Guidance Notes Revision

This guidance note provides an update to the existing OISD guidance note on verification of fitness of offshore drilling rigs. It specifies the detailed elements that operators must address to demonstrate that a mobile offshore drilling rig (MODU) has been designed, constructed, installed and maintained for the intended operating and environmental conditions in compliance with relevant rules and standards. Key documents required for verification include classification certificates, MODU safety certificates, certification of drilling systems, and descriptions of operational limitations. Alternate certification requirements are also outlined. Applicable standards for critical drilling equipment are referenced to demonstrate compliance.

Uploaded by

bhuvanchaudhari
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
115 views9 pages

Guidance Notes Revision

This guidance note provides an update to the existing OISD guidance note on verification of fitness of offshore drilling rigs. It specifies the detailed elements that operators must address to demonstrate that a mobile offshore drilling rig (MODU) has been designed, constructed, installed and maintained for the intended operating and environmental conditions in compliance with relevant rules and standards. Key documents required for verification include classification certificates, MODU safety certificates, certification of drilling systems, and descriptions of operational limitations. Alternate certification requirements are also outlined. Applicable standards for critical drilling equipment are referenced to demonstrate compliance.

Uploaded by

bhuvanchaudhari
Copyright
© Attribution Non-Commercial (BY-NC)
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 9

Subject: Verification of fitness of offshore Drilling Rigs

Date: 28th September 2011 OISD guidance note on the above subject has been available on OISD website since October 2010. The same has been updated. Reason for update: Based on the eedbac! rom industr"# speci ics li!e standards$ edition %revision number and "ear& have been included where particular section o the standard has been re erred 'elsewhere# latest standards are to be re erred( and re erence to ISO standards which had e)uivalenc" issues * +,I publication which has been withdrawn# have been deleted. Basic framewor of the guidance note remains the same. -ule .0 on the above subject re)uires independent veri ication o purpose condition# which is the abilit" o it or

the installation to per orm

intended unction. -e)uirements as per sub/rule %2& includes# assessment o design and construction o the installation in relation to the conditions under which it is to be installed and used0 designing# constructing# installing and maintaining the installation in accordance with recogni1ed standards0 installation. +ctions re)uired# or compl"ing with the re)uirements o -ule .0 include2 a. Design 3 construction veri ication b" independent part". b. 4it or purpose status o an installation is to be ensured through certi ication b" an independent reputed part" or b" an" member o the classi ication societ". c. 5alid certi icate means certi icate issued b" an independent part" %including an" member o the classi ication societ"& or a i6ed time period. d. 7erti ication 3 classi ication should include veri ication o the drilling s"stem. and maintaining a valid certi icate o itness or the

This guidance note is being issued to speci " the detailed elements to be addressed b" Operator# to demonstrate that 89obile O shore Drilling rig %9OD:& has been designed and maintained or the identi ied operating and environmental conditions# in compliance with the -ule .0. !! Documents re"uired to be submitted to demonstrate

compliance are: 1. 2. .. ;. 7lassi ication certi icate. 9OD: sa et" certi icate. 7erti ication o drilling s"stem and other related e)uipment. Description o operations which ma" be carried out b" the 9OD: under implied limitations resulting rom2 a. -is! anal"ses b. <6treme condition %damaged stabilit"& c. <6treme environment d. Simultaneous operations e. Impairment o sa et" critical e)uipment

BB

!lternate certification re"uirements These re)uirements are to be met in the absence o evidence o compliance against point 2 and . o ++ above.
#$planator% note: 1. :nless it is speci icall" as!ed or rom classi ication societ" %would be in orm o additional notation&# the classi ication re)uirements or drilling and normall" do not cover e)uipment used e6clusivel" related operations. a. 9achiner"# electrical and piping s"stems used e6clusivel" or drilling purposes are not covered b" the re)uirements# e6cept in so ar as their design or arrangement ma" a ect the sa et" o the unit.

b.

The assessment o the re)uired holding capacit"# arrangement and operation o position mooring e)uipment and d"namic or station/!eeping activities in positioning e)uipment used

connection with the unit$s operation is the responsibilit" o the owner# and is not included in the re)uirements. 2. 9OD: sa et" certi icate ma" not be the re)uirement o the lag state# where 9OD: is registered.

