Earned Value Management Tutorial
Earned Value Management Tutorial
More Elaborately:
o Earn Value Management (EVM) technique used to track the Progress and
Status of a Project & Forcast the likely future performance of the Project.
o EVM technique integrates the scope , schedule and cost of a project.
o EVM technique answers a lot of questions to the stakeholders in a project
related to the performance of the project.
o EVM technique can be used to show past performance of the project,
current performance of the project and predict the future performance of the
project by use of statistical techniques.
Good planning coupled with effective use of the EVM technique will
reduce a large amount of issues arising out of schedule and cost
overruns.
In the late 1980s and early 1990s, EVM emerged as a project management
methodology to be understood and used by managers and executives, not just EVM
specialists. Today EVM has become an essential part of every project tracking.
All the three elements are captured on a regular basis as of a reporting date.
This is also referred to as Actual Cost of Work Performed (ACWP). Actual Cost (AC)
or ACWP is the total cost taken to complete the work as of a reproting date.
This is also referred to as Budgeted Cost of Work Performed (BCWP). Earned Value
(EV) or BCWP is the total cost of the work completed/performed as of a reporting
date.
All these three elements can be derived from Work Breakdown Structure by
associating the costs to each of the tasks. For a big project it will be a
tedious task to calculate these elements manually. Scheduling Softwares
like Microsoft Project is used to calculate these three elements.
% Completed Planned
The percentage of work which was planned to be completed by the Reporting Date.
This is calculated using the following formula
% Completed Actual
The percentage of work which was actually completed by the Reporting Date. This is
calculated using the following formula
Cost Variance (CV) is very important factor to measure project performance. Cost
Variance (CV) indicates how much over or under budget the project is.
OR
• The formula mentioned above gives the variance in terms of cost which will
indicate how less or more cost has been to complete the work as of date.
• Positive Cost Variance Indicates the project is under budget
• Negative Cost Variance Indicates the project is over budget
Cost Variance %
Cost Variance % indicates how much over or under budget the project is in terms of
percentage.
OR
CV % = CV / BCWP
• The formula mentioned above gives the variance in terms of percentage which
will indicate how much less or more money has been used to complete the work
as planned in terms of percentage.
• Positive Variance % indicates % under Budget.
• Negative Variance % indicates % over Budget.
Cost Performance Indicator is an index showing the efficiency of the utilization of the
resources on the project. Cost Performance Indicator can be calculated using the
following formula:
OR
• The formula mentioned above gives the efficiency of the utilization of the
resources allocated to the project.
• CPI value above 1 indicates efficiency in utilizing the resources allocated to the
project is good.
• CPI value below 1 indicates efficiency in utilizing the resources allocated to the
project is not good.
OR
Schedule Variance
Schedule Variance indicates how much ahead or behind schedule the project is.
OR
• The formula mentioned above gives the variance in terms of cost which will
indicate how much cost of the work is yet to be completed as per schedule or
how much cost of work has been completed over and above the scheduled
cost.
• Positive Schedule Variance Indicates we are ahead of schedule
• Negative Schedule Variance Indicates we are behind of schedule
Schedule Variance %
Schedule Variance % indicates how much ahead or behind schedule the project is in
terms of percentage.
OR
SV % = SV / BCWS
• The formula mentioned above gives the variance in terms of percentage which
will indicate how much percentage of work is yet to be completed as per
schedule or how much percentage of work has been completed over and above
the scheduled cost
• Positive Variance % indicates % ahead of schedule.
• Negative Variance % indicates % behind of schedule.
Schedule Performance Indicator is an index showing the efficiency of the time utilized
on the project. Schedule Performance Indicator can be calculated using the following
formula:
SPI = Earned Value (EV) /Planned Value (PV)
OR
• The formula mentioned above gives the efficiency of the project team in utilizing
the time allocated for the project.
• SPI value above 1 indicates project team is very efficient in utilizing the time
allocated to the project.
• SPI value below 1 indicates project team is less efficient in utilizing the time
allocated to the project.
OR
• The formula mentioned above gives the efficiency at which the project team
should utilize the remaining time allocated for the project.
• TSPI value above 1 indicates project team can be lenient in utilizing the
remaining time allocated to the project.
• TSPI value below 1 indicates project team needs to work harder in utilizing the
remaining time allocated to the project.
• Estimate At Completion (EAC) is the estimated cost of the project at the end of
the project.
• There are three methods to calcualte EAC
o Variances are Typical - This method is used when the variances at the
current stage are typical and are not expected to occure in the future.
o Past Estimating Assumptions are not valid - This method is used
when the past estimating assumptions are not valid and fresh estimates
are applied to the project.
o Variances will be present in the future - This method is used when
the assumption is that the current variances will be continue to be
present in the future.
• The formula for calculation of the three methods are as given below:
o AC + ( BAC -EV )
o AC + ETC ( Estimate to complete )
o AC + ( BAC- EV ) / CPI
Variance At completion (VAC) is the variance on the total budget at the end of the
project.
This is the difference between what the project was originally expected
(baselined) to cost, versus what the it is now expected to cost.
% Completed Planned
The percentage of work which was planned to be completed by the Reporting Date.
This is calculated using the following formula
% Completed Actual
The percentage of work which was actually completed by the Reporting Date. This is
calculated using the following formula