333.27 6,666.37
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 485.82 1,481.41 4,692.30 1,664.88 8,324.40
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 575.21 1,798.85 5,979.01 2,088.27 10,441.34
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 677.59 2,098.66 9,230.67 3,001.73 15,008.66
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 265.35 507.33 732.13 376.20 1,881.01
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 257.38 577.19 859.01 423.39 2,116.97
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 247.13 935.96 1,051.45 558.63 2,793.17
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 265.31 1,146.39 1,750.07 790.44 3,952.21
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 305.06 1,078.41 3,325.15 1,177.16 5,885.79
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 375.40 1,331.30 4,883.71 1,647.60 8,238.01
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 485.82 1,481.41 6,820.73 2,196.99 10,984.94
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 575.21 1,798.85 9,249.28 2,905.84 14,529.19
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 677.59 2,098.66 13,009.53 3,946.45 19,732.23
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 108.87 118.93 572.56 200.09 1,000.44
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 879.75 612.95 3,733.28 1,306.49 6,532.47
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.17 - 103.92 27.52 137.62
508a BRICK PAVING (SINGLE COURSE) SM 120.38 32.70 212.30 91.35 456.73
508b BRICK PAVING (DOUBLE COURSE) SM 212.66 32.70 419.85 166.30 831.50
Page 141
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Panjgoor
Panjgoor District Code: 51
509d GROUTED RIP RAP CLASS "A" CM 629.77 102.14 1,903.79 658.93 3,294.63
509e GROUTED RIP RAP CLASS "B" CM 604.33 81.72 1,745.38 607.86 3,039.29
509f GROUTED RIP RAP CLASS "C" CM 595.88 68.10 1,793.98 614.49 3,072.45
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 879.85 353.02 4,287.68 1,380.14 6,900.69
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 57.11 191.97 478.24 181.83 909.16
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 167.86 67.48 66.71 75.51 377.55
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 214.86 86.37 85.39 96.65 483.26
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 268.24 180.32 405.55 213.53 1,067.64
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 335.30 225.40 506.94 266.91 1,334.55
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 312.66 572.25 2,316.29 800.30 4,001.50
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,064.19 670.54 4,227.12 1,490.46 7,452.30
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 154.98 90.27 449.75 173.75 868.75
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 28.69 - 1,197.58 306.57 1,532.83
604d STEEL POST OF METAL GUARD RAIL EACH 102.84 976.73 3,776.31 1,213.97 6,069.85
605a CONCRETE BEAM GUARD RAIL M 84.33 30.82 610.18 181.33 906.67
605c CONCRETE POST FOR GUARD RAIL M 103.54 27.36 613.06 185.99 929.96
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 267.15 255.15 6,882.95 1,851.31 9,256.57
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 79.13 382.72 9,319.14 2,445.25 12,226.25
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 267.15 541.89 11,989.20 3,199.56 15,997.79
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 879.01 598.64 21,138.51 5,654.04 28,270.21
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 175.80 119.73 9,281.60 2,394.28 11,971.41
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.40 5.86 16.22 6.37 31.86
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.13 4.03 40.28 11.36 56.81
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.40 5.86 21.65 7.73 38.64
LINES OF 20 cm WIDTH
Page 142
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Panjgoor
Panjgoor District Code: 51
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.13 4.03 53.73 14.72 73.61
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 82.74 5.22 156.77 61.18 305.91
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 82.74 9.98 507.62 150.09 750.43
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.26 8.59 22.54 8.85 44.23
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.26 9.63 67.50 20.35 101.74
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.26 6.95 30.05 10.31 51.57
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.26 9.63 90.01 25.97 129.87
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 82.74 3.73 217.63 76.02 380.12
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 82.74 7.90 851.20 235.46 1,177.30
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 69.56 3.73 104.51 44.45 222.25
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 69.56 7.90 338.93 104.10 520.48
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 69.56 3.73 145.08 54.59 272.97
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 69.56 7.90 568.32 161.45 807.23
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.82 81.62 194.00 71.61 358.05
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.82 81.62 234.00 81.61 408.05
DOUBLE)
610b RIGHT OF WAY MARKER EACH 119.64 121.33 310.94 137.98 689.88
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 709.67 976.31 2,117.88 950.96 4,754.82
610d TEN KILOMETRE POST EACH 1,380.90 1,952.61 4,626.54 1,990.01 9,950.07
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 152.37 91.00 962.48 301.46 1,507.31
PRECAST PRESTRESSED R.C.C. POST
Page 143
.
Page 144
NATIONAL HIGHWAY AUTHORITY
PISHIN
(53)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 145
.
Page 146
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Pishin
Pishin District Code: 53
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 9.18 173.32 1.17 45.92 229.58
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 26.25 456.54 2.63 121.35 606.77
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 105.01 1,826.16 10.51 485.42 2,427.10
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 152.17 316.30 50.82 129.82 649.11
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 21.01 337.99 - 89.75 448.75
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 13.70 262.40 - 69.02 345.12
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 152.17 316.30 50.82 129.82 649.11
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 24.07 316.03 - 85.03 425.13
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 10.66 263.92 - 68.65 343.23
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 9.30 137.60 0.38 36.82 184.10
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 78.27 287.11 70.80 109.05 545.24
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 133.75 427.01 33.88 148.66 743.30
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 112.74 292.53 - 101.32 506.59
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 68.79 238.86 - 76.91 384.56
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 8.50 174.71 5.09 47.07 235.37
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 24.96 482.48 54.04 140.37 701.85
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 18.72 416.71 2.42 109.46 547.31
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 9.74 177.46 7.94 48.78 243.92
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 7.75 76.32 5.09 22.29 111.45
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 18.17 110.29 3.03 32.87 164.36
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.72 27.34 1.46 7.63 38.14
Page 147
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Pishin
Pishin District Code: 53
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.28 18.21 0.77 5.07 25.33
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.09 15.26 0.79 4.29 21.43
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.62 15.57 0.90 4.52 22.61
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 89.06 1,510.17 6,605.90 2,051.28 10,256.41
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 91.74 1,510.17 7,104.11 2,176.51 10,882.53
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 98.33 1,577.28 6,594.22 2,067.46 10,337.29
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 98.33 1,571.31 7,264.03 2,233.42 11,167.08
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 295.99 915.38 60,652.35 15,465.93 77,329.64
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 295.99 915.38 59,074.22 15,071.40 75,356.98
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 119.14 112.80 848.25 270.05 1,350.24
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 181.82 2,437.94 6,142.50 2,190.56 10,952.82
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 130.31 126.27 738.54 248.78 1,243.90
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.20 45.04 1.26 12.12 60.62
207b DEEP PATCHING (16-30 cm) SM 2.20 39.67 1.26 10.78 53.92
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 2.78 110.61 0.68 28.52 142.59
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.56 22.12 0.14 5.70 28.52
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.36 1.57 43.05 11.25 56.23
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.35 1.57 48.05 12.49 62.46
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 18.02 4.69 23.43
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.14 0.58 21.02 5.44 27.18
Page 148
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Pishin
Pishin District Code: 53
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 83.16 1,489.33 7,836.58 2,352.27 11,761.34
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 83.16 1,438.23 8,489.60 2,502.75 12,513.74
"B")
307a DENSE GRADED HOT BIT-MAC CM 207.60 379.77 6,613.15 1,800.13 9,000.65
307b OPEN GRADED HOT BIT-MAC CM 207.60 379.77 6,400.93 1,747.07 8,735.37
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 36.89 590.65 2,240.15 716.92 3,584.62
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 32.52 650.70 52,957.84 13,410.27 67,051.33
401a1i CONCRETE CLASS "A1" (Underground) CM 653.80 1,059.94 3,936.51 1,412.56 7,062.82
401a1ii CONCRETE CLASS "A1" (On ground) CM 653.80 1,059.94 4,213.98 1,481.93 7,409.66
401a1iii CONCRETE CLASS "A1" (Elevated) CM 653.80 1,059.94 4,768.93 1,620.67 8,103.34
401a2i CONCRETE CLASS "A2" (Underground) CM 653.80 1,059.94 4,314.51 1,507.06 7,535.32
401a2ii CONCRETE CLASS "A2" (On ground) CM 653.80 1,059.94 4,591.98 1,576.43 7,882.16
401a2iii CONCRETE CLASS "A2" (Elevated) CM 653.80 1,059.94 5,146.93 1,715.17 8,575.84
401a3i CONCRETE CLASS "A3" (Underground) CM 653.80 1,059.94 4,692.51 1,601.56 8,007.82
401a3ii CONCRETE CLASS "A3" (On ground) CM 653.80 1,059.94 4,969.98 1,670.93 8,354.66
401a3iii CONCRETE CLASS "A3" (Elevated) CM 653.80 1,059.94 5,524.93 1,809.67 9,048.34
401ci CONCRETE CLASS "C" (Underground) CM 648.79 500.55 3,470.00 1,154.83 5,774.17
401cii CONCRETE CLASS "C" (On ground) CM 648.79 500.55 3,588.34 1,184.42 5,922.09
401ciii CONCRETE CLASS "C" (Elevated) CM 648.79 500.55 3,825.02 1,243.59 6,217.95
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 2,167.05 947.15 4,937.23 2,012.86 10,064.29
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 2,167.05 947.15 5,693.23 2,201.86 11,009.29
401gii PRECAST CONCRETE CLASS "B" CM 2,167.05 947.15 4,668.47 1,945.67 9,728.34
401giii(1) PRECAST CONCRETE CLASS "D1" CM 2,167.05 947.15 6,071.23 2,296.36 11,481.79
Page 149
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Pishin
Pishin District Code: 53
401giii(2) PRECAST CONCRETE CLASS "D2" CM 2,167.05 947.15 6,449.23 2,390.86 11,954.29
401giii(3) PRECAST CONCRETE CLASS "D3" CM 2,167.05 947.15 6,827.23 2,485.36 12,426.79
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 2,003.87 781.47 60,418.00 15,800.84 79,004.18
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 2,003.87 781.47 67,768.00 17,638.34 88,191.68
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,587.47 5,393.81 55,360.63 15,585.48 77,927.39
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,008.07 15,659.05 133,774.13 38,110.31 190,551.56
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 142.65 - 319.49 115.54 577.69
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 142.65 - 318.09 115.19 575.94