The re)uirements o the ollowing re erred applicable standards or the listed e)uipment shall be met to demonstrate that drilling s"stems are in compliance with re)uirements o the ,etroleum and =atural >as %Sa et" in O shore Operations& -ules# 200? and 9OD: is thus it or purpose2
S& 'o& 1. #"uipment Drilling structure# drill loor# sub structure# li ting e)uipment. Verification re"uirements +. i. Derric! 3 structures Structures have been designed and abricated b" manu acturers as per +,I Spec ;4 or e)uivalent. This veri ication should include structural sa et" level %re er sections @ and B.@ o +,I Spec ;4&. Di erent categories$ inspection%s& o derric!# structures and drill loor have been carried out as per section @ o +,I -, ;> or e)uivalent and O<9$s recommendations# besides =D< as considered necessar". -epair and modi ication o structures %i carried out# based on inspection& have been carried out as per section A and ? respectivel" o +,I -, ;> or e)uivalent and O<9$s recommendations. Bualit" control o repair and modi ication has been ensured in line with re)uirements o section 11 o +,I S,<7 ;4 or 3 +,I Spec ;4 %.rd <dition 200?& Reference Standard

ii.

+,I -, ;> %.rd <dition# 200;&

iii.

+,I -, ;>%.rd <dition# 200;&

+,I Spec ;4 %.rd <dition 200?&

e)uivalent. B. i. Drilling e)uipment Installation# inspection and maintenance o I7 engines have been carried out as per +,I Spec A7/114 or e)uivalent and O<9$s recommendations. 4or minimi1ing potential ires and3or e6plosions in the operations o I7 engines re)uirements given in +ppendi6 + o +,I Spec A7/114 or e)uivalent# are being ollowed. 4unctional testing o sa et" devices and emergenc" stop unction has been carried out. +,I Spec A7/114 %Eth <dition 1FF;&

ii.

Design# inspection and +,I -, A> operating limits o drill stem components is as per +,I -, A> or e)uivalent. Design o drilling e)uipment +,I %rotar" e)uipment# slush AC pumps# power tongs and draw wor!s& is as per +,I Spec AC or e)uivalent. Spec

iii.

iv.

Inspection# maintenance and +,I -, AD repair o rotar" e)uipment# slush pumps# power tongs and draw wor!s has been carried out as per +,I -, AD or e)uivalent and O<9$s recommendations. Inspection has included =D< and3or opening o e)uipment as considered necessar". 4unctional testing o sa et" devices and emergenc" stop unction has been carried out. Design o drilling hoisting e)uipment is as per +,I Spec ?+ and +,I Spec ?7 or e)uivalent. +,I Spec ?+ and +,I Spec ?7

v.

vi.

Inspection# maintenance and +,I -, ?B repair o hoisting e)uipment are as per +,I -, ?B or e)uivalent 4

and O<9$s recommendations. Inspection o hoisting e)uipment has ocused on structural integrit" and personnel protection. 7ategor" III and I5 inspection has included =D< 3 9,I and3or opening o e)uipment as considered necessar". 4unctional testing o sa et" devices and emergenc" stop unction has been carried out. vii. 9inimum re)uirements and +,I Spec terms o acceptance o steel F+ 3 wire ropes as per +,I Spec F+ 3 ISO 10;2E ISO 10;2E or e)uivalent are being ollowed. 4ield care %inspection& and use o wire rope and evaluation o rotar" drilling line has been carried out as per +,I -, FB or e)uivalent. Inspection o piping and piping s"stems has been carried out as per +,I -, EA0 and +,I -, EA;. ,ressure vessels have been inspected e6ternall" and internall"0 thic!ness measurement 3 crac! detection tests have been carried out as deemed necessar". ,ressure testing at a pressure e)ual to ma6imum allowable wor!ing pressure has been carried out. Sa et" valves 3 instrumentation have been tested. Design o drill through e)uipment 3 blowout prevention e)uipment H ram and annular blowout preventers# h"draulic connectors# drilling spools# adaptors etc. is as per +,I Spec 1@+ 3 ISO 1.E.. or e)uivalent. -ecords o maintenance %including major inspection as per section 1A.10.. o +,I -, E. and O<9$s recommendations& 5 +,I -, FB

viii.

i6.

+,I -, EA0 and +,I -, EA;

6.

2.

Gell 7ontrol S"stems2 blow out preventers# diverters# marine risers# cho!e and !ill s"stem# control s"stems or

+.

