ZHAOYANGGEOTECHNICPTELTD
Head Office : Zhao Yang Geotechnic Pte Ltd
No. 31 Mandai Estate #02-01, Innovation Place,
Singapore 729933
Tel: (65) 6861 8488 Fax: (65) 6898 4160
Malaysia Office : Zhao Yang Geotechnic Sdn Bhd
Suite 05 02, 5th Floor, Wisma TKS,
No. 518A 3rd Mile, Jalan Ipoh ,
51200 Kuala Lumpur
Tel: +603 4040 3133
Website:www.zhaoyang.com.sg
Email:[email protected]
Branch Office : Zhao Yang Geotechnic Sdn Bhd
No.63A, Jalan Molek 3/10, Taman
Molek Johor Bahru 81100, Johor.
Tel/Fax:+607 3513364
31
ZHAO YANG GEOTECHNIC PTE LTD - Provides ONESTOP SOLUTION FOR GROUND IMPROVEMENT &
GEOTECHNICAL ENGINEERING WORKS
Email : [email protected]
Ground improvement Works:
Wet Speed Mixing (WSM)
Deep Soil Mixing (DSM)
High Pressure Jet Grouting
Tube A Manchetta (TAM) grouting
GeoPier System (impact pier /
Grouted impact pier)
Vibro Stone Columns
Vibro Concrete Columns (VCC)
Geotechnical Engineering Works:
Rock Fissure Grouting
Chemical / Permeation
Grouting
Cavity grouting
Secant Soil Mix Pile Wall
Bored Pile Base Grouting
Compaction grouting
Double Head System (VDW)
Secant Soil Mix Pile Wall
Jet Grouting
TAM Grouting
Geopier System
Fissure Rock Grouting
Exposed Secant Soil Mix Pile
(WSM Technique)
WSM Works in Progress
Grouted Impact Pier
Bored Micro piling (Size:150-500mm dia.)
Removal Temporary / Permanent Ground
Anchor ( WL=20ton 150ton)
Toe Pin for D-wall & Bored Pile
Soil Nailing / Rock Bolting
Bored Piling / CBP Wall
VDW Secant Pile Wall
Bored Piling
Pre-Drilling Sheet Pile
Bored Micropile
Design & Built For (ERSS)
Soil Investigation
Steel / Micro Pile extraction
Pre- drill & Drive Sheet Pile /
Soldier Piles/Steel Plate lagging
Recharge & relief well
Slope Repair Technology (SRT)
Temporary Removal Ground
Anchor
Soil Nail/Rock bolt & shotcrete
Work
Soil Investigation
Driving Steel Plate/Sheet /
Soldier Pile
ERSS-Exposed Grout Pile Wall
Soil Nail & Gird RC Beam
Alternative Piling System using
WSM technique
to install
Secant Soil Mix Piles Wall.
InstallationofSecantSoilMixPilesWall
Using
WETSPEEDMIXING(WSM)Technique
WhatisWSM Technique?
WSMTechniqueusecombinationofjetgrouting&MechanicalMixingBladestomix
thesoil.
ProventechniqueabletotreatmosttypesofsoilinsingaporerangingfromverySoft
marineclay,Peatyclay,F1,F2,siltysand,clayeysand,CoarsesandandBukitTimah
graniteSoilGV&GVIuntilSPTNvalue<100N,exceptrock&obstruction.
UseHighRevolution(RPM:40~90)forSoilmixing
Assuredqualitywithuniformmixingandconsistentdiameter(rangingfrom0.6mto
2.6m).GroundImprovementMin.Shearstrength(Cu)=300Kpato1500Kpa
Provendeepesttreatmentdepth48m.
Environmentallyfriendly.