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 23.47 69.68 115.32 52.12 260.60
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 396.93 1,654.04 986.86 759.46 3,797.29
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 595.39 2,481.06 1,480.29 1,139.19 5,695.93
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 595.39 2,481.06 1,082.83 1,039.82 5,199.11
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 992.32 4,135.11 1,255.68 1,595.78 7,978.88
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 850.56 4,884.94 1,425.67 1,790.29 8,951.47
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,488.48 6,909.78 1,574.68 2,493.24 12,466.18
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 28,869.77 45,769.30 89,340.86 40,994.98 204,974.92
407i PILE LOAD TEST UP TO 240 TON EACH 54,070.94 45,769.30 178,681.72 69,630.49 348,152.46
407j PILE LOAD TEST UP TO 360 TON EACH 79,272.12 50,188.38 268,022.58 99,370.77 496,853.85
407k CONFIRMATORY BORING (NX SIZE) M 234.83 1,582.02 6.37 455.81 2,279.03
411a STONE MASONRY RANDOM DRY CM 347.02 107.96 728.44 295.86 1,479.28
411b STONE MASONRY RANDOM WITH MORTAR CM 370.15 166.68 1,795.15 583.00 2,914.98
411c STONE MASONRY DRESSED UNCOURSED DRY CM 449.28 107.96 803.81 340.26 1,701.32
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 523.54 166.68 1,871.47 640.42 3,202.12
Page 150
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Pishin
Pishin District Code: 53
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 704.94 264.08 1,776.67 686.42 3,432.11
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 286.52 437.48 644.66 342.16 1,710.82
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 278.88 577.19 835.68 422.94 2,114.69
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 271.21 935.96 1,071.62 569.70 2,848.48
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 284.74 1,146.39 1,600.29 757.85 3,789.27
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 325.44 1,078.41 2,299.93 925.95 4,629.74
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 398.09 1,331.30 3,617.53 1,336.73 6,683.64
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 515.17 1,481.41 4,683.47 1,670.01 8,350.05
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 609.04 1,798.85 5,968.28 2,094.04 10,470.22
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 715.24 2,098.66 9,218.16 3,008.01 15,040.07
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 286.52 507.33 724.62 379.62 1,898.09
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 278.88 577.19 854.50 427.64 2,138.22
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 262.45 935.96 1,046.20 561.15 2,805.76
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 284.74 1,146.39 1,745.29 794.10 3,970.52
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 325.44 1,078.41 3,318.33 1,180.55 5,902.73
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 398.09 1,331.30 4,874.84 1,651.06 8,255.28
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 515.17 1,481.41 6,811.90 2,202.12 11,010.59
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 609.04 1,798.85 9,238.56 2,911.61 14,558.07
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 715.24 2,098.66 12,997.02 3,952.73 19,763.65
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 115.34 118.93 410.42 161.17 805.86
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 973.42 612.95 3,497.50 1,270.97 6,354.83
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.37 - 104.11 27.62 138.10
508a BRICK PAVING (SINGLE COURSE) SM 131.81 32.70 209.52 93.51 467.53
508b BRICK PAVING (DOUBLE COURSE) SM 234.07 32.70 416.53 170.83 854.13
Page 151
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Pishin
Pishin District Code: 53
509d GROUTED RIP RAP CLASS "A" CM 690.10 102.14 2,051.85 711.02 3,555.12
509e GROUTED RIP RAP CLASS "B" CM 663.60 81.72 1,899.47 661.19 3,305.97
509f GROUTED RIP RAP CLASS "C" CM 655.26 68.10 1,947.04 667.60 3,338.00
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 991.87 353.02 4,064.87 1,352.44 6,762.20
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 61.35 191.97 357.32 152.66 763.31
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 183.42 67.48 102.97 88.47 442.33
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 234.78 86.37 131.80 113.24 566.18
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 294.19 180.32 415.74 222.56 1,112.82
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 367.74 225.40 519.68 278.20 1,391.02
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 346.64 572.25 2,206.24 781.28 3,906.42
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,188.39 670.54 4,063.62 1,480.64 7,403.18
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 172.58 90.27 426.40 172.31 861.56
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 30.06 - 1,197.58 306.91 1,534.54
604d STEEL POST OF METAL GUARD RAIL EACH 102.93 976.73 3,776.31 1,213.99 6,069.96
605a CONCRETE BEAM GUARD RAIL M 92.71 30.82 592.76 179.07 895.37
605c CONCRETE POST FOR GUARD RAIL M 113.83 27.36 592.97 183.54 917.71
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 282.28 255.15 6,859.76 1,849.30 9,246.49
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 92.05 382.72 9,261.19 2,433.99 12,169.95
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 282.28 541.89 11,890.48 3,178.66 15,893.31
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 945.71 598.64 20,981.15 5,631.37 28,156.87
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 189.14 119.73 9,236.27 2,386.29 11,931.43
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.68 5.86 16.20 6.44 32.18
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.23 4.03 40.06 11.33 56.64
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.68 5.86 21.62 7.79 38.95
LINES OF 20 cm WIDTH
Page 152
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Pishin
Pishin District Code: 53
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.23 4.03 53.43 14.67 73.35
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 89.24 5.22 156.55 62.75 313.75
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 89.24 9.98 504.78 151.00 755.00
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.61 8.59 22.52 8.93 44.64
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.61 9.63 67.50 20.44 102.18
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.61 6.95 30.02 10.39 51.97
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.61 9.63 90.01 26.06 130.30
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 89.24 3.73 217.41 77.59 387.96
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 89.24 7.90 851.20 237.08 1,185.42
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 75.36 3.73 104.37 45.86 229.32
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 75.36 7.90 337.03 105.07 525.35
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 75.36 3.73 144.94 56.01 280.03
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 75.36 7.90 568.32 162.90 814.48
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 12.68 81.62 193.85 72.04 360.19
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 12.68 81.62 233.85 82.04 410.18
DOUBLE)
610b RIGHT OF WAY MARKER EACH 131.68 121.33 300.10 138.28 691.39
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 765.94 976.31 2,017.74 940.00 4,699.98
610d TEN KILOMETRE POST EACH 1,485.61 1,952.61 4,431.68 1,967.48 9,837.38
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 166.45 91.00 949.98 301.86 1,509.29
PRECAST PRESTRESSED R.C.C. POST
Page 153
.
Page 154
NATIONAL HIGHWAY AUTHORITY
QUETTA
(54)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 155
.
Page 156
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Quetta
Quetta District Code: 54
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 10.43 173.32 1.17 46.23 231.15
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 29.60 456.54 2.63 122.19 610.96
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 118.42 1,826.16 10.51 488.77 2,443.86
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 177.93 316.30 50.82 136.26 681.32
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 23.46 337.99 - 90.36 451.82
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 15.17 262.40 - 69.39 346.96
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 177.93 316.30 50.82 136.26 681.32
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 28.22 316.03 - 86.06 430.31
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 11.83 263.92 - 68.94 344.70
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 10.40 137.60 0.38 37.09 185.47
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 83.25 287.11 70.80 110.29 551.46
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 156.75 427.01 33.88 154.41 772.06
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 131.45 292.53 - 106.00 529.98
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 80.62 238.86 - 79.87 399.35
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 9.35 174.71 5.09 47.29 236.44
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 27.94 482.48 54.04 141.12 705.58
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 20.96 416.71 2.42 110.02 550.11
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 10.71 177.46 7.94 49.03 245.14
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 8.61 76.32 5.09 22.50 112.52
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 20.02 110.29 3.03 33.33 166.67
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.93 27.34 1.46 7.68 38.40
Page 157
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Quetta
Quetta District Code: 54
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.43 18.21 0.77 5.10 25.52
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.23 15.26 0.79 4.32 21.61
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.74 15.57 0.90 4.55 22.76
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 96.79 1,510.17 6,459.05 2,016.50 10,082.51
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 99.47 1,510.17 6,943.05 2,138.17 10,690.86
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 106.64 1,577.28 6,447.57 2,032.87 10,164.37
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 106.64 1,571.31 7,100.75 2,194.67 10,973.37
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 343.04 915.38 59,282.79 15,135.30 75,676.51
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 343.04 915.38 57,704.66 14,740.77 73,703.85
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 130.97 112.80 815.46 264.81 1,324.04
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 196.65 2,437.94 6,012.73 2,161.83 10,809.15
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 143.55 126.27 648.17 229.50 1,147.49
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.49 45.04 1.26 12.19 60.97
207b DEEP PATCHING (16-30 cm) SM 2.49 39.67 1.26 10.85 54.27
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.22 110.61 0.68 28.63 143.13
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.64 22.12 0.14 5.73 28.63
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.41 1.57 42.07 11.01 55.07
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.40 1.57 46.97 12.23 61.17
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 17.61 4.59 22.94
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 20.54 5.32 26.61
Page 158
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Quetta
Quetta District Code: 54
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 89.86 1,489.33 7,656.07 2,308.82 11,544.08
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 89.86 1,438.23 8,291.67 2,454.94 12,274.71
"B")
307a DENSE GRADED HOT BIT-MAC CM 224.92 379.77 6,442.66 1,761.84 8,809.19
307b OPEN GRADED HOT BIT-MAC CM 224.92 379.77 6,234.06 1,709.69 8,548.44
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 37.71 590.65 2,201.35 707.43 3,537.13
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 38.41 650.70 51,547.60 13,059.18 65,295.88
401a1i CONCRETE CLASS "A1" (Underground) CM 661.92 1,059.94 3,960.44 1,420.58 7,102.88
