50% found this document useful (4 votes)
1K views7 pages

Galvanizing Procedure PDF

This 3 sentence summary provides the key details about the hot-dip galvanizing procedure document: The document outlines the detailed hot-dip galvanizing procedure used by the company, including pre-treatment of the metal surface, galvanizing in the zinc bath, quenching, centrifuging, post-treatment, and testing to ensure a smooth, bright, and uniformly thick zinc coating is achieved according to industry standards. Quality checks like visual appearance, coating thickness measurement, adhesion testing, and embossment testing are performed to make sure the galvanized parts meet specifications. Detailed records of all galvanizing tests are maintained.

Uploaded by

khuzafa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
50% found this document useful (4 votes)
1K views7 pages

Galvanizing Procedure PDF

This 3 sentence summary provides the key details about the hot-dip galvanizing procedure document: The document outlines the detailed hot-dip galvanizing procedure used by the company, including pre-treatment of the metal surface, galvanizing in the zinc bath, quenching, centrifuging, post-treatment, and testing to ensure a smooth, bright, and uniformly thick zinc coating is achieved according to industry standards. Quality checks like visual appearance, coating thickness measurement, adhesion testing, and embossment testing are performed to make sure the galvanized parts meet specifications. Detailed records of all galvanizing tests are maintained.

Uploaded by

khuzafa
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

QUALITY SYSTEM PROCEDURE

Page 1 of 5

TITLE PROCEDURE NO REVISION

: HOT-DIP GALVANIZING PROCEDURE. : II PR LM!""" "# : "" DATE: 15."!.#""$.

PREPARED %Y
S.TAMIZH SELVAN' ENGINEER ( QUALITY.

CHEC&ED %Y
R. %ALAMURUGAN' MANAGER - QUALITY

II PR LM!""" "#

REV.""

DATE PAGE

15."!.#""$ # O) 5

HOT-DIP GALVANIZING PROCEDURE

REVISION STATUS

REV

DATE

CHANGE

II PR LM!""" "#

REV.""

DATE PAGE

15."!.#""$ * O) 5

HOT-DIP GALVANIZING PROCEDURE

PROCEDURE )OR GALVANIZING + STEEL 1. SCOPE: This procedure deals with the galvanizing procedure of hot-dip galvanizing of iron & steel. RE)ERENCE : ASTM A123-2001 ASTM A1!3 ASTM A1"3 ASTM #$ SS%& S%1 & S%11 PROCEDURE : 3.1 P,e-a,a./o0 of Me.a1 23,fa4e fo, Ga15a0/6/0g. 3.1.1 C1ea0/0g: 'e(oving of &onta(ination li)e oil* grease or paint over the surface to +e galvanized. &leaning carried out +, dipping the wor) in degreasing +ath and should +e raised and lowered in order to allow degreasing solution to enter inaccessi+le areas. Then i((ediatel, after degreasing the wor) should +e rinsed in hot water -$00&. followed +, finding rinsing in cold running water. 3.1.2 P/471/0g: 'e(oval of scale* patches and +urnt-on on the surface to +e galvanized +, dipping the wor) in pic)ling +ath -/iluted h,drochloric acid or sulphuric acid. with suita+le inhi+itor. 3.1.3 R/02/0g: After pic)ling the wor) should +e thoroughl, rinsed in running water. 3.1.4 )138/0g: 0or) is dipped in a strong solution of zinc a((oniu( chloride. 1ote2 %re flu3ed & dried wor) should +e galvanized without dela, i.e. within an hour of flu3ing *.# Ga15a0/6/0g: 3.2.1 Ga15a0/6/0g 9a.:2 4alvanizing +ath should contain not less than an average of 56.07 zinc +, weight. The zinc used in the +ath should confor( to Specification #$ -Sla+ zinc.. Te(perature of the +ath is so critical to have consistenc, in product 8ualit, & to econo(icall, use zinc. 'ate of i((ersion is as rapid as possi+le to reduce a(ount of dross & to have unifor(it, of coating. 3.3 ;a.e, Q3e04:/0g: To re(ove flu3 residues* wor) is 8uenched in water.

2. 3.

II PR LM!""" "#

REV.""