Lownoiseandvibrationfree
HighProductivityanduselessmanpower
Costeffective
SequenceofInstallation
SetupGuideWall&WSM
installationinProgress
InstallationofIBeamimmediately
uponcompletionofWSM
TYPE(1)WSM(WITHOUTSIDENOZZLESJETTING)
I-Beam
Ground Level
Marine Clay Layer
Sand Layer
F1, F2, Bukit Timah
GV,GVi layer, SPT N
value < 100
Rock Layer
Step 1:
Position the
ABI rig on
the WSM
peg point
Step 2 :
Drilling and
mixing of WSM
column in the
ground with
cement
Step 3 :
Withdraw the WSM
rod and mixing
monitor to complete
the grouting
Step 4 :
Completed WSM
point
Step 5 :
Install I-Beam to
required depth
TYPE(2)WSM(WITHSIDENOZZLESJETTING)))
I-Beam
Ground Level
Marine Clay Layer
Jetting
Jetting
Sand Layer
Jetting
F1, F2, Bukit
Timah GV,GIV
layer, SPT N value
< 100N
Rock Layer
Step 1:
Position the
drill rig on
the WSM peg
point
Step 2 :
Drilling and mixing
WSM column in the
ground with cement
Step 3 :
Withdraw the WSM
rod and mixing
monitor to complete
the grouting
Step 4 :
Completed
WSM point
Step 5 :
Install I-Beam to
required depth
AdvantageofusingWSMMethodfor
ERSS
Proven WSM Free Standing Wall
for One Basement construction
Part One
Earthretainingstructuresystem(ERSS)
(OneBasementConstruction)
BeforetrimmingSecantSoilmix
Piles. (FREEstandingwall3.5m~4.0mheight)
AftertrimmingSecantSoilMix
Piles.
Earthretainingstructuresystem(ERSS)
(OneBasementConstruction)
AftertrimmingSecantSoilMix
piles
CastinsituPermanentretaining
wallwithSecantSoilMixPiles.
Earthretainingstructuresystem(ERSS)
(OneBasementConstruction)
FreeStandingWallusingWSM
technique(reclaimsand&marine
claylayers)
FreeStandingWallusingWSM
technique(reclaimsand&marine
Claylayers)
Earthretainingstructuresystem(ERSS)
(OneBasementConstruction)
FreeStandingWallusingWSM
technique(BukitTimahGraniteGV
&GVISoil)
FreeStandingWallusingWSM
technique(BukitTimahGraniteGV
&GVISoil)
AdvantageusingWSMMethodfor
ERSS
TOPDOWNBASEMENTCONSTRUCTION
METHODUSINGSECANTSOILMIXPILE
WALLSYSTEM
(PARTTWO)
WetSpeedMixing(WSM)
Technique
Guidewallforsecantsoilmixpiles
installation
SoilMixinginProgress
WetSpeedMixing(WSM)Technique
InstallationofHpileimmediatelyafter
completionofwsm
Preparationofcappingbeamslabfortop
downconstruction
Earthretainingstructuresystem(ERSS)
(TwoBasementConstruction)
SecantsoilmixPileswall
beforetrimming
Secantsoilmixpileswallafter
trimmingatbasementlevel
one
Earthretainingstructuresystem(ERSS)
(TwoBasementConstruction)
Basementlevelone
Openingatlevelone
Earthretainingstructuresystem(ERSS)
(TwoBasementConstruction)
Topdownconstruction
Basementleveloneslabcast
ExposedWSMgroundimprovement
atbasementleveltwo
Earthretainingstructuresystem(ERSS)
(TwoBasementConstruction)
Trimmedsecantsoilmixwall
atbasementleveltwo
TrimmedandexposedIbeam
atbasementleveltwo
Earthretainingstructuresystem(ERSS)
(Max.excavationdepth:14to18mforBasementConstruction)
SecantSoilMixPileWallwithmulti
layersstrut(DTL1 C906)
ConnerSecantSoilMixPilesWallwith
multilayersstrut(DTL1 C906)
Earthretainingstructuresystem(ERSS)
(Max.excavationdepth:12mforBasementConstruction)
DTL1C907(ERSSWallabove
existingMRTNSLtunnel)
DTL1C907(ERSSWallabove
existingMRTNSLtunnel)
Entrance Shaft Construction
Beside old Shop house
Oval Shaft Construction using Secant Soil
Mix Pile Wall
DATA LOGGER WSM
RealtimeMonitoring DataLoggerattached.
Drilling Depth
Grout Pressure
Grout Flow rate
Grout Period (min)
Rotation Speed
Grout Volume
For every meter
depth
SAMPLE TESTING FOR WSM
ReportNo CoringPointNo
CastDate
CoringDate LabTestDate SampleNo
TCR%
1000
5738
150
1017
100
4703
2629
3383
1059
4439
5520
6163
5745
400
436
680
608
548
717
1225
1131
3341
4397
4472
418
605
350
4458
2433
450
487
3178
421
CR1
C139
23/10/2012
4/1/2013
7/1/2013
C113
24/10/2012
8/1/2013
12/1/2013
C76
29/10/2012
10/1/2013
12/1/2013
C53
1/11/2012
15/1/2013
19/1/2013
CR1
CR2
CR3
96
C34
31/10/2012
17/1/2013
19/1/2013
CR1
CR2
CR3
95
Before Test
ElasticModulus,
E(Mpa)
85
1
CR2
CR3
CR1
CR2
CR3
CR1
CR2
CR3
UnconfinedComp.
