Modified SF HP Air Burst: ABR 6009 Vol 2 Chap 4 Original, June 2010
Modified SF HP Air Burst: ABR 6009 Vol 2 Chap 4 Original, June 2010
Chap 4
CHAPTER 4
HP Air Burst
TASK
UNCONTROLLED IF PRINTED
Chap 4
Table 41
No 3 ORDER BY ACTION BY SCOOW
Sound the General Alarm and pipe on Main BC "HP AIR BURST, HP AIR BURST, HP AIR BURST IN THE <COMPARTMENT>, DO NOT SHUT HP AIR VALVES V110, V112, AND V116. If the HP air burst is aft also include DO NOT ISOLATE BG3 FROM THE RINGMAIN Inform divers of incident and to commence breathing on own supply. Once divers have reported they are on own supply, Report DIVERS ON OWN AIR SUPPLY. Order "CONFIGURE EBR TO REDUNDANT AIR SUPPLY.
1. 2.
4 5 6 7 DSO-S XO
Operate LP Air Valve 5515-V265 to supply breathing air to the EBR from DABS and report to XO. Report on Main IC "EBR CONFIGURED TO REDUNDANT AIR SUPPLY.
NOTE Whilst DABS is configured to redundant air supply, divers breathing on the EBR have a limited supply. Consideration must be given to configure the HP air system to resupply the fwd ring main at the first available opportunity to allow the CTO to reconfigure DABS to normal sea line up. 8 9 10 11 12 DSO-S DSO-S XO SCOOW Crew Crew Inform divers to recommence breathing from the EBR. Once DSO-S has reported DIVERS BREATHING ON EBR, report on Main IC DIVERS BREATHING ON EBR. Pipe on Main BC "LAS, SHUT HP AIR VALVES V110, V112, AND V116. If the HP air burst is aft also include SHUTDOWN BG3 FROM THE RINGMAIN Crew to conduct ordered HP isolations and report on Main IC. Crew to conduct standard HP Air Burst EOPs in accordance with ABR 6009 Chap 13 from step 5.
UNCONTROLLED IF PRINTED
Chap 4
Table 42
No 1 4 5 6 7 ORDER BY CO XO DSO-S XO ACTION BY SCOOW DSO-S XO CTO CTO XO 8 9 DSO-S DSO-S XO
Pipe on Main IC REVERT EBR TO NORMAL SEA LINE UP Inform divers to commence breathing on own supply. Once divers have reported they are on own supply, Report on Main IC DIVERS ON OWN AIR SUPPLY. Order "CONFIGURE EBR TO NORMAL SEA LINE UP.
1. 2.
Operate LP Air Valve 5515-V265 to supply breathing air to the EBR from LP AIR and report to XO. Report on Main IC "EBR CONFIGURED TO NORMAL SEA LINE UP.
Inform divers PRIMARY AIR SUPPLY RESTORED COMMENCE BREATHING FROM EBR Once DSO-S has reported DIVERS BREATHING ON EBR, report on Main IC DIVERS BREATHING ON DABS AND EBR.
UNCONTROLLED IF PRINTED
Chap 4
BLANK PAGE