401a1ii CONCRETE CLASS "A1" (On ground) CM 661.92 1,059.94 4,237.91 1,489.94 7,449.72
401a1iii CONCRETE CLASS "A1" (Elevated) CM 661.92 1,059.94 4,792.86 1,628.68 8,143.40
401a2i CONCRETE CLASS "A2" (Underground) CM 661.92 1,059.94 4,338.44 1,515.08 7,575.38
401a2ii CONCRETE CLASS "A2" (On ground) CM 661.92 1,059.94 4,615.91 1,584.44 7,922.22
401a2iii CONCRETE CLASS "A2" (Elevated) CM 661.92 1,059.94 5,170.86 1,723.18 8,615.90
401a3i CONCRETE CLASS "A3" (Underground) CM 661.92 1,059.94 4,716.44 1,609.58 8,047.88
401a3ii CONCRETE CLASS "A3" (On ground) CM 661.92 1,059.94 4,993.91 1,678.94 8,394.72
401a3iii CONCRETE CLASS "A3" (Elevated) CM 661.92 1,059.94 5,548.86 1,817.68 9,088.40
401ci CONCRETE CLASS "C" (Underground) CM 661.86 500.55 3,487.67 1,162.52 5,812.59
401cii CONCRETE CLASS "C" (On ground) CM 661.86 500.55 3,606.01 1,192.10 5,960.52
401ciii CONCRETE CLASS "C" (Elevated) CM 661.86 500.55 3,842.70 1,251.27 6,256.37
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 2,263.36 947.15 4,964.47 2,043.75 10,218.73
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 2,263.36 947.15 5,720.47 2,232.75 11,163.73
401gii PRECAST CONCRETE CLASS "B" CM 2,263.36 947.15 4,687.40 1,974.48 9,872.39
401giii(1) PRECAST CONCRETE CLASS "D1" CM 2,263.36 947.15 6,098.47 2,327.25 11,636.23
Page 159
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Quetta
Quetta District Code: 54
401giii(2) PRECAST CONCRETE CLASS "D2" CM 2,263.36 947.15 6,476.47 2,421.75 12,108.73
401giii(3) PRECAST CONCRETE CLASS "D3" CM 2,263.36 947.15 6,854.47 2,516.25 12,581.23
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 2,012.42 781.47 60,418.00 15,802.97 79,014.86
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 2,012.42 781.47 67,768.00 17,640.47 88,202.36
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,585.69 5,393.81 55,319.37 15,574.72 77,873.59
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,394.45 15,659.05 133,778.91 38,208.10 191,040.52
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 148.40 - 315.88 116.07 580.35
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 148.40 - 314.63 115.76 578.78
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 26.81 69.68 115.32 52.95 264.76
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 451.26 1,654.04 905.56 752.72 3,763.59
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 676.89 2,481.06 1,358.35 1,129.08 5,645.38
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 676.89 2,481.06 1,006.58 1,041.13 5,205.67
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 1,128.16 4,135.11 1,189.60 1,613.22 8,066.08
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 966.99 4,884.94 1,378.21 1,807.53 9,037.67
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,692.24 6,909.78 1,509.88 2,527.97 12,639.87
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 32,234.43 45,769.30 109,158.46 46,790.55 233,952.73
407i PILE LOAD TEST UP TO 240 TON EACH 59,806.83 45,769.30 218,316.91 80,973.26 404,866.30
407j PILE LOAD TEST UP TO 360 TON EACH 87,379.23 50,188.38 327,475.37 116,260.74 581,303.72
407k CONFIRMATORY BORING (NX SIZE) M 266.18 1,582.02 6.36 463.64 2,318.21
411a STONE MASONRY RANDOM DRY CM 370.27 107.96 430.86 227.27 1,136.37
411b STONE MASONRY RANDOM WITH MORTAR CM 394.21 166.68 1,537.61 524.63 2,623.13
411c STONE MASONRY DRESSED UNCOURSED DRY CM 479.42 107.96 482.46 267.46 1,337.30
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 557.93 166.68 1,580.14 576.19 2,880.95
Page 160
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Quetta
Quetta District Code: 54
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 752.28 264.08 1,485.34 625.43 3,127.13
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 316.56 437.48 645.91 349.99 1,749.94
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 306.93 577.19 837.19 430.33 2,151.63
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 300.12 935.96 1,073.37 577.36 2,886.81
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 314.61 1,146.39 1,602.34 765.84 3,829.18
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 357.72 1,078.41 2,301.98 934.53 4,672.64
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 436.72 1,331.30 3,620.48 1,347.13 6,735.63
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 565.17 1,481.41 4,686.41 1,683.25 8,416.24
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 669.18 1,798.85 5,971.86 2,109.97 10,549.87
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 787.90 2,098.66 9,222.33 3,027.22 15,136.11
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 316.56 507.33 727.12 387.75 1,938.77
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 306.93 577.19 856.01 435.03 2,175.16
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 292.46 935.96 1,047.95 569.09 2,845.46
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 314.61 1,146.39 1,746.88 801.97 4,009.86
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 357.72 1,078.41 3,320.60 1,189.18 5,945.92
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 436.72 1,331.30 4,877.79 1,661.45 8,307.27
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 565.17 1,481.41 6,814.84 2,215.35 11,076.77
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 669.18 1,798.85 9,242.13 2,927.54 14,637.71
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 787.90 2,098.66 13,001.19 3,971.94 19,859.69
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 130.01 118.93 545.55 198.62 993.11
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 1,002.16 612.95 3,520.12 1,283.81 6,419.04
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 7.00 - 112.05 29.76 148.81
508a BRICK PAVING (SINGLE COURSE) SM 141.41 32.70 220.78 98.72 493.61
508b BRICK PAVING (DOUBLE COURSE) SM 250.56 32.70 436.80 180.01 900.07
Page 161
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Quetta
Quetta District Code: 54
509d GROUTED RIP RAP CLASS "A" CM 740.20 102.14 1,779.24 655.39 3,276.97
509e GROUTED RIP RAP CLASS "B" CM 710.88 81.72 1,626.64 604.81 3,024.04
509f GROUTED RIP RAP CLASS "C" CM 701.55 68.10 1,672.78 610.61 3,053.03
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 1,029.92 353.02 4,086.23 1,367.29 6,836.47
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 66.26 191.97 450.42 177.16 885.81
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 198.05 67.48 54.61 80.03 400.17
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 253.51 86.37 69.90 102.44 512.22
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 316.31 180.32 386.45 220.77 1,103.86
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 395.39 225.40 483.06 275.96 1,379.82
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 351.22 572.25 2,218.58 785.51 3,927.56
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,239.87 670.54 4,077.78 1,497.05 7,485.23
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 180.76 90.27 429.76 175.20 875.98
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 34.24 - 1,197.61 307.96 1,539.82
604d STEEL POST OF METAL GUARD RAIL EACH 122.25 976.73 3,776.44 1,218.85 6,094.27
605a CONCRETE BEAM GUARD RAIL M 99.63 30.82 593.64 181.02 905.12
605c CONCRETE POST FOR GUARD RAIL M 122.33 27.36 594.07 185.94 929.71
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 311.96 255.15 6,854.20 1,855.33 9,276.64
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 91.69 382.72 9,261.52 2,433.98 12,169.92
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 311.96 541.89 11,892.33 3,186.54 15,932.72
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 1,036.63 598.64 20,981.47 5,654.19 28,270.93
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 207.33 119.73 9,233.40 2,390.11 11,950.56
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.97 5.86 16.20 6.51 32.53
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.32 4.03 40.00 11.34 56.69
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.97 5.86 21.61 7.86 39.30
LINES OF 20 cm WIDTH
Page 162
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Quetta
Quetta District Code: 54
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.32 4.03 53.35 14.68 73.38
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 92.79 5.22 156.50 63.63 318.13
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 92.79 9.98 504.05 151.71 758.54
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.96 8.59 22.51 9.01 45.07
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.96 9.63 67.51 20.52 102.62
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.96 6.95 30.02 10.48 52.41
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.96 9.63 90.01 26.15 130.75
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 92.79 3.73 217.36 78.47 392.34
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 92.79 7.90 851.21 237.98 1,189.88
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 78.43 3.73 104.33 46.62 233.11
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 78.43 7.90 336.54 105.72 528.59
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 78.43 3.73 144.90 56.77 283.83
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 78.43 7.90 568.33 163.67 818.33
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 12.27 81.62 193.90 71.95 359.74
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 12.27 81.62 233.90 81.95 409.73
DOUBLE)
610b RIGHT OF WAY MARKER EACH 142.30 121.33 301.10 141.18 705.91
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 829.30 976.31 2,027.13 958.18 4,790.91
610d TEN KILOMETRE POST EACH 1,610.72 1,952.61 4,448.30 2,002.91 10,014.55
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 177.59 91.00 951.16 304.94 1,524.69
PRECAST PRESTRESSED R.C.C. POST
Page 163
.
Page 164
NATIONAL HIGHWAY AUTHORITY
QILA SAIFULLAH
(54-A)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 165
.
Page 166
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Qila
Qila Saifullah
Saifullah District Code: 54-A
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.51 173.32 1.17 45.75 228.75
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.13 456.54 2.63 120.57 602.87
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 92.52 1,826.16 10.51 482.30 2,411.49
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 169.07 316.30 50.82 134.05 670.24
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 21.61 337.99 - 89.90 449.51
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 14.51 262.40 - 69.23 346.13
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 169.07 316.30 50.82 134.05 670.24
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 26.98 316.03 - 85.75 428.76
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 11.05 263.92 - 68.74 343.72
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 10.81 137.60 0.38 37.20 185.99
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 76.90 287.11 70.80 108.71 543.53
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 149.89 427.01 33.88 152.69 763.47
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 124.94 292.53 - 104.37 521.84
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 77.08 238.86 - 78.99 394.94
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 9.22 174.71 5.09 47.25 236.27
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 25.60 482.48 54.04 140.53 702.65
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 19.20 416.71 2.42 109.58 547.91
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 10.10 177.46 7.94 48.88 244.38
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 8.22 76.32 5.09 22.41 112.04
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 18.00 110.29 3.03 32.83 164.14
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.84 27.34 1.46 7.66 38.30
Page 167
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Qila
Qila Saifullah
Saifullah District Code: 54-A
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.38 18.21 0.77 5.09 25.45
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.09 15.26 0.79 4.29 21.43
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.63 15.57 0.90 4.52 22.62
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 78.86 1,510.17 6,764.93 2,088.49 10,442.44
