PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS
DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
DESCRIPTION OF JOB :
Plastering Activity
JSA NO :
PREPARED BY :
Mohd Firdaus Bin Kamaruddin
REV : 00
APPROVED BY: Ching Soon Seng (PM)
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)
PAGE : 01
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
CURRENT RISK CONTROL
Hazard/Effect
1 Basic Hand Tools
Not approve for use
Conform inspect and approve
type only
RISK RANKING
PROPOSED RISK CONTROL
LEVEL
Job sequence /steps
COSEQUENCE (B)
NO
RISK ASSESSMENT
PROBABILITY (A)
HAZARD INDENTICATION
SCORE
LOCATION :
Disallow and remove
Work supervisor to make a final
check on all intended tools to be
used and comply with safety
requirement and standrad
Competent person only allow
to operate
Use or operate tools by trained /
competent person only
Handle with care and wear
correct type of PPE
Conduct TBT with the groups
prior to start
Always keep in proper storage
eg box , container or hand pack
Work area to display signances to
warn or inform
Damage parts attach with modification parts
Incompetent user
Drop and damage tools
Wrong use for it purpose
Malfunction while in use
Tools after use to place back to
where it kept .avoid expose to
wheather conditon
conduct visual check before
issue to use
Do not force to use if found
malfunction
RESPONSIBILITY
PE
Safety supervisor
site supervisor
PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS
DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
DESCRIPTION OF JOB :
Plastering Activity
PREPARED BY :
Mohd Firdaus Bin Kamaruddin
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)
APPROVED BY: Ching Soon Seng (PM)
JSA NO :
REV : 00
PAGE : 02
LOCATION :
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
Used approved type safety shoe.
Housekeeping & material arrangement.
Standing supervision.
Put barricade & signage
crushed by equipment
Experianced/licensed operator.
Not allowed workers underneath during
Provide signalman to controll
lifting & provide tag line.
Provide signalman.
Standing supervision.
PROPOSED RISK CONTROL
LEVEL
CURRENT RISK CONTROL
Hazard/Effect
SCORE
Trip & falls
Job sequence /steps
2 Loading / Unloading
cement bag.
RISK RANKING
COSEQUENCE (B)
NO
RISK ASSESSMENT
PROBABILITY (A)
HAZARD INDENTICATION
RESPONSIBILITY
PE
Site Engineer
Site supervisor
lifting.
Lorry crane / Crane topple
Experianced / licensed operator.
Attach steel plate at crane outrigger
Ground condition inspection.
Fail of lifting gear
Used the right lifting gear & ensure that
lifting gear capable to take the load.
Do lifting gear inspection & colour code
Provide lifting gear testing certificate.
Site safety supervisor
PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS
DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
DESCRIPTION OF JOB :
Plastering Activity
REV : 00
RISK ASSESSMENT
PROPOSED RISK CONTROL
LEVEL
RISK RANKING
SCORE
CURRENT RISK CONTROL
Hazard/Effect
COSEQUENCE (B)
Job sequence /steps
PAGE : 03
PROBABILITY (A)
HAZARD INDENTICATION
NO
APPROVED BY: Ching Soon Seng (PM)
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
LOCATION :
JSA NO :
PREPARED BY :
Mohd Firdaus Bin Kamaruddin
3 Mortar mix
RESPONSIBILITY
PE
Splashing mortar into eye
Conduct daily toolbox talk
conduct by site supervisor
Wear safety glasses when
working with wet concrete.
Safety Supervisor
Concrete burns
4 Transfer mortar.
using wheel barrows
Back Pain
Trip & falls
Using gloves when working with
working with wet concrete
wash off any excess concrete
from your skin as soon as
possible.
Not carry overlimit load.
Rotate workers when handle the
manual handling ( Buddy system )
Used approved type safety shoe.
Housekeeping & material arrangement.
Provide safe access or ramps for wheel
Barrows
Site supervisor
PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS
DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
DESCRIPTION OF JOB :
Plastering Activity
REV : 00
RISK ASSESSMENT
Wear safety glasses when
working with wet concrete.
Using gloves when working with
working with wet concrete
wash off any excess concrete
from your skin as soon as
possible.
Not carry overlimit load.
Rotate workers when handle the
manual handling ( Buddy system )
Used approved type safety shoe.
Housekeeping & material arrangement.
Provide safe access
clear all obstruction
To provide water water dispenser at site
Provide rest shelter to workers.