DATE PAGE

15."!.#""$ < O) 5

HOT-DIP GALVANIZING PROCEDURE

3.4 Ce0.,/f3g/0g: S(all articles are handled in +as)ets. The, are centrifuged to re(ove e3cess of zinc i((ediatel, after galvanizing while the coating is still in the (olten condition. Threads on articles which are unsuited for centrifuging shall +e cleaned with a rotating wire +rush i((ediatel, after galvanizing +efore the coating sets. 3.5 Po2.-.,ea.=e0.: To avoid for(ation of 9white rust: or 9wet storage stain: on freshl, galvanized surfaces post treat(ent li)e chro(ating is carried-out which will retard 9white rust: attac) te(poraril,. 3.6 S.a47/0g :To avoid fla)ing of coating articles are stac)ed i((ediatel, after 8uenching to allow the articles to dr, +efore an, further handling. <. Te2./0g a0> /02-e4./o0: 4.1 V/23a1 A--ea,a04e: &oating shall +e adherent* s(ooth* reasona+l, +right* continuous & free fro( i(perfections such as flu3 ash and dross insulation +are & +lac) spots* pi(ples* lu(piness & runs* rust stains* +ul), white deposits & +listers. 1o traces of solidified drop or sharp edges accepta+le. 4.2 Coa./0g .:/470e22: An, one of the following (ethod is used to deter(ine the coating thic)ness2 4.2.1 Mag0e./4 T:/470e22 Mea23,e=e0.: ;sing (agnetic thic)ness gauge the thic)ness of the coating is (easured in accordance with %ractice < 3=$. A (ini(u( of five readings shall +e ta)en at each location near the ends and in the (iddle of each piece +eing tested. >or large products* the (ini(u( of five readings in a location shall +e ta)en peripherall, a+out " in. -100 ((. fro( each end and in the appro3i(ate center of the (e(+er. 4.2.2 S.,/--/0g Me.:o>: The average weight of zinc coating (a, +e deter(ined +, stripping test pieces fro( the sa(ple at location appro3i(atel, " in. -100((. fro( each end and third fro( the appro3i(ate center of the (e(+er. The weight of coating is (easured and should confor( to the standard. 0eight of coating per s8uare foot of actual surface shall average not less than 3 ounces and no individual speci(en shall show less than 2.! ounces. 4.2.3 ;e/g:/0g 9efo,e a0> af.e, ga15a0/6/0g: The average weight of the zinc coating is deter(ined +, weighing the article +efore and after galvanizing.

II PR LM!""" "#

REV.""

DATE PAGE

15."!.#""$ 5 O) 5

HOT-DIP GALVANIZING PROCEDURE

4.3 A>:e2/o0 Te2.: The test is conducted on coated surface +, cutting or pr,ing with the point of a stout )nife* applied with considera+le pressure in a (anner tending to re(ove a portion of the coating. 4.4 E=9,/..1e=e0. Te2.: The test is conducted in accordance with practice A 1"3 6. Re-a/, of Ga15a0/6e> 23,fa4e2: All 4alvanizing surfaces that re8uire welding* cutting* drilling or other preparation and an, galvanized surface that has +een da(aged shall +e repaired with an approved coating repair s,ste(. #efore application of repair coating surfaces shall +e prepared in accordance with SS%& S%1* followed +, SS%& S%11. $. Re4o,>2: Sa(ple 4alvanizing test report for( as in Anne3 A ------------------------------------------------------------------------------------------------------

ANNEXURE - A GALVANIZING - SUPPLIER NAME & ADDRESS

T.C. NO. : TO M/s. INDIRA INDUSTRIES NO 6, SIPCOT INDUSTRIAL COMPLEX RANIPET 632 403

DATE : YOUR PURCHASE ORDER No. PROJECT :

. R!"!#!$%! S&'$('#(

TEST CERTIFICATE ASTM A123 - 2001

2. N')! o" &*! +,$% Us!( - P!#%!$&'.! 3. Co)/o$!$& D!s%#,/&,o$ - 01'$&,&2 4. T!s& s')/3! s,4! 5. M'.$!&,% 6'1.! #!'(,$. 6. S&#,/! &!s& #!s13& 7. 8$,"! &!s& 9. :,s1'3 I$s/!%&,o$

;. O&*!#s