100% found this document useful (4 votes)
4K views1 page

SAP PP Integration With Other Modules

This document summarizes the integration between SAP Production Planning (PP) module with other SAP modules. It outlines how PP interacts with Sales and Distribution (SD), Materials Management (MM), Controlling (CO), Financial Accounting (FI), Quality Management (QM), and Project System (PS) for processes like availability checks, goods movements, purchasing, costing, accounting, inspections, and project planning. Key areas of integration include MRP runs, backflushing, reservations, price updates, costing variants, inspections, and BOM transfers to projects.

Uploaded by

Vivek Malik
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (4 votes)
4K views1 page

SAP PP Integration With Other Modules

This document summarizes the integration between SAP Production Planning (PP) module with other SAP modules. It outlines how PP interacts with Sales and Distribution (SD), Materials Management (MM), Controlling (CO), Financial Accounting (FI), Quality Management (QM), and Project System (PS) for processes like availability checks, goods movements, purchasing, costing, accounting, inspections, and project planning. Key areas of integration include MRP runs, backflushing, reservations, price updates, costing variants, inspections, and BOM transfers to projects.

Uploaded by

Vivek Malik
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

SAP PP Integration with Other Modules

KEY POINTS PP-SD

Availability Check MTO Scenario-MRP Run, Requirement Types Variant Configuration - Selection/requirements of BOM Components and operation PP-MM Goods movements - Backflush, Auto Goods Receipt STO, Reservation created for Production Order/Planning Creation of Purchase Requisitions, Purchase orders with MRP Run Quota arrangements/info record usage for sub-contracting/to choose the right vendor PP-CO Price update in material master Assigning price to activity type for the specific period in the fiscal year. Activity Type in the Cost center assigned in the WorkCenter Order Type - Settlement Profile, Costing and Valuation Variants Product cost Collector Standard Cost Estimate WIP and Variance Calculation Costing Sheets for overheads PP-FI Account posting entries for each Goods movement related to PP with Valuation Class, Material Type and Movement Type PP-QM Inprocess inspection with Inspection Type 03-Discrete(After Production Order Release) and 13-Repetetive Manufacturing(Manually through MFPR) Goods Receipt inspection with Inspection Type 04 for both Discrete and Repetitive Manufacturing PP-PS BOM transfer (CN33) to required project with BOM usage 3 (Universal). Components assigned to WBS and/or Network in the Project. If the components are attached to WBS, than they are planned with respect the project system. MRP is run at Project level (MD51). The procured material attached to WBS are reseverd as project stock against the the particular project. The component attached to network are planned at plant level and are reserved as plant stock.

You might also like