Strength,qu(kPa)
94
99
After Test
Result of coring sample
testing
ZHAOYANGGEOTECHNICPTELTD
Proven Projects Track Record
Using Wet Speed Mixing
(WSM) Technique
in SINGAPORE
PROJECT
WORKSCOPE
MAINCONTRACTOR
DTL 1 C 902
Ground Improvement Work using WSM (TBM Launching Shaft)
Shanghai Tunnel Engineering
Pte Ltd
DTL 1 C 906
Secant Soil Mix Pile Wall using WSM
Sembawang E & C Pte Ltd
DTL 1 C 907
Secant Soil Mix Pile Wall using WSM
Taisei Corporation
DTL 2 C 916
Ground Improvement Work using WSM(TBM Launching &
arrival Shaft)
McConell Dowell SEA
DTL 2 C 917
Ground Improvement Work using WSM ( TBM Launching &
Arrival Shaft)
Alpine Bau GMbh
DTL 2 C 918
Ground Improvement Work using WSM ( Cut & Cover tunnel &
TBM launch & arrival Shaft)
Alpine Bau GMbh
DTL 2 C 919
Ground Improvement Work using WSM (TBM Launching Shaft)
Sembawang E & C Pte Ltd
DTL 2 C 921
Ground Improvement Work using WSM ( Entrance Shaft )
Ssangyong E & C Pte Ltd
DTL 3 C 927
Ground Improvement Work using WSM (TBM Launching &
arrival Shaft)
CMC Ravenna
DTL 3 C 932
Ground Improvement Work using WSM ( Escape Shaft and
TBM Launching & arrival Shaft)
Sato Kogyo (S) Pte Ltd
DTL 3 C 935
Ground Improvement Work using WSM ( Station, Entrances &
TBM Launch Shaft )
Leighton-John Holland JV
MCE C 482
Ground Improvement Work using WSM ( Cut & Cover tunnel &
Pipe Piles Gap Sealing )
Ssangyong E & C Pte Ltd
MCE C 483
Ground Improvement Work using WSM ( Pipe jacking shaft )
Samsung C & T Corporation
MCE C 487
Ground Improvement Work using WSM ( Cut & Cover Tunnel )
Daelim Industrial Co. Ltd
PROJECT
WORKSCOPE
MAINCONTRACTOR
OWNER
Punggol Waterway
(Part 1)
Ground Improvement works ( GIW ) using WSM
KOH Brothers C & E
HDB
Punggol East Contract 39
GIW - using WSM for Driveway
Sunhuan Construction PL
HDB
Punggol East Contract 40
GIW - using WSM for Driveway &
Promenade
Sunhuan Construction PL
HDB
Punggol East Contract 41
GIW - using WSM for Driveway
Sunhuan Construction PL
HDB
Kallang Whampoa
Contract 20C
Punggol East Contract 36
GIW - using WSM for Driveway
Sembawang E & C PL
HDB
GIW - Using WSM for Driveway
Sunhuan Construction PL
HDB
Jardin Condominium
Secant Soil Mix Pile Wall using WSM
Rich Construction PL
Private
No. 2 & 4 East Coast
Avenue
Secant Soil Mix Pile Wall using WSM
Expand Construction PL
Private
The Cape No. 25 Amber
Road
Secant Soil Mix Pile Wall and
Basement GIW - using WSM
Rich Construction PL
Private
CMC No. 597 East Coast
Road
Ground Improvement Work using WSM
Daiya Engineering &
Construction PL
Private
Lorong 33 Geylang
Basement GIW - using WSM
Admin Construction PL
Private
Centropod at 80 Changi
Road
Basement GIW - using WSM
Lim Wen Heng Construction PL
Private
Natura @ Hillview
Secant Soil Mix Pile Wall using WSM
Lim Wen Heng Construction PL
Private
NUS Project
Secant Soil Mix Pile using WSM
Expand Construction PL
Private
HDB @ Sembawang Rd
N5C18
Secant Soil Mix Pile using WSM
Yau Le Construction (S) Pte Ltd
HDB
THANK YOU