Cea Committee Proposed Fgmo Scheme: Fq error switchi ng ckt +/-ΔP to Load Controller

The document proposes two schemes to modify the existing frequency governor load management (FGMO) scheme for a power plant to bring it in line with Central Electricity Authority guidelines. Scheme I adds frequency switching when the frequency is within or outside 49-50.5 Hz, and a load limiter at +/- 5% of the setpoint. Scheme II modifies the pressure and frequency reference signals to the load limiter based on the frequency. Both schemes require additional hardware cards for implementation, with Scheme I requiring AGS-11, AVG-11 and AFZ cards, and Scheme II requiring AVB-11 and AFZ cards.

Uploaded by

Sam
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views

Cea Committee Proposed Fgmo Scheme: Fq error switchi ng ckt +/-ΔP to Load Controller

The document proposes two schemes to modify the existing frequency governor load management (FGMO) scheme for a power plant to bring it in line with Central Electricity Authority guidelines. Scheme I adds frequency switching when the frequency is within or outside 49-50.5 Hz, and a load limiter at +/- 5% of the setpoint. Scheme II modifies the pressure and frequency reference signals to the load limiter based on the frequency. Both schemes require additional hardware cards for implementation, with Scheme I requiring AGS-11, AVG-11 and AFZ cards, and Scheme II requiring AVB-11 and AFZ cards.

Uploaded by

Sam
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PPT, PDF, TXT or read online on Scribd
You are on page 1/ 6

CEA COMMITTEE PROPOSED FGMO SCHEME

Fq error switchi ng ckt

Droop Ckt @8% Load Limit +/- 5%

+/- Pr to Load Controller

Actual Frequency

Frequency Limiter 49.0 to 50.5hz

Time Delayed Frequency

+ -

S U B

Fq<49 hz or >50.5

Feed Forward Signal to Combustion Control

Frequency Error Beyond 49.0 & 50.5

49 HZ

50.5 HZ

EXISTING FGMO SCHEME IN KSTPS STAGE-I


TSE Influence

BLOCK - V Load Set point from CMC / Turbine desk PRTD


AFZ12

BLOCK - II

BLOCK - I
MW

Load
50.5 HZ Time 4 MW / Min

+S U M + M E +R

M I N + To EHC Turbine
AVB11

Actual Frequency

49 HZ

Frequency

BLOCK - III
AFZ11/12

AVG11

FREQ DROOP=8%

_
AFZ11/12
S U B

AFV11,AFL11, AVG11,AVB11

Load limiter Frequency Unloading Characteristic (internal droop)

ARL13

+
Load +5% Load

BLOCK - IV
-5% Load LIMITER

AVB11 Pressure Correction

PROPOSED FGMO SCHEME I IN LINE WITH THE PRESENT CEA SCHEME


TSE Influence

BLOCK - V Load Set point from CMC / Turbine desk _ BLOCK - II PRTD
S U B

BLOCK - I
MW

Load
53 HZ Time 4 MW / Min

+S U M + M E +R

M I N + To EHC Turbine

Actual Frequency

47 HZ

Frequency

FREQ DROOP=8%

Load limiter Frequency Unloading Characteristic (internal droop)

PRf for 49 hz PRf for 50.5 hz

Frequency switching as frequency within or outside 49 to 50.5 hz Load Limiter @ +/- 5%

Pressure Correction

PROPOSED MODIFICATION

Fq<49 hz or >50.5

HARDWARE REQUIREMENT FOR MODIFICATION

AGS-11 CARD AVG-11 CARD AFZ-11/12 CARD

02 NOS/UNIT 02 NOS/UNIT 01 NO/UNIT

PROPOSED FGMO SCHEME II IN LINE WITH THE PRESENT CEA SCHEME


TSE Influence

Load Set point from CMC / Turbine desk

PRTD
AFZ12

MW

Load
53HZ

+S U M + M E +R

M I N + To EHC Turbine
AVB11

-1 +2

Time

Act Fq

47 HZ

Fq

AVG11
4 MW / Min

AFZ11/12

FREQ DROOP=8%

LIMITER

_
AFZ11/12
S U B

Load limiter Frequency Unloading Characteristic (internal droop)

ARL13

+
Pr 49.0 HZ = +2 v Pr 50.5 HZ = -1 V Load +5% Load

PROPOSED MODIFICATION

-5% Load LIMITER

AVB11 Pressure Correction

HARDWARE REQUIREMENT FOR MODIFICATION

AVB-11 01NO/UNIT AFZ-11/12 01NO/UNIT