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 82.43 1,510.17 7,273.82 2,216.60 11,083.02
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 89.08 1,577.28 6,753.12 2,104.87 10,524.35
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 89.08 1,571.31 7,435.66 2,274.01 11,370.06
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 327.46 915.38 61,888.59 15,782.86 78,914.29
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 327.46 915.38 60,310.46 15,388.32 76,941.62
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 94.07 112.80 897.87 276.19 1,380.93
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 173.19 2,437.94 6,284.63 2,223.94 11,119.71
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 101.60 126.27 762.28 247.54 1,237.70
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.30 45.04 1.26 12.15 60.74
207b DEEP PATCHING (16-30 cm) SM 2.30 39.67 1.26 10.81 54.04
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.23 110.61 0.68 28.63 143.15
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.65 22.12 0.14 5.73 28.63
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.40 1.57 43.92 11.47 57.37
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.39 1.57 49.03 12.75 63.74
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 18.38 4.78 23.90
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 21.45 5.55 27.73
Page 168
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Qila
Qila Saifullah
Saifullah District Code: 54-A
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 77.22 1,489.33 8,025.53 2,398.02 11,990.10
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 77.22 1,438.23 8,695.80 2,552.81 12,764.06
"B")
307a DENSE GRADED HOT BIT-MAC CM 181.84 379.77 6,791.56 1,838.29 9,191.46
307b OPEN GRADED HOT BIT-MAC CM 181.84 379.77 6,574.52 1,784.03 8,920.16
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 32.36 590.65 2,278.99 725.50 3,627.50
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 33.19 650.70 54,230.80 13,728.67 68,643.36
401a1i CONCRETE CLASS "A1" (Underground) CM 594.40 1,059.94 4,098.14 1,438.12 7,190.59
401a1ii CONCRETE CLASS "A1" (On ground) CM 594.40 1,059.94 4,375.62 1,507.49 7,537.43
401a1iii CONCRETE CLASS "A1" (Elevated) CM 594.40 1,059.94 4,930.56 1,646.22 8,231.12
401a2i CONCRETE CLASS "A2" (Underground) CM 594.40 1,059.94 4,476.14 1,532.62 7,663.09
401a2ii CONCRETE CLASS "A2" (On ground) CM 594.40 1,059.94 4,753.62 1,601.99 8,009.93
401a2iii CONCRETE CLASS "A2" (Elevated) CM 594.40 1,059.94 5,308.56 1,740.72 8,703.62
401a3i CONCRETE CLASS "A3" (Underground) CM 594.40 1,059.94 4,854.14 1,627.12 8,135.59
401a3ii CONCRETE CLASS "A3" (On ground) CM 594.40 1,059.94 5,131.62 1,696.49 8,482.43
401a3iii CONCRETE CLASS "A3" (Elevated) CM 594.40 1,059.94 5,686.56 1,835.22 9,176.12
401ci CONCRETE CLASS "C" (Underground) CM 561.79 500.55 3,645.78 1,177.03 5,885.14
401cii CONCRETE CLASS "C" (On ground) CM 561.79 500.55 3,764.12 1,206.61 6,033.07
401ciii CONCRETE CLASS "C" (Elevated) CM 561.79 500.55 4,000.80 1,265.79 6,328.93
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,823.42 947.15 5,112.46 1,970.76 9,853.79
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,823.42 947.15 5,868.46 2,159.76 10,798.79
401gii PRECAST CONCRETE CLASS "B" CM 1,823.42 947.15 4,848.67 1,904.81 9,524.05
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,823.42 947.15 6,246.46 2,254.26 11,271.29
Page 169
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Qila
Qila Saifullah
Saifullah District Code: 54-A
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,823.42 947.15 6,624.46 2,348.76 11,743.79
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,823.42 947.15 7,002.46 2,443.26 12,216.29
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,810.03 781.47 62,538.00 16,282.38 81,411.88
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,810.03 781.47 69,888.00 18,119.88 90,599.38
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,426.80 5,393.81 56,343.71 15,791.08 78,955.41
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,386.05 15,659.05 133,844.81 38,222.48 191,112.39
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 123.36 - 328.83 113.05 565.24
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 123.36 - 326.75 112.53 562.64
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.53 2.67
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 22.45 69.68 116.35 52.12 260.60
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 423.82 1,654.04 1,094.67 793.13 3,965.66
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 635.72 2,481.06 1,642.01 1,189.70 5,948.50
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 635.72 2,481.06 1,198.99 1,078.94 5,394.72
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 1,059.54 4,135.11 1,388.27 1,645.73 8,228.65
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 908.18 4,884.94 1,586.22 1,844.83 9,224.17
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,589.31 6,909.78 1,739.25 2,559.59 12,797.93
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 22,772.99 45,769.30 95,947.02 41,122.33 205,611.64
407i PILE LOAD TEST UP TO 240 TON EACH 40,695.05 45,769.30 191,894.04 69,589.60 347,947.99
407j PILE LOAD TEST UP TO 360 TON EACH 58,617.11 50,188.38 287,841.06 99,161.64 495,808.20
407k CONFIRMATORY BORING (NX SIZE) M 213.07 1,582.02 6.37 450.37 2,251.83
411a STONE MASONRY RANDOM DRY CM 302.32 107.96 456.54 216.71 1,083.53
411b STONE MASONRY RANDOM WITH MORTAR CM 324.51 166.68 1,633.35 531.13 2,655.67
411c STONE MASONRY DRESSED UNCOURSED DRY CM 386.52 107.96 510.16 251.16 1,255.81
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 450.82 166.68 1,660.39 569.47 2,847.36
Page 170
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Qila
Qila Saifullah
Saifullah District Code: 54-A
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 597.04 264.08 1,565.58 606.68 3,033.39
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 234.32 437.48 648.10 329.97 1,649.87
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 224.36 577.19 839.81 410.34 2,051.70
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 232.97 935.96 1,076.43 561.34 2,806.71
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 238.95 1,146.39 1,605.92 747.81 3,739.07
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 277.39 1,078.41 2,305.56 915.34 4,576.71
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 346.55 1,331.30 3,625.66 1,325.88 6,629.39
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 448.48 1,481.41 4,691.56 1,655.36 8,276.81
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 528.73 1,798.85 5,978.11 2,076.43 10,382.13
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 626.50 2,098.66 9,229.63 2,988.70 14,943.48
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 234.32 507.33 731.50 368.29 1,841.44
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 224.36 577.19 858.63 415.04 2,075.22
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 227.66 935.96 1,051.01 553.66 2,768.29
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 238.95 1,146.39 1,749.67 783.75 3,918.76
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 277.39 1,078.41 3,324.58 1,170.10 5,850.48
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 346.55 1,331.30 4,882.97 1,640.21 8,201.03
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 448.48 1,481.41 6,819.99 2,187.47 10,937.35
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 528.73 1,798.85 9,248.39 2,893.99 14,469.97
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 626.50 2,098.66 13,008.49 3,933.41 19,667.06
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 101.59 118.93 446.47 166.75 833.73
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 881.86 612.95 3,674.72 1,292.38 6,461.91
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.23 - 111.81 29.51 147.55
508a BRICK PAVING (SINGLE COURSE) SM 111.80 32.70 213.27 89.44 447.22
508b BRICK PAVING (DOUBLE COURSE) SM 196.01 32.70 423.29 163.00 814.99
Page 171
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Qila
Qila Saifullah
Saifullah District Code: 54-A
509d GROUTED RIP RAP CLASS "A" CM 590.40 102.14 1,848.76 635.32 3,176.62
509e GROUTED RIP RAP CLASS "B" CM 565.40 81.72 1,691.39 584.63 2,923.14
509f GROUTED RIP RAP CLASS "C" CM 555.38 68.10 1,739.36 590.71 2,953.55
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 816.51 353.02 4,232.38 1,350.48 6,752.39
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 50.86 191.97 373.88 154.18 770.89
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 158.84 67.48 58.78 71.27 356.37
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 203.31 86.37 75.24 91.23 456.15
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 254.75 180.32 399.64 208.68 1,043.39
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 318.44 225.40 499.55 260.85 1,304.24
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 315.13 572.25 2,290.72 794.53 3,972.63
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,003.27 670.54 4,198.83 1,468.16 7,340.80
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 146.28 90.27 443.81 170.09 850.45
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 28.63 - 1,197.58 306.55 1,532.75
604d STEEL POST OF METAL GUARD RAIL EACH 114.07 976.73 3,776.31 1,216.78 6,083.88
605a CONCRETE BEAM GUARD RAIL M 74.24 30.82 608.27 178.33 891.66
605c CONCRETE POST FOR GUARD RAIL M 91.15 27.36 610.73 182.31 911.56
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 250.68 255.15 6,876.33 1,845.54 9,227.69
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 73.73 382.72 9,307.13 2,440.90 12,204.48
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 250.68 541.89 11,969.40 3,190.49 15,952.45
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 758.92 598.64 21,107.66 5,616.31 28,081.53
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 151.78 119.73 9,274.03 2,386.39 11,931.93
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.29 5.86 16.22 6.34 31.71
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.10 4.03 40.25 11.34 56.72
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.29 5.86 21.65 7.70 38.49
LINES OF 20 cm WIDTH
Page 172
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Qila
Qila Saifullah
Saifullah District Code: 54-A
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.10 4.03 53.69 14.70 73.51
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 81.54 5.22 156.74 60.87 304.37
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 81.54 9.98 507.22 149.69 748.43
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.11 8.59 22.54 8.81 44.05
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.11 9.63 67.50 20.31 101.56
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.11 6.95 30.05 10.28 51.39
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.11 9.63 90.01 25.94 129.69
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 81.54 3.73 217.60 75.72 378.58
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 81.54 7.90 851.20 235.16 1,175.79
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 68.22 3.73 104.50 44.11 220.55
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 68.22 7.90 338.66 103.69 518.47
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 68.22 3.73 145.07 54.25 271.27
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 68.22 7.90 568.32 161.11 805.55
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.60 81.62 193.99 71.55 357.76
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.60 81.62 233.99 81.55 407.75
DOUBLE)
610b RIGHT OF WAY MARKER EACH 102.81 121.33 308.94 133.27 666.34
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 648.44 976.31 2,101.75 931.62 4,658.12
610d TEN KILOMETRE POST EACH 1,252.49 1,952.61 4,594.63 1,949.93 9,749.66
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 146.73 91.00 959.73 299.37 1,496.83
PRECAST PRESTRESSED R.C.C. POST
Page 173
.
Page 174
NATIONAL HIGHWAY AUTHORITY
SIBI
(64)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 175
.
