Tenora Hotel - Design Review Report: A. Air Conditioning
Tenora Hotel - Design Review Report: A. Air Conditioning
Date: 24.08.2014
Please find the following details if available from the design consultant would assist us in
executing the project, which is not part of the document provided to us.
A. Air co!itioi"
I Design calculations
a. Heat load calculations for the project.
b. Pressure drop/Flow rate calculations
i. AHU's
ii. FAHU's
iii. Chw Pups
i!. FCU's
!. Fans
c. "obb# pressuri$ation s#ste appears incoplete %& ' ( not included.). "obb#
depressuri$ation s#ste not included on riser diagra.
d. *taircase pressuri$ation s#ste appears incoplete %& ' ( not included.)
II. Fire strateg# atri+ for A/C s#ste details not pro!ided.
III. ,-* roo ./C re0uireents calculations and docuents.
I1. (2*/H32* re0uireent for A/c s#ste controls
1. An# acoustic stud# reports or an# other reports.
1I. /perators Hotel roo standards.
#. $ire %i"&ti"
4. DCD ./C Coents list on Fire fighting not ipleented. Drg ref5 CD ./C 6 &6774
a. Point no.8 9:et fans are not allowed to be used in building;. <hereas &rd floor
!entilation la#out shows jet fans s#ste= re!ised design would be re0uired.
b. Point no.> 9Increase nuber of H3C in t#pical floors not less than three;. As per
*cheatic riser diagra FF674? this coent is not addressed as it shows onl# 8 nos
H3C in each t#pical floor= re!ised design is re0uired.
c. Point no.@ 9Proper pup roo si$e and appropriate !entilation and e+haust routing
shall be coplied; In our opinion this coent is not coplied and pup roo appears
too tight.
d. Point no 48. 9Pro!ide fire fighting scheatic arrangeent as shown in U.A., fire code
re0uireents.; .ot pro!ided to us.
e. Point no 4A. 9Pro!ide wet cheical fire e+tinguishers for all the BitchensC. .ot
included in fire fighting drawing.
f. Point no 84. 9Central gas tanB distances as per UA, code chapter 44 D .FPA >ED>@ ;
to be confired.
8. Pressure h#draulic calculations for firefighting pup re0uired.
F. <ater tanB capacit# as per ph#sical diensions short of water reser!e than re0uired
please see coent in water suppl# section.
F. .o design inforation pro!ided for speciali$ed fire protection s#ste such as
Preaction= Deluge= F2 877= wet cheical= clean agent= Foa s#ste pro!ided.
'. Draia"e:
All drawings a!ailable e+cept design calculations for sup pup= sup pit and holding
tanB una!ailable.
D. Water ()**+,
a. <ater tanB capacit# noted in drawing 484>77 U*&= Doestic G A4>77 U*& D
Fire reser!e G A7777 U*& not achie!able as per ph#sical diensions shown in
P84? <ater -anB and Pup roo detail.
A!ailable capacit# as per ph#sical diensions G FAE cu. or HA4?7 U*& which
is 8>FF7 U*& short of re0uired capacit#.
b. (ooster/-ransfer pup flow rate and pressure h#draulic calculations to be
pro!ided.
c. <ater le!el sensor for underground tanB and water le!el tube for //H tanB not
indicated.
d. Doestic water tanB capacit# breaBup schedule for indi!idual spaces to be
pro!ided as per D,<A standards.
e. Hot water capacit# calculations to be pro!ided for all areas including Bitchen
ser!ice roos.
E. LPG
a. ,0uipent capacit# schedule for all "P& operated e0uipents.
b. "P& tanB calculations.
$. S*ecia+ (,(te-( !e(i" i% a, ot (&o. i !ra.i"(.
a. "aundr# e0uipents.
b. *tea/(oiler re0uireents.
c. &arbage collection capacit#/Copactor design
d. "inen chute s#ste