+,I Spec 1@+ %.rd <dition 200;& 3 ISO 1.E.. % 2001&

+,I -, E. %.rd <dition

well control e)uipment.

have been reviewed. Installation 1FFA& or and testing %complete OISD/-,/ per ormance testing including 1A; unctional and pressure tests& o blow out control e)uipment is being carried out in line with +,I -, E. or OISD/-,/1A; or e)uivalent. B. Design and maintenance o diverter s"stems is as per +,I -, @; or e)uivalent. Inspection and testing o diverter s"stems has been carried out as per +,I -, @; or OISD/-,/1A; or e)uivalent. Design o cho!e and !ill s"stems is as per +,I Spec 1@7 or e)uivalent. ,ressure testing o cho!e and !ill s"stems is being carried out in line with +,I -, E. or OISD/-,/1A; or e)uivalent. 4le6ible cho!e and !ill lines and cho!e mani old are inspected as per section 1A.10.. o +,I -,/ E.%.rd <dition 1FFA& and O<9$s recommendations. Design o control s"stems or well control e)uipment and diverter e)uipment is as per +,I Spec 1@D and +,I -, E. or e)uivalent and per ormance re)uirements3 testing# inspection and maintenance is as per +,I -, E. or OISD/-,/1A; or e)uivalent and O<9$s recommendations. 9arine drilling riser s"stems or loating drilling operations have been selected# operated and maintained in line with +,I -, 1@B or e)uivalent. Design# manu acture and abrication o marine drilling riser s"stem and associated e)uipment used in conjunction with a subsea blowout preventer %BO,& stac! is as per +,I Spec 1@4 or 6 +,I -, @; or OISD/-,/ 1A;

7.

+,I 1@7

Spec

+,I -, E.%.rd <dition 1FFA& or OISD/-,/ 1A;

D.

+,I Spec 1@D and +,I -, E. +,I -, E. or OISD/ -,/1A; +,I 1@B -,

<.

+,I Spec 1@4 3

+,I 1@-

Spec

..

;.

e)uivalent. Design and standards o per ormance or marine drilling riser coupling is as per +,I Spec 1@- or e)uivalent. -isers and riser couplings 3 joints are being inspected or wear# crac!s and corrosion0 thic!ness measurement has been carried out as re)uired. 9an riding Selection o man riding e)uipment is e)uipment done ensuring that e)uipment is suitable or man riding operations# and the e)uipment are inspected and maintained regularl". Station 5eri " that 9OD:$s station !eeping and !eeping stabilit" characteristics are suitable or s"stems2 the environmental %including sea bed anchoring# and soil conditions& and operating mooring# conditions envelope. Inspection and d"namic maintenance o mooring hardware is as positioning# per +,I -, 2I or e)uivalent and O<9$s compensator recommendations0 and design# and manu acturing and maintenance o disconnection s"nthetic iber ropes or o shore s"stems. mooring is as per +,I -, 2 S9 or e)uivalent. Drilling luid handling and cementing s"stem <lectrical S"stems

+,I -, 2SC % or station !eeping& 9OD: code% or stabilit"& +,I -, 2I +,I -, 2 S9

E.

@.

,h"sical condition o the e)uipment is satis actor" and instrumentation# sa et" alarms and pressure sa et" valves are being tested regularl". +. Design and maintenance o 9OD: electrical s"stems is as per I9O code 9OD: code meeting +,I -, E00 re)uirements o industr" +,I -, E0E standards +,I -, E00 or +,I -, E0E. B. Inspection and unctional testing o emergenc" power s"stem is being carried out. Inspection and testing o the ollowing sa et" s"stems is being carried out periodicall"2 4ire detection s"stem >as detection s"stem H I7 and I2S Drilling operations related alarm s"stem Di e saving appliances 7

A.

Sa et" s"stems %e6clude items which are covered b" 9OD: sa et" certi icate# provided the rig has valid

+.

9OD: sa et" certi icate&

B.

S7B+ >as measuring devices 4ire ighting s"stem 7ommunication s"stems

?.

7ranes %I classed certi icate notation does not cover cranes&

+.

Sa et" s"stems are as per 9OD: code re)uirements# as applicable. Design and testing o pedestal +,I mounted o shore cranes are as 27 per +,I Spec 27 or e)uivalent.

Spec

B.

Operations and maintenance o +,I -, 2D o shore cranes are as per +,I -, 2D or e)uivalent. Inspection has ocused on structural integrit" and includes2 Bloc!s and sheaves Gire ropes and end attachments Ioo!s Bearings Shac!les Securing arrangements Support structure +6le pin and housing Inspection and unction testing has included2 7orrect adjustment o bra!es -esistance measurement o electrical s"stems Dea!ages in h"draulic s"stems

7.

F.

Doad charts have been veri ied b" carr"ing out load tests as per applicable re)uirements. 4unctional testing o sa et" devices and emergenc" stop unction are being carried out. Ielidec! %I Inspection has included2 classed Structural integrit" o dec! and certi icate supporting structure notation Sur ace o dec! does not Obstacles and mar!ing cover Sa et" net helidec!& 4ire sa et" arrangements

D.

(he )alidit% of certificate shall be * %ears+ pro)ided follow up midterm sur)e% , inspection is carried out within - %ears period from date of certification&