PROPOSED RISK CONTROL
LEVEL
SCORE
Conduct daily toolbox talk
conduct by site supervisor
CURRENT RISK CONTROL
Hazard/Effect
5 Perform plastering
work.
RISK RANKING
COSEQUENCE (B)
Job sequence /steps
PAGE : 04
PROBABILITY (A)
HAZARD INDENTICATION
NO
APPROVED BY: Ching Soon Seng (PM)
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
LOCATION :
JSA NO :
PREPARED BY :
Mohd Firdaus Bin Kamaruddin
RESPONSIBILITY
PE
Splashing mortar into eye
Safety Supervisor
Concrete burns
Back / Arm Pain
Trip & falls
Heat Stress
Site supervisor
PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS
DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
DESCRIPTION OF JOB :
Plastering Activity
PREPARED BY :
Mohd Firdaus Bin Kamaruddin
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)
APPROVED BY: Ching Soon Seng (PM)
JSA NO :
REV : 00
PAGE : 05
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
Training workers for working at height.
Wear full body harness with large hook.
Provide safe working platform.
Provide lifelines / hook point.
housekeeping and material arrangement
Scaffolding must have toe board.
Provide boxes for loose item.
Barricade work area.
Solid & firm foundation to erect scaffolding
Used approved type of scaffolding
Inspection carry out by competant
person
CURRENT RISK CONTROL
Hazard/Effect
6 Perform plastering activity
at height using scaffolding
PROPOSED RISK CONTROL
LEVEL
Job sequence /steps
RISK RANKING
COSEQUENCE (B)
NO
RISK ASSESSMENT
PROBABILITY (A)
HAZARD INDENTICATION
SCORE
LOCATION :
RESPONSIBILITY
PE
Trip & falls
Used approved type safety shoe.
Housekeeping & material arrangement.
Provide safe access
clear all obstruction
Site Engineer
Site Supervisor
Falling from height
Material falling from height
Scaffolding collapse
PROJECT : CADANGAN MEMBINA SEBUAH DEPOH BAS
DAN KEMUDAHAN SOKONGAN BERKAITAN BAGI PROJEK MASS RAPID
TRANSIT LEMBAH KLANG ,JAJARAN SUNGAI BULOHKAJANG DIATAS LOT 81520
SELUAS 10.55 EKAR SEKSYEN U4,40150 SHAH ALAM SELANGOR DARUL EHSAN
DESCRIPTION OF JOB :
Plastering Activity
REV : 00
LEGAL AND OTHER REQUIREMENTS : OSHA 1994 SECTION 15(2)
(a) (b) (c) ,FMA section 10,26 shw reg 32 bowec Reg 8,9
CURRENT RISK CONTROL
Hazard/Effect
7 General housekeeping
issues
RISK RANKING
PROPOSED RISK CONTROL
LEVEL
Job sequence /steps
RISK ASSESSMENT
COSEQUENCE (B)
NO
PAGE : 06
PROBABILITY (A)
HAZARD INDENTICATION
APPROVED BY: Ching Soon Seng (PM)
SCORE
LOCATION :
JSA NO :
PREPARED BY :
Mohd Firdaus Bin Kamaruddin
RESPONSIBILITY
PE
slip ,trip & fall
Keep Floor clean and debris free
conduct daily tool box talk
Site Suoervisor
Safety Supervisor
Cuts/ punctures
Back injury
Do not put hand in trash cans pick up plastics bags from the
edges
use hand gloves for the
protection
use proper body posture
use safety lifiting techniques
Risk Rating
IMPACT SEVERITY
IMPACT CATEGORY
RISK AREA
Financial
2
Minor
3
Moderate
Less than Rm 50 k RM 50 K to RM 250 K RM 250 K- RM 1.0 K
First aid required
Medical treatment
required
Safety
None
Programme
Less than one week
1-4 Weeks
1-3 months
Negligible damage
Minor damage
some repairs
required
Moderate to high
damage requires
specialist to repair
Third party impact
LIKEHOOD
1
Minimal
4
Major
5
Severe
RM 1.0m to RM 10m
Greater than Rm 10 m
serious injury
a fatality case
3-6 months
greater than 6 months
Significant/permanent
widespread subtantial
damage
/permanent damage
Almost certain -happen frequenly (more than 10
times within the project
very likely -could happen frequenly (more than 3
times within the project
Likely-could happen occasionly (less than 3 times
within the project
Unlikely- could happen rarely (1 times within the
project
Very unlikely- probablilty will not happen (has never
occurred)