DOUBLE SEAM INSPECTION REPORT Date / Time: Sample Time: Inspector: plant. SHARP CSINK DEPTH SEAM THICKNESS SEAM HEIGHT BODY HOOK COVER HOOK OVERLAP MIN MAX TIGHT % REMARKS / CORRECTIVE ACTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 P. RIDGE TIGHT Operator Signature: Supervisor Signature:

Uploaded by

S M Arif Hussain
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
354 views1 page

Seam Evaluation Sheet

DOUBLE SEAM INSPECTION REPORT Date / Time: Sample Time: Inspector: plant. SHARP CSINK DEPTH SEAM THICKNESS SEAM HEIGHT BODY HOOK COVER HOOK OVERLAP MIN MAX TIGHT % REMARKS / CORRECTIVE ACTION 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 P. RIDGE TIGHT Operator Signature: Supervisor Signature:

Uploaded by

S M Arif Hussain
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

DOUBLE SEAM INSPECTION REPORT

Date / Time: Plant: End MFG:

Sample Time: Line: End Code:

Inspector: Size: Body MFG:

Product: Body Code:

HEAD SHARP CSINK SEAM SEAM BODY COVER OVERLAP P. TIGHT REMARKS / CORRECTIVE ACTION
NO. DEPTH THICKNESS HEIGHT HOOK HOOK RIDGE
Y/N MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX MIN MAX Y/N %

10

11

12

13

14

15

16

17

18

SHARP CSINK SEAM SEAM BODY COVER OVERLAP P. TIGHT


DEPTH THICKNESS HEIGHT HOOK HOOK RIDGE

USL

TG

LSL

Operator Signature: Date: Supervisor Signature: Date: