0% found this document useful (0 votes)
312 views9 pages

WASN9770 V300 NPI Spare Parts Inventory Model-20111101-A-V1.2

Uploaded by

sharenck
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
312 views9 pages

WASN9770 V300 NPI Spare Parts Inventory Model-20111101-A-V1.2

Uploaded by

sharenck
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

Book1

FR (Failure Rate) Inventory Model


Released on: 2004.05.10

Notes: 1. This document provides a method for realization of inventory model based on Excel. Fro principles of inven

2. The output of the inventory model is the minimum inventory a user should hold, and the minimum inventory 3. The user may adjust the parameters of parts turn around cycle, expected fulfillment rate, parts importance 4. For a small-amount contract, type-A parts should be provided in preference as spare parts, the monomum Data Source:
1. Huawei ERP Production System

2. Huawei Integrated Equipment Board /Device Reliability Analysis System

6/23/2013

19

Book1

el based on Excel. Fro principles of inventory model, please refer to the "Inventory Model Specifications"; should hold, and the minimum inventory derived will be the minimum board configuration quantity of the sold equipment;

pected fulfillment rate, parts importance level, network capacity, and may revise the board failure rate in the document, and mark

eference as spare parts, the monomum quantity is 1 piece;

6/23/2013

29

Book1

on quantity of the sold equipment;

rd failure rate in the document, and mark them as blue, but other parameters should not be changed;

6/23/2013

39

Book1

Model input Capacity in the Network FR (Failure Rate) TAT (Turn around Time) Expected PFR (Parts Fulfillment Rate) Parts turn around cycle (Days) = Operator processing time + Maintainer processing time + En route time

Parts fulfillment rate depends on parts importance matrix (PCM); PCM involves levels based on material importance and failure rate (FR), eg, if the level of the PCM of a material is AB, it indicates that its importance is A, and its FR is B. The hinder the letter is, the higher level it will be.

Model output

Item PGP-8 03030HAT 03052274 03052293 03052275 03052276 03052652 03052653 34100052 34060219 34060286 34060362 34060313 02270059

6/23/2013

49

Book1 02120406 02300628 PGP-16 03030LGL 03052636 03052293 03052275 03053558 03052276 03052652 03052653 03053561 03053562 03053563 34100052 34060219 34060286 34060362 34060313 02270089 02120482 02300655

6/23/2013

59

Book1 Realization of Service Parts Inventory Module Based on Excel Realization of PTO Inventory Module Based on Excel All rights reserved Model input Capacity in the Network FR (Failure Rate) TAT (Turn around Time) Expected PFR (Parts Fulfillment Rate)

Parts turn around cycle (Days) = Operator processing time + Maintainer processing time + En route time

Parts fulfillment rate depends on parts importance matrix (PCM); PCM involves levels based on material importance and failure rate (FR), eg, if the level of the PCM of a material is AB, it indicates that its importance is A, and its FR is B. The hinder the letter is, the higher level it will be.

Model output

Capacity in Network can be adjusted depending on the actual conditions of the sales contract

ABC type can be adjusted depending on actual conditions

Desc PGP-8

PGP,KW51ESRU0,Enhanced Switch and Route Processing Unit PGP-WP21SFUD0,Switch Fabric Unit D PGP,WP21ESPUd,Enhanced Service Processing Board,Double CPU,16GB PGP,WP21DMPUA,Daughter MIPS Processing Unit Flexible Card Line Processing Unit(LPUF-21,2 sub-slots) 1-port 10GBase WAN/LAN XFP Flexible Interface Daughter Card 12-port 100/1000Base-X SFP Flexible Interface Daughter Card 1000BASE-T (RJ45) SFP Electrical Module,Auto Negotiate,100m transceiver,eSFP,1310nm,1.25Gb/s,-3dBm~-9.5dBm,-20dBm,LC,10km Optical Transceiver,eSFP,850nm,2.125Gb/s(Multi rate) ,-9.5~-2.5dBm,17dBm,LC,MM,0.5km Optical Transceiver,XFP,850nm,10.3Gb/s,-7.3dBm,-1.3dBm,-7.5dBm,LC,Multimode,0.3Km Optical Transceiver,XFP,1310nm,9.95~10.71Gb/s,-6dBm,-1dBm,-11dBm,LC,10km DC/DC Power Module,3700W,-5degC,55degC,-38V,-75V,-36~-75VDC,Main Output 75A;Auxiliary -48V/5A,0A,RS48

6/23/2013

69

Book1

NetEngine5000E,CR5E2TSR,Integrated Chassis 9-fan Fan Box,1U Height DKBA4.106.1359MX,NE40E-8(20U) Frame,442mm*670mm*20U,Sheetmetal PGP-16 Main Processing Unit Switch Fabric Unit G PGP,WP21ESPUd,Enhanced Service Processing Board,Double CPU,16GB PGP,WP21DMPUA,Daughter MIPS Processing Unit Enhanced Service Processing Unit E Flexible Card Line Processing Unit(LPUF-21,2 sub-slots) 1-port 10GBase WAN/LAN XFP Flexible Interface Daughter Card 12-port 100/1000Base-X SFP Flexible Interface Daughter Card Flexible Card Line Processing Unit(LPUF-40,2 sub-slots) A 2-Port 10GBase LAN/WAN-XFP Flexible Card A(P40-A,Supporting 1588v2) 20-Port 100/1000Base-X-SFP Flexible Card A(P40-A,Supporting 1588v2) 1000BASE-T (RJ45) SFP Electrical Module,Auto Negotiate,100m transceiver,eSFP,1310nm,1.25Gb/s,-3dBm~-9.5dBm,-20dBm,LC,10km Optical Transceiver,eSFP,850nm,2.125Gb/s(Multi rate) ,-9.5~-2.5dBm,17dBm,LC,MM,0.5km Optical Transceiver,XFP,850nm,10.3Gb/s,-7.3dBm,-1.3dBm,-7.5dBm,LC,Multimode,0.3Km Optical Transceiver,XFP,1310nm,9.95~10.71Gb/s,-6dBm,-1dBm,-11dBm,LC,10km DC/DC Power Module,8000W,-5degC,55degC,-38V--75V,-36V--75V,Main Output 67.5A*3,Auxiliary -48V/13A,0A,I2 NetEngine5000E,CR5E1FBX,Integrated Chassis 3-fan Fan Box GGSN9811,KW5K00GSPM16,GGSN Service Processing Module Subrack(PGP-16),GGSN V9

6/23/2013

79

Book1

Parts turn around cycle can be adjusted depending on customer conditions

ocessing time + En route

Number of days

60

Importance Fulfillment rate A B C 99.9% 95.0% 85.0%

nding on actual conditions

Model output refers to the minimum quantity of spare parts of each material being marketed that should be configured as the capaciity in network

Importance Annual ABC of Failure Rate Spare Part FR A A A B B B B B B B B B A 1.61% 0.50% 1.61% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.03%

Capacity in Lowest Inv Network 0 0 0 0 0 0 0 0 0 0 0 0 0

Spare Part Satisfaction Rate PFR 99.9% 99.9% 99.9% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 99.9%

PGP-8

6/23/2013

89

Book1 B A A A A B A B B B B B B B B B B B A B A 0.63% 0.10% 1.61% 0.50% 1.61% 0.50% 2.00% 0.50% 0.50% 0.50% 1.50% 1.50% 1.50% 0.50% 0.50% 0.50% 0.50% 0.50% 0.63% 0.13% 0.10% 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 95.0% 99.9% 99.9% 99.9% 99.9% 95.0% 99.9% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 95.0% 99.9% 95.0% 99.9%

PGP-16

6/23/2013

99

You might also like