Concrete Pour Card

This concrete pour card summarizes information for a concrete pour, including the customer name, worksite location, grade of concrete, cement ratio, and inspection items. It lists details on the cement, sand, metal, and concrete quantities used. It also specifies the coordinates, levels, shuttering, reinforcement, inserts, and other items to inspect. The form captures the estimated and actual cement consumption and bags used, as well as the cube identification numbers and test report references. Spaces are included for the contractor and client/consultant to authorize proceeding with the pour.

Uploaded by

egirijesh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (2 votes)
7K views1 page

Concrete Pour Card

This concrete pour card summarizes information for a concrete pour, including the customer name, worksite location, grade of concrete, cement ratio, and inspection items. It lists details on the cement, sand, metal, and concrete quantities used. It also specifies the coordinates, levels, shuttering, reinforcement, inserts, and other items to inspect. The form captures the estimated and actual cement consumption and bags used, as well as the cube identification numbers and test report references. Spaces are included for the contractor and client/consultant to authorize proceeding with the pour.

Uploaded by

egirijesh
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Split by PDF Splitter

UNNATTI CONSTRUCTIONS PVT. LTD.


(ISO 9001:2000)
CONCRETE POUR CARD
SL. NO. .................
DATE .....................
NAME OF CUSTOMER
..............................
NAME OF WORK
...............................
WORKSITE :...............
GRADE OF CONCRETE
...............................
LOCATION OF CONCRETING ...........................
REFERENCE DRAWING
...............................
(WITH REV. NO.)
SLUMP CEMENT RATIO
.................................
INSPECTION ITEMS
.................................
A) CEMENT
B] SAND:
C] METAL :
Grade:
Bulkage:
Size/ Volume :
Company :
Silt Content:
PPC/OPC/SRC :
Volume:
1)
CO-ORDINATES
:
2)
LEVEL
:
3)
SHUTTERING/CENTERING :
4)
REINFORCEMENT STEEL :
5)
INSERTS
:
6)
ANCHOR
:
7)
POCKETS/OPENING
:
8)
MEASUREMENT
:
9)
COVER TO REINFORCEMENT :
1) P.C.C. QUANTITY
:
2) R.C.C. QUANTITY
:
9)
TIME OF COMMENCE EMENT :
FROM :
:
TO:
:
10)

CEMENT CONSUMPTION
BAGS :

CUBE IDENTIFICATION NOS.

TEST REPORTS REF.

Estimated

Actual

AUTHORISED TO POUR"