DC Leakage Hipot

This document contains test results from insulation testing on an electrical generator. A 10 kV DC voltage was applied to each winding phase for 10 minutes to determine the absorption ratio. The absorption ratio was then used to schedule a step voltage test where the voltage was incremented in steps up to 500% of the initial voltage, with time intervals recorded at each step. The test results show the elapsed time at the conclusion of each voltage step, following industry standards. Overall the document provides detailed test data to evaluate the insulation performance of the generator winding phases.

Uploaded by

LaplaceFourier
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
68 views2 pages

DC Leakage Hipot

This document contains test results from insulation testing on an electrical generator. A 10 kV DC voltage was applied to each winding phase for 10 minutes to determine the absorption ratio. The absorption ratio was then used to schedule a step voltage test where the voltage was incremented in steps up to 500% of the initial voltage, with time intervals recorded at each step. The test results show the elapsed time at the conclusion of each voltage step, following industry standards. Overall the document provides detailed test data to evaluate the insulation performance of the generator winding phases.

Uploaded by

LaplaceFourier
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Total Turbine and Generator Turnkey Service Provider

#REF!
#REF!
#REF!

ARMATURE DATA
Date(m/d/y)

Prepared by

A
10
KV DC voltage was applied to each phase with the other two phases grounded for
a period of 10 minutes to determine the absorption ratio of the winding insulation. Specific time intervals
were recorded during this initial absorption ratio, the important readings are at 1, 3.16, and 10 minutes.
The absorption ratio is then used to determine the time schedule for the step voltage test (Scheif method).
These test results using this method are the same as would be obtained by applying each step voltage level
to the winding for 10 minutes as individual tests.
Time
(Minutes)
0.50
1.00
1.50
2.00
3.00
3.16
4.00
5.00
6.00
7.00
8.00
9.00
10.00
PI
N
% of
10 KV
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420

Left
Time
10'
13'14"
15'56"
18'17"
20'24"
22'19"
24'4"
25'42"
27'12"
28'37"
29'57"
31'12"
32'23"
33'31"
34'35"
35'36"
36'35"
HIPOT

Left
mA

Center
mA

Megohm

Right
mA

Megohm

Winding
Temp (C)

Megohm

Barometric
Pressure

Relative
Humidity

Center
Time
10'
13'14"
15'56"
18'17"
20'24"
22'19"
24'4"
25'42"
27'12"
28'37"
29'57"
31'12"
32'23"
33'31"
34'35"
35'36"
36'35"
HIPOT

mA

KV
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
41

mA

KV
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
41

Right
Time
10'
13'14"
15'56"
18'17"
20'24"
22'19"
24'4"
25'42"
27'12"
28'37"
29'57"
31'12"
32'23"
33'31"
34'35"
35'36"
36'35"
HIPOT

KV
10
12
14
16
18
20
22
24
26
28
30
32
34
36
38
40
42
41

mA

Armature Data
Date(m/d/y)

Prepared by
Generator Serial No.

#REF!

DC Leakage Test
1.00
0.90
M
i
c
r
o

0.80
0.70
0.60
0.50

A 0.40
m 0.30
p
s 0.20
0.10
0.00

10

15

20

25

30

35

40

45

KV
Left

Corporate Office:
858 Acid Mine Rd.
Sullivan, MO 63080
Phone: (573) 468-4045
Fax: (573) 468-9045

Center

www.reliableturbine.com

Right

Branch Office:
1502 Gault Rd.
Houston, TX 77039
Phone: (281) 557-0103
Fax: (832) 645-5759

Total Turbine and Generator Turnkey Service Provider

#REF!
#REF!
DC LEAKAGE TEST
ABSORPTION RATIO "N" - PER IEEE 95 TABLE A1
ELAPSED TIME AT THE CONCLUSION
OF EACH VOLTAGE STEP

Voltage %
of First
Step
100
120
140
160
180
200
220
240
260
280
300
320
340
360
380
400
420
440
460
480
500
520

NOTES:

N
2

10

11

12

13

14

15

16

20

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

10'00"

13'14"

13'27"

13'31"

13'44"

13'49

13'54"

13'58"

14'20"

14'5"

14'8"

14'10"

14'13"

14'15"

14'17"

14'19"

14'25"

15'56"
18'17"

16'21"
18'55"

16'39"
19'21"

16'53"
19'42"

17'40"
19'59"

17'14"
20'13"

17'2"
20'25"

17'30"
20'36"

17'36"
20'46"

17'42"
20'54"

17'47"
21'2"

17'52"
21'9"

17'56"
21'16"

18'0"
21'22"

18'4"
21'28"

18'17"
21'48"

20'23"

21'12"

21'47"

22'14"

22'37"

22'56"

23'12"

23'26"

23'39"

23'51"

24'1"

24'11"

24'20"

24'29"

24'36"

25'3"

22'19"

23'18"

24'00"

24'33"

25'20"

25'25"

25'46"

26'40"

26'20"

26'34"

26'48"

27'0"

27'11"

27'22"

27'32"

28'5"

24'04"

25'14"

26'50"

26'43"

27'17"

27'45"

28'09"

28'31"

28'50"

29'7"

29'23"

29'38"

29'52"

30'4"

30'16"

30'57"

25'41"

27'1"

27'59"

28'44"

29'23"

29'55"

30'24"

30'49"

31'11"

31'31"

31'50"

32'7"

32'23"

32'38"

32'51"

33'39"

27'12"

28'41"

29'47"

30'45"

31'21"

31'58"

32'30"

32'59"

33'24"

33'47"

34'8"

34'28"

34'46"

35'3"

35'19"

36'13"

28'37"

30'15"

31'28"

32'25"

33'13"

33'54"

34'30"

35'20"

35'30"

35'56"

36'20"

36'42"

37'2"

37'21"

37'39"

38'41"

29'57"

31'44"

33'3"

34'7"

34'59"

35'44"

36'24"

36'59"

37'31"

37'59"

38'26"

38'50"

39'12"

39'33"

39'53"

41'1"

31'12"

33'8"

34'34"

35'43"

36'40"

37'29"

38'12"

38'51"

39'25"

39'57"

40'26"

40'52"

41'17"

41'40"

42'2"

43'17"

32'23"

34'27"

36'0"

37'14"

38'16"

39'9"

39'56"

40'38"

41'15"

41'49"

42'21"

42'49"

43'16"

43'41"

44'5"

45'27"

33'31"

35'43"

37'22"

38'41"

39'48"

40'45"

41'35"

42'20"

43'0"

43'37"

44'11"

44'42"

45'11"

45'38"

46'4"

47'32"

34'35"

36'55"

38'40"

40'5"

41'16"

42'17"

43'11"

43'58"

44'42"

45'21"

45'57"

46'31"

47'2"

47'31"

47'58"

49'33"

35'36"

38'4"

39'55"

41'25"

42'40"

43'45"

44'42"

45'33"

46'19"

47'1"

47'40"

48'16"

48'49"

49'20"

49'49"

51'30"

36'35"

39'10"

41'7"

42'42"

44'2"

45'10"

46'11"

47'5"

47'53"

48"38"

49'19"

49'57"

50'32"

51'5"

51'36"

53'24"

37'31"

40'14"

42'17"

43'56"

45'20"

46'32"

47'36"

48'33"

49'24"

50'11"

50'55"

51'35"

52'12"

52'47"

53'20"

55'14"

38'25"

41'15"

43'23"

45'8"

46'35"

47'51"

48'58"

49'58"

50'52"

51'42"

52'28"

53'10"

53'49"

54'26"

55'1"

57'1"

39'17"

42'14"

44'28"

46'17"

47'48"

49'8"

50'18"

51'21"

52'18"

53'10"

53'58"

54'42"

55'23"

56'2"

56'38"

58'45"

40'8"

43'11"

45'30"

47'23"

48'59"

50'22"

51'35"

52'41"

53'41"

54'35"

55'25"

56'11"

56'55"

57'36"

58'14

60'27"

40'56"

44'6"

46'30"

48'28"

50'8"

51'34"

52'51"

53'59"

55'1"

55'58"

56'50"

57'39"

58'24"

59'6"

59'46"

62'6"

Time at end of first step = 10 minutes


Voltage increment = 20% of first step

Corporate Office:
858 Acid Mine Rd.
Sullivan, MO 63080
Phone: (573) 468-4045
Fax: (573) 468-9045

www.reliableturbine.com

Branch Office:
1502 Gault Rd.
Houston, TX 77039
Phone: (281) 557-0103
Fax: (832) 645-5759

You might also like