Page 176
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Sibi
Sibi District Code: 64
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.47 173.32 1.17 45.74 228.69
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.03 456.54 2.63 120.55 602.75
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 92.14 1,826.16 10.51 482.20 2,411.01
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 168.33 316.30 50.82 133.86 669.31
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 21.50 337.99 - 89.87 449.36
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 14.46 262.40 - 69.21 346.06
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 168.33 316.30 50.82 133.86 669.31
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 26.76 316.03 - 85.70 428.48
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 11.01 263.92 - 68.73 343.67
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 10.87 137.60 0.38 37.21 186.07
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 80.51 287.11 70.80 109.61 548.04
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 148.64 427.01 33.88 152.38 761.92
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 123.66 292.53 - 104.05 520.24
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 76.45 238.86 - 78.83 394.14
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 9.14 174.71 5.09 47.24 236.18
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 25.58 482.48 54.04 140.53 702.63
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 19.19 416.71 2.42 109.58 547.90
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 10.03 177.46 7.94 48.86 244.28
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 8.27 76.32 5.09 22.42 112.10
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 18.07 110.29 3.03 32.85 164.24
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.84 27.34 1.46 7.66 38.29
Page 177
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Sibi
Sibi District Code: 64
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.39 18.21 0.77 5.09 25.47
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.12 15.26 0.79 4.29 21.47
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.66 15.57 0.90 4.53 22.65
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 76.71 1,510.17 6,513.06 2,024.99 10,124.93
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 79.84 1,510.17 6,996.49 2,146.62 10,733.12
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 86.97 1,577.28 6,501.69 2,041.49 10,207.43
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 86.97 1,571.31 7,154.10 2,203.10 11,015.48
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 334.20 915.38 59,319.15 15,142.18 75,710.90
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 334.20 915.38 57,741.02 14,747.65 73,738.24
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 94.43 112.80 864.67 267.97 1,339.87
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 168.36 2,437.94 6,072.18 2,169.62 10,848.09
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 101.33 126.27 781.78 252.35 1,261.73
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.36 45.04 1.26 12.16 60.81
207b DEEP PATCHING (16-30 cm) SM 2.36 39.67 1.26 10.82 54.11
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.41 110.61 0.68 28.67 143.37
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.68 22.12 0.14 5.73 28.67
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.39 1.57 42.10 11.02 55.08
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.38 1.57 46.99 12.24 61.19
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 17.62 4.59 22.95
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 20.56 5.32 26.62
Page 178
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Sibi
Sibi District Code: 64
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 74.49 1,489.33 7,711.31 2,318.78 11,593.91
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 74.49 1,438.23 8,349.28 2,465.50 12,327.50
"B")
307a DENSE GRADED HOT BIT-MAC CM 175.60 379.77 6,491.48 1,761.72 8,808.58
307b OPEN GRADED HOT BIT-MAC CM 175.60 379.77 6,285.38 1,710.19 8,550.94
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 30.56 590.65 2,211.60 708.20 3,541.02
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 33.56 650.70 51,585.04 13,067.32 65,336.62
401a1i CONCRETE CLASS "A1" (Underground) CM 635.02 1,059.94 4,065.27 1,440.06 7,200.29
401a1ii CONCRETE CLASS "A1" (On ground) CM 635.02 1,059.94 4,342.75 1,509.43 7,547.13
401a1iii CONCRETE CLASS "A1" (Elevated) CM 635.02 1,059.94 4,897.69 1,648.16 8,240.82
401a2i CONCRETE CLASS "A2" (Underground) CM 635.02 1,059.94 4,443.27 1,534.56 7,672.79
401a2ii CONCRETE CLASS "A2" (On ground) CM 635.02 1,059.94 4,720.75 1,603.93 8,019.63
401a2iii CONCRETE CLASS "A2" (Elevated) CM 635.02 1,059.94 5,275.69 1,742.66 8,713.32
401a3i CONCRETE CLASS "A3" (Underground) CM 635.02 1,059.94 4,821.27 1,629.06 8,145.29
401a3ii CONCRETE CLASS "A3" (On ground) CM 635.02 1,059.94 5,098.75 1,698.43 8,492.13
401a3iii CONCRETE CLASS "A3" (Elevated) CM 635.02 1,059.94 5,653.69 1,837.16 9,185.82
401ci CONCRETE CLASS "C" (Underground) CM 605.93 500.55 3,604.59 1,177.77 5,888.83
401cii CONCRETE CLASS "C" (On ground) CM 605.93 500.55 3,722.93 1,207.35 6,036.76
401ciii CONCRETE CLASS "C" (Elevated) CM 605.93 500.55 3,959.61 1,266.52 6,332.62
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,982.03 947.15 5,077.52 2,001.68 10,008.38
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,982.03 947.15 5,833.52 2,190.68 10,953.38
401gii PRECAST CONCRETE CLASS "B" CM 1,982.03 947.15 4,808.42 1,934.40 9,672.00
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,982.03 947.15 6,211.52 2,285.18 11,425.88
Page 179
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Sibi
Sibi District Code: 64
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,982.03 947.15 6,589.52 2,379.68 11,898.38
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,982.03 947.15 6,967.52 2,474.18 12,370.88
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,981.72 781.47 60,418.00 15,795.30 78,976.49
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,981.72 781.47 67,768.00 17,632.80 88,163.99
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,555.09 5,393.81 55,323.32 15,568.06 77,840.28
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,238.40 15,659.05 133,786.12 38,170.89 190,854.46
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 132.96 - 316.13 112.27 561.37
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 132.96 - 314.89 111.96 559.81
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 23.36 69.68 115.34 52.10 260.48
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 417.19 1,654.04 1,051.41 780.66 3,903.30
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 625.79 2,481.06 1,577.12 1,170.99 5,854.96
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 625.79 2,481.06 1,179.61 1,071.61 5,358.07
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 1,042.98 4,135.11 1,416.97 1,648.76 8,243.81
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 893.98 4,884.94 1,702.53 1,870.36 9,351.82
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,564.47 6,909.78 1,816.62 2,572.72 12,863.58
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 22,707.47 45,769.30 122,369.02 47,711.45 238,557.25
407i PILE LOAD TEST UP TO 240 TON EACH 40,629.53 45,769.30 244,738.04 82,784.22 413,921.10
407j PILE LOAD TEST UP TO 360 TON EACH 58,551.59 50,188.38 367,107.06 118,961.76 594,808.80
407k CONFIRMATORY BORING (NX SIZE) M 211.08 1,582.02 6.37 449.87 2,249.34
411a STONE MASONRY RANDOM DRY CM 334.71 107.96 679.02 280.42 1,402.11
411b STONE MASONRY RANDOM WITH MORTAR CM 362.28 166.68 1,845.81 593.69 2,968.47
411c STONE MASONRY DRESSED UNCOURSED DRY CM 429.68 107.96 749.26 321.73 1,608.63
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 504.74 166.68 1,891.98 640.85 3,204.26
Page 180
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Sibi
Sibi District Code: 64
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 667.11 264.08 1,797.18 682.09 3,410.47
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 241.74 437.48 647.78 331.75 1,658.76
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 231.61 577.19 839.44 412.06 2,060.30
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 240.63 935.96 1,076.00 563.15 2,815.74
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 245.91 1,146.39 1,605.41 749.43 3,747.14
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 281.81 1,078.41 2,305.05 916.32 4,581.60
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 350.52 1,331.30 3,624.92 1,326.68 6,633.42
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 453.62 1,481.41 4,690.82 1,656.46 8,282.31
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 531.12 1,798.85 5,977.22 2,076.80 10,384.00
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 634.32 2,098.66 9,228.59 2,990.39 14,951.96
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 241.74 507.33 730.88 369.99 1,849.94
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 231.61 577.19 858.26 416.76 2,083.82
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 235.66 935.96 1,050.58 555.55 2,777.74
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 245.91 1,146.39 1,749.27 785.39 3,926.97
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 281.81 1,078.41 3,324.01 1,171.06 5,855.30
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 350.52 1,331.30 4,882.23 1,641.01 8,205.06
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 453.62 1,481.41 6,819.25 2,188.57 10,942.85
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 531.12 1,798.85 9,247.50 2,894.37 14,471.84
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 634.32 2,098.66 13,007.45 3,935.11 19,675.54
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 103.06 118.93 725.69 236.92 1,184.60
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 922.89 612.95 3,636.03 1,292.97 6,464.83
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.60 - 102.29 27.22 136.11
508a BRICK PAVING (SINGLE COURSE) SM 122.62 32.70 228.28 95.90 479.51
508b BRICK PAVING (DOUBLE COURSE) SM 217.59 32.70 450.31 175.15 875.75
Page 181
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Sibi
Sibi District Code: 64
509d GROUTED RIP RAP CLASS "A" CM 654.05 102.14 2,064.98 705.29 3,526.47
509e GROUTED RIP RAP CLASS "B" CM 629.24 81.72 1,906.48 654.36 3,271.80
509f GROUTED RIP RAP CLASS "C" CM 619.34 68.10 1,956.00 660.86 3,304.30
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 871.87 353.02 4,195.72 1,355.15 6,775.76
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 50.84 191.97 566.14 202.24 1,011.20
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 174.22 67.48 94.93 84.16 420.78
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 223.00 86.37 121.52 107.72 538.60
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 283.04 180.32 438.49 225.46 1,127.31
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 353.80 225.40 548.11 281.83 1,409.14
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 336.61 572.25 2,273.17 795.51 3,977.54
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,092.00 670.54 4,136.57 1,474.78 7,373.89
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 158.55 90.27 441.39 172.55 862.75
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 28.79 - 1,197.58 306.59 1,532.96
604d STEEL POST OF METAL GUARD RAIL EACH 112.85 976.73 3,776.31 1,216.47 6,082.35
605a CONCRETE BEAM GUARD RAIL M 79.10 30.82 597.55 176.87 884.34
605c CONCRETE POST FOR GUARD RAIL M 97.12 27.36 598.85 180.83 904.16
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 264.51 255.15 6,859.52 1,844.79 9,223.97
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 80.86 382.72 9,282.23 2,436.45 12,182.27
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 264.51 541.89 11,927.80 3,183.55 15,917.74
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 790.44 598.64 21,034.95 5,606.01 28,030.03
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 158.09 119.73 9,244.42 2,380.56 11,902.80
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.43 5.86 16.20 6.37 31.85
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.14 4.03 40.00 11.29 56.47
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.43 5.86 21.61 7.72 38.62
LINES OF 20 cm WIDTH
Page 182
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Sibi
Sibi District Code: 64
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.14 4.03 53.36 14.63 73.16
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 95.57 5.22 156.50 64.32 321.61
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 95.57 9.98 504.11 152.42 762.08
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.28 8.59 22.51 8.85 44.23
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.28 9.63 67.50 20.36 101.78
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.28 6.95 30.02 10.31 51.57
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.28 9.63 90.01 25.98 129.90
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 95.57 3.73 217.36 79.16 395.82
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 95.57 7.90 851.20 238.67 1,193.33
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 79.03 3.73 104.34 46.77 233.86
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 79.03 7.90 336.58 105.88 529.38
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 79.03 3.73 144.91 56.92 284.58
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 79.03 7.90 568.32 163.81 819.06
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.79 81.62 193.98 71.85 359.24
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 11.79 81.62 233.98 81.85 409.23
DOUBLE)
610b RIGHT OF WAY MARKER EACH 106.43 121.33 305.28 133.26 666.30
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 711.38 976.31 2,062.53 937.55 4,687.77
610d TEN KILOMETRE POST EACH 1,367.61 1,952.61 4,516.26 1,959.12 9,795.60
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 155.04 91.00 956.72 300.69 1,503.46
PRECAST PRESTRESSED R.C.C. POST
Page 183
.
Page 184
NATIONAL HIGHWAY AUTHORITY
TURBAT
(70)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 185
.
