Work To Do
Work To Do
Sr. Observations No. Plant IA 1 PVC curtains to change and make effective 2 To cover cable tray in packing room 3 To fix loose electric cable of blender 4 Cleaning of all windows 5 Exhaust in blending room 6 Flooring in dryer room (Replacement of tiles or vinyl flooring) 7 Painting on dryers 8 Replacement of broken SOP holders 9 Proper covers on drain lines 10 Guards on centrifuges and pumps 11 To replace or repair chipping of glazed tiles. 12 Painting of utility lines 13 White wash on walls and ceiling 14 Closing of door behind vacuum distillation unit 15 Painting on reactor tops 16 Closing of all openings outside plant 17 Filling of cracks and gaps, cavities on walls, ceiling 18 Net outside windows to prevent birds 19 Cleaning of status boards 20 Aluminium sheets on insulation of header of reactor SSR 110A and other
Remarks
places 21 Provision of rubber sheet on floor of electric room 22 Mismatching of identification labels on panel board 23 Flooring at front area of plant IB 24 Painting of all aluminium doors 25 Provision for storage of mother liquor and waste water. 26 Proper closure of steam traps in centrifuge area. Plant II 27 Replace broken glass on window of dryer room. 28 Identification no. and status of reactor MSRL outside plant IB 29 Exhaust in electric panel room, cleaning of room 30 Painting of dryer, dryer room, hoist. 31 Finishing of dryer room, closing of opening of TD-201 room 32 Painting of wall, ceiling and utility lines 33 Removal of loose electrical cables 34 Closing of door behind ANF-202 35 Cleaning of change room and white wash 36 P & ID to prepare 37 Status board of utility lines 38 Carbon storage area to define 39 Guard on scrubber motor
40 41 42 43 44 45 46 47 48 49 50 51 52
Repairing of FBD room door Partition between TD 202 & 203 Check fire extinguisher location and status Room door glass on second floor. Reactor insulation sheets to check at bottom Emergency switch identification Painting of fire hydrant lines outside building. Cleaning of soak pit and surrounding area mainly backside of all plants Maintenance and painting of stair and railings. Removal of old AC from room. Removal of GC gas tubing from old QC room. Proper identification and allocation of rooms on first and second floor. Shifting of containers and misc. items from all rooms