0% found this document useful (0 votes)
101 views3 pages

Work Break Down Structure

A work breakdown structure (WBS) is a diagram that breaks a project down into smaller, more manageable tasks. It visually shows the relationships between tasks and how they contribute to project objectives. The WBS is structured like a tree diagram with the overall objective at the top and increasingly specific tasks below. It ensures all necessary tasks are included and avoids redundancy. A well-developed WBS assists with resource allocation, budgeting, scheduling, and accountability.

Uploaded by

leogopal
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
101 views3 pages

Work Break Down Structure

A work breakdown structure (WBS) is a diagram that breaks a project down into smaller, more manageable tasks. It visually shows the relationships between tasks and how they contribute to project objectives. The WBS is structured like a tree diagram with the overall objective at the top and increasingly specific tasks below. It ensures all necessary tasks are included and avoids redundancy. A well-developed WBS assists with resource allocation, budgeting, scheduling, and accountability.

Uploaded by

leogopal
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

Work Break Down Structure

A work breakdown structure (WBS) is a chart in which the critical work elements, called tasks, of a project are illustrated to portray their relationships to each other and to the project as a whole. The graphical nature of the WBS can help a project manager predict outcomes based on various scenarios, which can ensure that optimum decisions are made about whether or not to adopt suggested procedures or changes. When creating a WBS, the project manager defines the key objectives first and then identifies the tasks required to reach those goals. A WBS takes the form of a tree diagram with the "trunk" at the top and the "branches" below. The primary requirement or objective is shown at the top, with increasingly specific details shown as the observer reads down. When completed, a well-structured WBS resembles a flowchart in which all elements are logically connected, redundancy is avoided and no critical elements are left out. Elements can be rendered as plain text or as text within boxes. The elements at the bottom of the diagram represent tasks small enough to be easily understood and carried out. Interactions are shown as lines connecting the elements. A change in one of the critical elements may affect one or more of the others. If necessary, these lines can include arrowheads to indicate time progression or causeand-effect. A well-organized, detailed WBS can assist key personnel in the effective allocation of resources, project budgeting, procurement management, scheduling, quality assurance, quality control, risk management, product delivery and service oriented management.

Key benefits to developing a WBS are:

1. WBS forces the team to create detailed steps The WBS forces the project manager, team members, and customers to delineate the steps required to build and deliver the product or service. The exercise alone encourages a dialogue that will help clarify ambiguities, bring out assumptions, narrow the scope of the project, and raise critical issues early on. 2. WBS lays the groundwork for schedule and budget It lays the groundwork for developing an effective schedule and good budget plans. A welldefined WBS enables resources to be allocated to specific tasks, helps in generating a meaningful schedule, and makes calculating a reliable budget easier. 3. WBS creates accountability The level of detail in a WBS makes it easier to hold people accountable for completing their tasks. With a defined WBS, people cannot hide under the cover of broadness. A well-defined task can be assigned to a specific individual, who is then responsible for its completion. 4. WBS creation breeds commitment The process of developing and completing a WBS breeds excitement and commitment. Although the project manager will often develop the high-level WBS, he will seek the participation of his core team to flesh out the extreme detail of the WBS. This participation will spark involvement in the project.

Work Break Down Structure Diagram

You might also like