Page 186
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Turbat
Turbat District Code: 70
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 10.40 173.32 1.17 46.22 231.11
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 29.23 456.54 2.63 122.10 610.50
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 116.91 1,826.16 10.51 488.40 2,441.98
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 187.44 316.30 50.82 138.64 693.20
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 24.62 337.99 - 90.65 453.27
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 16.44 262.40 - 69.71 348.54
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 187.44 316.30 50.82 138.64 693.20
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 29.80 316.03 - 86.46 432.29
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 12.51 263.92 - 69.11 345.54
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 11.69 137.60 0.38 37.42 187.09
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 93.39 287.11 70.80 112.83 564.13
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 165.56 427.01 33.88 156.61 783.07
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 138.55 292.53 - 107.77 538.85
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 85.15 238.86 - 81.00 405.01
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 10.24 174.71 5.09 47.51 237.54
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 29.48 482.48 54.04 141.50 707.51
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 22.11 416.71 2.42 110.31 551.55
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 11.53 177.46 7.94 49.23 246.16
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 9.24 76.32 5.09 22.66 113.31
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 21.15 110.29 3.03 33.62 168.08
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 2.08 27.34 1.46 7.72 38.59
Page 187
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Turbat
Turbat District Code: 70
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.55 18.21 0.77 5.13 25.66
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.28 15.26 0.79 4.33 21.67
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.89 15.57 0.90 4.59 22.94
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 98.89 1,510.17 6,570.64 2,044.92 10,224.62
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 102.46 1,510.17 7,052.86 2,166.37 10,831.86
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 110.72 1,577.28 6,559.30 2,061.83 10,309.13
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 110.72 1,571.31 7,210.66 2,223.17 11,115.85
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 377.04 915.38 59,500.95 15,198.34 75,991.71
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 377.04 915.38 57,922.82 14,803.81 74,019.05
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 128.16 112.80 897.89 284.71 1,423.57
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 206.97 2,437.94 6,125.42 2,192.58 10,962.92
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 139.60 126.27 656.55 230.61 1,153.03
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.61 45.04 1.26 12.23 61.13
207b DEEP PATCHING (16-30 cm) SM 2.61 39.67 1.26 10.89 54.43
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.59 110.61 0.68 28.72 143.60
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.72 22.12 0.14 5.74 28.72
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.44 1.57 42.23 11.06 55.31
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.43 1.57 47.14 12.29 61.43
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.18 0.58 17.67 4.61 23.04
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.18 0.58 20.62 5.34 26.72
Page 188
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Turbat
Turbat District Code: 70
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 93.79 1,489.33 7,772.70 2,338.95 11,694.77
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 93.79 1,438.23 8,415.17 2,486.80 12,433.99
"B")
307a DENSE GRADED HOT BIT-MAC CM 222.75 379.77 6,549.39 1,787.98 8,939.89
307b OPEN GRADED HOT BIT-MAC CM 222.75 379.77 6,340.61 1,735.79 8,678.93
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 38.07 590.65 2,222.25 712.74 3,563.71
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 39.40 650.70 51,772.24 13,115.59 65,577.93
401a1i CONCRETE CLASS "A1" (Underground) CM 725.33 1,059.94 4,048.08 1,458.34 7,291.69
401a1ii CONCRETE CLASS "A1" (On ground) CM 725.33 1,059.94 4,325.56 1,527.71 7,638.53
401a1iii CONCRETE CLASS "A1" (Elevated) CM 725.33 1,059.94 4,880.50 1,666.44 8,332.21
401a2i CONCRETE CLASS "A2" (Underground) CM 725.33 1,059.94 4,426.08 1,552.84 7,764.19
401a2ii CONCRETE CLASS "A2" (On ground) CM 725.33 1,059.94 4,703.56 1,622.21 8,111.03
401a2iii CONCRETE CLASS "A2" (Elevated) CM 725.33 1,059.94 5,258.50 1,760.94 8,804.71
401a3i CONCRETE CLASS "A3" (Underground) CM 725.33 1,059.94 4,804.08 1,647.34 8,236.69
401a3ii CONCRETE CLASS "A3" (On ground) CM 725.33 1,059.94 5,081.56 1,716.71 8,583.53
401a3iii CONCRETE CLASS "A3" (Elevated) CM 725.33 1,059.94 5,636.50 1,855.44 9,277.21
401ci CONCRETE CLASS "C" (Underground) CM 708.24 500.55 3,591.02 1,199.95 5,999.76
401cii CONCRETE CLASS "C" (On ground) CM 708.24 500.55 3,709.37 1,229.54 6,147.69
401ciii CONCRETE CLASS "C" (Elevated) CM 708.24 500.55 3,946.05 1,288.71 6,443.54
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 2,373.28 947.15 5,059.35 2,094.95 10,474.73
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 2,373.28 947.15 5,815.35 2,283.95 11,419.73
401gii PRECAST CONCRETE CLASS "B" CM 2,373.28 947.15 4,787.76 2,027.05 10,135.24
401giii(1) PRECAST CONCRETE CLASS "D1" CM 2,373.28 947.15 6,193.35 2,378.45 11,892.23
Page 189
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Turbat
Turbat District Code: 70
401giii(2) PRECAST CONCRETE CLASS "D2" CM 2,373.28 947.15 6,571.35 2,472.95 12,364.73
401giii(3) PRECAST CONCRETE CLASS "D3" CM 2,373.28 947.15 6,949.35 2,567.45 12,837.23
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 2,250.00 781.47 63,598.00 16,657.37 83,286.83
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 2,250.00 781.47 70,948.00 18,494.87 92,474.33
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,772.05 5,393.81 56,581.72 15,936.90 79,684.48
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,497.03 15,659.05 133,823.19 38,244.82 191,224.09
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 157.13 - 313.61 117.68 588.42
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 157.13 - 312.55 117.42 587.10
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 27.96 69.68 117.13 53.69 268.47
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 447.88 1,654.04 1,142.50 811.10 4,055.52
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 671.81 2,481.06 1,713.75 1,216.66 6,083.29
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 671.81 2,481.06 1,270.42 1,105.82 5,529.12
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 1,119.69 4,135.11 1,507.31 1,690.53 8,452.64
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 959.73 4,884.94 1,792.54 1,909.30 9,546.52
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,679.54 6,909.78 1,917.82 2,626.78 13,133.91
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 31,134.49 45,769.30 98,148.78 43,763.14 218,815.72
407i PILE LOAD TEST UP TO 240 TON EACH 57,328.27 45,769.30 196,297.56 74,848.78 374,243.92
407j PILE LOAD TEST UP TO 360 TON EACH 83,522.05 50,188.38 294,446.34 107,039.19 535,195.97
407k CONFIRMATORY BORING (NX SIZE) M 253.71 1,582.02 6.37 460.52 2,302.62
411a STONE MASONRY RANDOM DRY CM 394.61 107.96 658.41 290.24 1,451.22
411b STONE MASONRY RANDOM WITH MORTAR CM 423.33 166.68 1,785.16 593.79 2,968.97
411c STONE MASONRY DRESSED UNCOURSED DRY CM 510.26 107.96 917.78 384.00 1,920.00
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 596.80 166.68 2,030.48 698.49 3,492.45
Page 190
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Turbat
Turbat District Code: 70
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 799.38 264.08 1,935.67 749.78 3,748.92
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 315.19 437.48 646.53 349.80 1,749.01
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 304.74 577.19 837.94 429.97 2,149.83
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 302.49 935.96 1,074.25 578.17 2,890.86
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 314.67 1,146.39 1,603.36 766.11 3,830.53
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 361.47 1,078.41 2,303.00 935.72 4,678.61
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 446.14 1,331.30 3,621.96 1,349.85 6,749.25
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 577.35 1,481.41 4,687.88 1,686.66 8,433.30
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 680.56 1,798.85 5,973.65 2,113.26 10,566.32
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 807.27 2,098.66 9,224.42 3,032.59 15,162.94
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 315.19 507.33 728.37 387.73 1,938.63
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 304.74 577.19 856.76 434.67 2,173.35
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 296.10 935.96 1,048.83 570.22 2,851.10
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 314.67 1,146.39 1,747.68 802.19 4,010.93
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 361.47 1,078.41 3,321.74 1,190.41 5,952.03
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 446.14 1,331.30 4,879.27 1,664.18 8,320.88
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 577.35 1,481.41 6,816.31 2,218.77 11,093.84
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 680.56 1,798.85 9,243.92 2,930.83 14,654.16
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 807.27 2,098.66 13,003.28 3,977.30 19,886.51
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 130.04 118.93 395.42 161.10 805.48
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 1,070.20 612.95 3,612.85 1,324.00 6,619.99
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 7.82 - 104.12 27.98 139.92
508a BRICK PAVING (SINGLE COURSE) SM 149.41 32.70 215.65 99.44 497.20
508b BRICK PAVING (DOUBLE COURSE) SM 265.06 32.70 427.80 181.39 906.94
Page 191
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Turbat
Turbat District Code: 70
509d GROUTED RIP RAP CLASS "A" CM 788.57 102.14 2,019.34 727.51 3,637.56
509e GROUTED RIP RAP CLASS "B" CM 757.99 81.72 1,863.62 675.83 3,379.15
509f GROUTED RIP RAP CLASS "C" CM 747.31 68.10 1,912.04 681.86 3,409.30
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 1,060.71 353.02 4,173.91 1,396.91 6,984.55
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 66.86 191.97 390.99 162.46 812.28
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 208.78 67.48 91.59 91.96 459.81
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 267.24 86.37 117.23 117.71 588.55
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 336.48 180.32 416.73 233.38 1,166.92
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 420.60 225.40 520.92 291.73 1,458.65
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 384.65 572.25 2,264.13 805.26 4,026.29
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,304.09 670.54 4,193.26 1,541.97 7,709.86
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 189.64 90.27 438.46 179.59 897.96
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 33.02 - 1,197.58 307.65 1,538.25
604d STEEL POST OF METAL GUARD RAIL EACH 123.97 976.73 3,776.31 1,219.25 6,096.25
605a CONCRETE BEAM GUARD RAIL M 101.54 30.82 611.26 185.91 929.53
605c CONCRETE POST FOR GUARD RAIL M 124.67 27.36 613.77 191.45 957.26
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 323.56 255.15 6,865.18 1,860.97 9,304.86
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 95.15 382.72 9,279.84 2,439.43 12,197.15
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 323.56 541.89 11,924.88 3,197.58 15,987.90
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 1,041.38 598.64 21,025.82 5,666.46 28,332.30
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 208.28 119.73 9,240.92 2,392.23 11,961.16
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 4.09 5.86 16.19 6.54 32.68
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.36 4.03 39.94 11.33 56.66
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 4.09 5.86 21.60 7.89 39.44
LINES OF 20 cm WIDTH
Page 192
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Turbat
Turbat District Code: 70
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.36 4.03 53.26 14.66 73.32
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 109.23 5.22 156.44 67.72 338.60
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 109.23 9.98 503.25 155.62 778.08
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 5.12 8.59 22.51 9.05 45.26
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 5.12 9.63 67.50 20.56 102.81
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 5.12 6.95 30.01 10.52 52.59
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 5.12 9.63 90.01 26.19 130.94
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 109.23 3.73 217.29 82.56 412.81
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 109.23 7.90 851.20 242.08 1,210.41
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 90.85 3.73 104.29 49.72 248.58
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 90.85 7.90 336.01 108.69 543.44
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 90.85 3.73 144.86 59.86 299.30
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 90.85 7.90 568.32 166.77 833.84
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 13.14 81.62 193.93 72.17 360.86
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 13.14 81.62 233.93 82.17 410.86
DOUBLE)
610b RIGHT OF WAY MARKER EACH 140.84 121.33 308.19 142.59 712.95
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 881.37 976.31 2,098.66 989.08 4,945.42
610d TEN KILOMETRE POST EACH 1,709.13 1,952.61 4,590.57 2,063.08 10,315.38
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 182.97 91.00 957.49 307.87 1,539.34
PRECAST PRESTRESSED R.C.C. POST
Page 193
.
Page 194
NATIONAL HIGHWAY AUTHORITY
ZHOB
(72)
Shabir Associates
Quantity Surveying & Construction Cost Consultants
Page 195
.
Page 196
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Zhob
Zhob District Code: 72
102a REMOVAL OF TREES 150 - 300 mm GIRTH EACH 8.50 173.32 1.17 45.75 228.73
102b REMOVAL OF TREES 301 - 600 mm GIRTH EACH 23.10 456.54 2.63 120.57 602.83
102c REMOVAL OF TREES 601 mm OR OVER GIRTH EACH 92.40 1,826.16 10.51 482.27 2,411.34
106bi EXCAVATE UNSUITABLE HARD ROCK MATERIAL CM 169.53 316.30 50.82 134.16 670.82
106bii EXCAVATE UNSUITABLE MEDIUM ROCK MATERIAL CM 21.74 337.99 - 89.93 449.66
106biii EXCAVATE UNSUITABLE SOFT ROCK MATERIAL CM 14.61 262.40 - 69.25 346.26
106di EXCAVATE SURPLUS HARD ROCK MATERIAL CM 169.53 316.30 50.82 134.16 670.82
106dii EXCAVATE SURPLUS MEDIUM ROCK MATERIAL CM 27.04 316.03 - 85.77 428.84
106diii EXCAVATE SURPLUS SOFT ROCK MATERIAL CM 11.12 263.92 - 68.76 343.81
107a STRUCTURAL EXCAVATION IN COMMON MATERIAL CM 10.87 137.60 0.38 37.21 186.07
107b STRUCTURAL EXCAVATION IN COMMON MATERIAL BELOW CM 78.45 287.11 70.80 109.09 545.46
WATER LEVEL
107ci STRUCTURAL EXCAVATION IN HARD ROCK MATERIAL CM 150.23 427.01 33.88 152.78 763.90
107cii STRUCTURAL EXCAVATION IN MEDIUM ROCK MATERIAL CM 125.25 292.53 - 104.45 522.23
107ciii STRUCTURAL EXCAVATION IN SOFT ROCK MATERIAL CM 77.26 238.86 - 79.03 395.15
108a FORMATION OF EMBANKMENT FROM ROADWAY CM 9.27 174.71 5.09 47.27 236.34
EXCAVATION IN COMMON MATERIAL
108bi FORMATION OF EMBANKMENT FROM ROADWAY CM 25.72 482.48 54.04 140.56 702.80
EXCAVATION IN HARD ROCK MATERIAL
108bii FORMATION OF EMBANKMENT FROM ROADWAY CM 19.29 416.71 2.42 109.61 548.03
EXCAVATION IN MEDIUM ROCK MATERIAL
108c FORMATION OF EMBANKMENT FROM BORROW CM 10.16 177.46 7.94 48.89 244.44
EXCAVATION IN COMMON MATERIAL
108d FORMATION OF EMBANKMENT FROM STRUCTURAL CM 8.28 76.32 5.09 22.42 112.11
EXCAVATION IN COMMON MATERIAL
108e FORMATION OF EMBANKMENT FROM STRUCTURAL CM 18.10 110.29 3.03 32.85 164.27
EXCAVATION IN ANY TYPE OF ROCK MATERIAL
109a SUB GRADE PREPARATION IN EARTH CUT SM 1.85 27.34 1.46 7.66 38.31
Page 197
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Zhob
Zhob District Code: 72
109bi SUB GRADE PREPARATION IN EXISTING ROAD WITHOUT SM 1.38 18.21 0.77 5.09 25.46
ANY FILL
114a DRESSING OF BERM WITHOUT EXTRA MATERIAL SM 1.10 15.26 0.79 4.29 21.44
114b DRESSING OF BERM WITH EXTRA BORROW MATERIAL SM 1.65 15.57 0.90 4.53 22.64
203a ASPHALTIC BASE COURSE PLANT MIX (CLASS "A") CM 78.92 1,510.17 6,478.25 2,016.83 10,084.16
203b ASPHALTIC BASE COURSE PLANT MIX (CLASS "B") CM 82.49 1,510.17 6,958.13 2,137.70 10,688.48
203c ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "A") CM 89.26 1,577.28 6,467.08 2,033.41 10,167.03
203d ASPHALTIC LEVELLING COURSE PLANT MIX (CLASS "B") CM 89.26 1,571.31 7,114.53 2,193.77 10,968.87
204d LIQUID ASPHALT FOR CURING SEAL, TYPE MC-250 TON 329.51 915.38 58,640.43 14,971.33 74,856.65
204e EMULSIFIED ASPHALT FOR CURING SEAL, TYPE SS-1 TON 329.51 915.38 57,062.30 14,576.80 72,883.99
205a GRADED CRUSHED AGGREGATE CRACK-RELIEF LAYER CM 94.24 112.80 900.11 276.79 1,383.94
205b ASPHALTIC OPEN-GRADED PLANT MIX CRACK-RELIEF CM 173.56 2,437.94 6,060.88 2,168.10 10,840.48
LAYER
206b WATER BOUND MACADAM BASE WITH COARSE CM 101.68 126.27 749.83 244.45 1,222.23
AGGREGATE CLASS B
207a DEEP PATCHING (0-15 cm) SM 2.32 45.04 1.26 12.15 60.76
207b DEEP PATCHING (16-30 cm) SM 2.32 39.67 1.26 10.81 54.06
209a BREAKING OF EXISTING ROAD PAVEMENT STRUCTURE CM 3.26 110.61 0.68 28.64 143.19
209b SCARIFICATION OF EXISTING ROAD PAVEMENT SM 0.65 22.12 0.14 5.73 28.64
302a CUT-BACK ASPHALT FOR BITUMINOUS PRIME COAT SM 0.40 1.57 41.62 10.90 54.49
302b EMULSIFIED ASPHALT FOR BITUMINOUS PRIME COAT SM 0.39 1.57 46.46 12.10 60.52
303a CUT-BACK ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 17.42 4.54 22.70
303b EMULSIFIED ASPHALT FOR BITUMINOUS TACK COAT SM 0.16 0.58 20.32 5.27 26.33
Page 198
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Zhob
Zhob District Code: 72
305a ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 77.29 1,489.33 7,662.11 2,307.18 11,535.91
"A")
305b ASPHALTIC CONCRETE FOR WEARING COURSE (CLASS CM 77.29 1,438.23 8,292.10 2,451.90 12,259.52
"B")
307a DENSE GRADED HOT BIT-MAC CM 181.68 379.77 6,438.42 1,749.97 8,749.84
307b OPEN GRADED HOT BIT-MAC CM 181.68 379.77 6,242.78 1,701.06 8,505.29
308a RECYCLING OF ASPHALT CONCRETE (0 - 60 mm THICK) CM 32.36 590.65 2,201.80 706.20 3,531.02
308b BITUMEN BINDER GRADE (40 - 50, 60 - 70, 80 - 100) TON 33.19 650.70 50,886.16 12,892.51 64,462.56
401a1i CONCRETE CLASS "A1" (Underground) CM 612.81 1,059.94 4,091.25 1,441.00 7,205.01
401a1ii CONCRETE CLASS "A1" (On ground) CM 612.81 1,059.94 4,368.73 1,510.37 7,551.85
401a1iii CONCRETE CLASS "A1" (Elevated) CM 612.81 1,059.94 4,923.67 1,649.11 8,245.53
401a2i CONCRETE CLASS "A2" (Underground) CM 612.81 1,059.94 4,469.25 1,535.50 7,677.51
401a2ii CONCRETE CLASS "A2" (On ground) CM 612.81 1,059.94 4,746.73 1,604.87 8,024.35
401a2iii CONCRETE CLASS "A2" (Elevated) CM 612.81 1,059.94 5,301.67 1,743.61 8,718.03
401a3i CONCRETE CLASS "A3" (Underground) CM 612.81 1,059.94 4,847.25 1,630.00 8,150.01
401a3ii CONCRETE CLASS "A3" (On ground) CM 612.81 1,059.94 5,124.73 1,699.37 8,496.85
401a3iii CONCRETE CLASS "A3" (Elevated) CM 612.81 1,059.94 5,679.67 1,838.11 9,190.53
401ci CONCRETE CLASS "C" (Underground) CM 579.35 500.55 3,643.33 1,180.81 5,904.04
401cii CONCRETE CLASS "C" (On ground) CM 579.35 500.55 3,761.67 1,210.39 6,051.96
401ciii CONCRETE CLASS "C" (Elevated) CM 579.35 500.55 3,998.35 1,269.56 6,347.82
401gi(1) PRECAST CONCRETE CLASS "A-1" CM 1,880.27 947.15 5,105.21 1,983.16 9,915.79
401gi(3) PRECAST CONCRETE CLASS "A-3" CM 1,880.27 947.15 5,861.21 2,172.16 10,860.79
401gii PRECAST CONCRETE CLASS "B" CM 1,880.27 947.15 4,852.96 1,920.10 9,600.48
401giii(1) PRECAST CONCRETE CLASS "D1" CM 1,880.27 947.15 6,239.21 2,266.66 11,333.29
Page 199
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Zhob
Zhob District Code: 72
401giii(2) PRECAST CONCRETE CLASS "D2" CM 1,880.27 947.15 6,617.21 2,361.16 11,805.79
401giii(3) PRECAST CONCRETE CLASS "D3" CM 1,880.27 947.15 6,995.21 2,455.66 12,278.29
404a REINFORCEMENT AS PER AASHTO M. 31 GRADE 40 TON 1,878.25 781.47 62,538.00 16,299.43 81,497.15
404b REINFORCEMENT AS PER AASHTO M. 31 GRADE 60 TON 1,878.25 781.47 69,888.00 18,136.93 90,684.65
404h REINFORCEMENT (STRUCTURAL SHAPES) AS PER ASTM-A- TON 1,487.42 5,393.81 56,343.71 15,806.24 79,031.18
36
405a PRE-STRESSING WIRE STRAND 3/8" - 1/2" DIA COMPLETE IN TON 3,185.46 15,659.05 133,844.81 38,172.33 190,861.66
ALL RESPECT
406a PREMOULDED JOINT FILLER 12 mm THICK WITH SM 127.15 - 325.26 113.10 565.51
BITUMASTIC JOINT SEAL
406b NEOPRENE RUBBER JOINT FILLER 12 mm THICK WITH SM 127.15 - 323.18 112.58 562.91
BITUMASTIC JOINT SEAL
406e ELASTOMERIC BEARING PADS (ACCORDING TO SIZE AND ccm 0.02 - 2.12 0.54 2.68
THICKNESS)
406g STEEL OR METAL BEARING DEVICES KG 22.94 69.68 116.35 52.24 261.22
407d1 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 394.71 1,654.04 1,144.39 798.29 3,991.43
(BORING ONLY) IN NORMAL SOIL
407d2 CAST IN PLACE CONCRETE PILES UP TO 0.76 M DIA M 592.06 2,481.06 1,716.59 1,197.43 5,987.14
(BORING ONLY) IN GRAVEL STRATA
407d3 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 592.06 2,481.06 1,273.57 1,086.67 5,433.37
ONLY) IN NORMAL SOIL
407d4 CAST IN PLACE CONCRETE PILES 0.80 - 1.4 M DIA (BORING M 986.77 4,135.11 1,512.56 1,658.61 8,293.05
ONLY) IN GRAVEL STRATA
407d5 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 845.81 4,884.94 1,799.29 1,882.51 9,412.55
ONLY) IN NORMAL SOIL
407d6 CAST IN PLACE CONCRETE PILES 1.5 -2.0 M DIA (BORING M 1,480.16 6,909.78 1,925.69 2,578.91 12,894.54
ONLY) IN GRAVEL SOIL
407h PILE LOAD TEST UP TO 120 TON EACH 22,772.99 45,769.30 95,947.02 41,122.33 205,611.64
407i PILE LOAD TEST UP TO 240 TON EACH 40,695.05 45,769.30 191,894.04 69,589.60 347,947.99
407j PILE LOAD TEST UP TO 360 TON EACH 58,617.11 50,188.38 287,841.06 99,161.64 495,808.20
407k CONFIRMATORY BORING (NX SIZE) M 201.93 1,582.02 6.37 447.58 2,237.90
411a STONE MASONRY RANDOM DRY CM 312.07 107.96 456.54 219.14 1,095.72
411b STONE MASONRY RANDOM WITH MORTAR CM 335.97 166.68 1,633.35 534.00 2,670.00
411c STONE MASONRY DRESSED UNCOURSED DRY CM 399.69 107.96 514.66 255.58 1,277.89
411d STONE MASONRY DRESSED UNCOURSED WITH MORTAR CM 467.40 166.68 1,664.89 574.74 2,873.71
Page 200
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Zhob
Zhob District Code: 72
412a STONE MASONRY DRESSED COURSED WITH MORTAR CM 618.74 264.08 1,570.08 613.23 3,066.13
501a R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 310 mm M 236.33 437.48 648.10 330.48 1,652.39
501b R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 380 mm M 226.37 577.19 839.81 410.84 2,054.21
501c R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 460 mm M 235.29 935.96 1,076.43 561.92 2,809.61
501d R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 610 mm M 241.06 1,146.39 1,605.92 748.34 3,741.71
501e R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 760 mm M 279.50 1,078.41 2,305.56 915.87 4,579.34
501f R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 910 mm M 349.44 1,331.30 3,625.66 1,326.60 6,632.99
501g R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1070 mm M 452.21 1,481.41 4,691.56 1,656.30 8,281.48
501h R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1220 mm M 532.05 1,798.85 5,978.11 2,077.25 10,386.27
501i R.C.C PIPE CULVERT AASHTO M 170 CLASS II DIA 1520 mm M 631.79 2,098.66 9,229.63 2,990.02 14,950.09
501j R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 310 mm M 236.33 507.33 731.50 368.79 1,843.96
501k R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 380 mm M 226.37 577.19 858.63 415.55 2,077.74
501l R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 460 mm M 229.98 935.96 1,051.01 554.24 2,771.19
501m R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 610 mm M 241.06 1,146.39 1,749.67 784.28 3,921.40
501n R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 760 mm M 279.50 1,078.41 3,324.58 1,170.62 5,853.12
501o R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 910 mm M 349.44 1,331.30 4,882.97 1,640.93 8,204.63
501p R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1070 mm M 452.21 1,481.41 6,819.99 2,188.40 10,942.01
501q R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1220 mm M 532.05 1,798.85 9,248.39 2,894.82 14,474.11
501r R.C.C PIPE CULVERT AASHTO M 170 CLASS IV DIA 1520 mm M 631.79 2,098.66 13,008.49 3,934.73 19,673.67
502a GRANULAR MATERIAL IN BED TO CONCRETE PIPE CM 101.80 118.93 351.37 143.02 715.12
CULVERT
502b CONCRETE CLASS "B" IN BEDDING AND ENCASEMENT OF CM 901.83 612.95 3,676.63 1,297.85 6,489.26
CONCRETE PIPE CULVERT
507a STEEL WIRE MESH FOR GABIONS KG 6.38 - 105.76 28.03 140.17
508a BRICK PAVING (SINGLE COURSE) SM 115.34 32.70 213.27 90.33 451.63
508b BRICK PAVING (DOUBLE COURSE) SM 202.95 32.70 423.29 164.74 823.68
Page 201
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Zhob
Zhob District Code: 72
509d GROUTED RIP RAP CLASS "A" CM 611.17 102.14 1,848.76 640.52 3,202.59
509e GROUTED RIP RAP CLASS "B" CM 586.11 81.72 1,691.39 589.80 2,949.02
509f GROUTED RIP RAP CLASS "C" CM 576.05 68.10 1,739.36 595.88 2,979.38
509g REINFORCED CONCRETE SLOPE PROTECTION (WITHOUT CM 837.86 353.02 4,234.55 1,356.36 6,781.79
REINFORCEMENT)
509h FILTER LAYER OF GRANULAR MATERIAL CM 51.05 191.97 375.07 154.52 772.62
511a1 DRY STONE PITCHING (15-20 cm Thick) SM 163.49 67.48 58.78 72.44 362.18
511a2 DRY STONE PITCHING (21-25 cm Thick) SM 209.26 86.37 75.24 92.72 463.59
511b1 GROUTED STONE PITCHING (15-20 cm Thick) SM 263.43 180.32 391.93 208.92 1,044.59
511b2 GROUTED STONE PITCHING (21-25 cm Thick) SM 329.28 225.40 489.91 261.15 1,305.74
601ai CONCRETE KERB IN PLACE NEW JERSY BARRIER FOR M 324.86 572.25 2,287.01 796.03 3,980.15
MEDIAN (DOUBLE FACE)
601di PRECAST REINFORCED CONCRETE KERB NEW JERSY M 1,035.11 670.54 4,195.07 1,475.18 7,375.89
BARRIER FOR MEDIAN (DOUBLE FACE)
601dii PRECAST KERB IN CONCRETE CLASS A-1 OF SIZE 450 X 150 MM M 150.69 90.27 443.35 171.08 855.38
INCLUDING CONCRETE BEDDING & HAUNCHING
604b METAL GUARD RAIL END PIECES EACH 26.77 - 1,197.58 306.09 1,530.43
604d STEEL POST OF METAL GUARD RAIL EACH 109.96 976.73 3,776.31 1,215.75 6,078.74
605a CONCRETE BEAM GUARD RAIL M 75.82 30.82 607.97 178.65 893.27
605c CONCRETE POST FOR GUARD RAIL M 93.10 27.36 610.36 182.70 913.52
607a TRAFFIC ROAD SIGN CATEGORY 1 EACH 255.63 255.15 6,876.46 1,846.81 9,234.05
607b TRAFFIC ROAD SIGN CATEGORY 2 EACH 76.05 382.72 9,307.33 2,441.53 12,207.63
607c TRAFFIC ROAD SIGN CATEGORY 3 (a) EACH 255.63 541.89 11,969.76 3,191.82 15,959.10
607d TRAFFIC ROAD SIGN CATEGORY 3 (b) EACH 769.77 598.64 21,108.19 5,619.15 28,095.76
607e TRAFFIC ROAD SIGN CATEGORY 3 (c) SM 153.95 119.73 9,274.14 2,386.96 11,934.78
608b1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.32 5.86 16.22 6.35 31.75
LINES OF 15 cm WIDTH
608b2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.11 4.03 40.25 11.35 56.73
LINES OF 15 cm WIDTH
608c1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR M 3.32 5.86 21.65 7.71 38.53
LINES OF 20 cm WIDTH
Page 202
CSR - January 2009
National Highway Authority Construction Shabir Associates
Islamabad Quantity Survying & Construction Cost Consultants
District: Zhob
Zhob District Code: 72
608c2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR M 1.11 4.03 53.69 14.71 73.53
LINES OF 20 cm WIDTH
608d1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 86.03 5.22 156.74 62.00 309.99
4.0 M ARROWS
608d2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR 4.0 EACH 86.03 9.98 507.22 150.81 754.05
M ARROWS
608h1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.15 8.59 22.54 8.82 44.10
OF 15 cm WIDTH
608h2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.15 9.63 67.50 20.32 101.61
OF 15 cm WIDTH
608i1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR LINES M 4.15 6.95 30.05 10.29 51.44
OF 20 cm WIDTH
608i2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR LINES M 4.15 9.63 90.01 25.95 129.74
OF 20 cm WIDTH
608j1 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR 4.0 M EACH 86.03 3.73 217.60 76.84 384.20
ARROWS
608j2 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR 4.0 M EACH 86.03 7.90 851.20 236.28 1,181.41
ARROWS
608n1 PAVEMENT MARKING IN NON-REFLECTIVE CR PAINT FOR EACH 71.69 3.73 104.50 44.98 224.89
STOP
608n2 PAVEMENT MARKING IN NON-REFLECTIVE TP PAINT FOR EACH 71.69 7.90 338.66 104.56 522.81
STOP
608n3 PAVEMENT MARKING IN REFLECTIVE CR PAINT FOR STOP EACH 71.69 3.73 145.07 55.12 275.61
608n4 PAVEMENT MARKING IN REFLECTIVE TP PAINT FOR STOP EACH 71.69 7.90 568.32 161.98 809.89
609c REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.96 81.62 193.99 71.64 358.21
SINGLE)
609d REFLECTORIZED PAVEMENT STUD (RAISED PROFILE TYPE - EACH 10.96 81.62 233.99 81.64 408.21
DOUBLE)
610b RIGHT OF WAY MARKER EACH 104.00 121.33 308.59 133.48 667.39
610c KILOMETRE POST (0.610 X 0.114 X 1.5 M) EACH 667.81 976.31 2,098.58 935.67 4,678.37
610d TEN KILOMETRE POST EACH 1,287.83 1,952.61 4,588.19 1,957.16 9,785.79
611a CHAIN LINK WIRE FABRIC FENCING 1500 MM HEIGHT WITH M 147.05 91.00 959.63 299.42 1,497.11
PRECAST PRESTRESSED R.C.C. POST
Page 203
.