Update of Qa/Qc Procedure: Construction Maintenance Service at Handil/Cpa Contract No: 460004730

This document provides an update to quality assurance and quality control procedures for construction maintenance services at Handil/CPA from 2016 to 2019. It lists 13 procedures related to project quality plans, inspection and testing plans, material handling, production control, bolt tightening, blasting and painting, specific repairs, non-destructive testing, electrode handling, hydrostatic testing, post-weld heat treatment, welding procedure specifications, and welding maps and testing plans. Each procedure is identified by a document number, title, status, revision number, and dates of submittal for review and approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
30 views1 page

Update of Qa/Qc Procedure: Construction Maintenance Service at Handil/Cpa Contract No: 460004730

This document provides an update to quality assurance and quality control procedures for construction maintenance services at Handil/CPA from 2016 to 2019. It lists 13 procedures related to project quality plans, inspection and testing plans, material handling, production control, bolt tightening, blasting and painting, specific repairs, non-destructive testing, electrode handling, hydrostatic testing, post-weld heat treatment, welding procedure specifications, and welding maps and testing plans. Each procedure is identified by a document number, title, status, revision number, and dates of submittal for review and approval.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

CONSTRUCTION MAINTENANCE SERVICE AT HANDIL/CPA

Contract No : 460004730

UPDATE OF QA/QC PROCEDURE


PERIODE 2016 - 2019
DOCUMENT STATUS :

DOC. CLASS :

TOTAL COMMENTS :

A = Issued for Comment

1 = For Action

TBR = To Be Resubmitted

AP

B = Issued for Approval

2 = For Information

RC

GFC = Good For Construction

C = Approved for Construction

= Review With Comment

APC = Approved With Comment

= Rejected

STATUS
DOC. FR
PJC-BPN

PTM/01/QA/CMS/PQP/16

Project quality plan

PTM/02/QA/CMS/ITP/16

Inspection and test plan

PTM/2/QA/CMS/MHP/16

Material handling procedure

24-Jun-16

PTM/3/QA/CMS/CP/16

Control of production or servie Procedure

PTM/4/QA/CMS/BTP/16

Bolt tightening procedure

22-Jun-16

PTM/5/QA/CMS/BP/16

Blasting and paiting procedure

13-Jul-16

PTM/5A/QA/CMS/ITPBP/16

ITP Blasting and paiting procedure

29-Jun-16

PTM/06/QA/CMS/SRP/16

Specific Repair Procedure

NDT Procedure

22-Jun-16

NO

1
2

5
6
7

DOCUMENT NO.

PTM/07/QA/CMS/NDT/16

DOCUMENT TITLE

STA

REV

TOTAL EPI COMMENTS

CLASS

SUBMIT TO TOTAL EPI


BALIKPAPAN

RJ

= Approved Without Comment

Date

TRS. No.

Date

TRS. No.

Comment

PTM/08/QA/CMS/EHP/16

Electrode handling procedure

PTM/9/QA/CMS/HTPP/16

Hydrostatic test procedure

11-Jul-16

PTM/10/QA/CMS/PWHT/16

PWHT Procedure

13-Jul-16

PTM/11/QA/CMS/WPS/16

List of WPS for structural

30-May-16

PTM/11/QA/CMS/WPSP/16

List of WPS for piping

30-May-16

12

PTM/12/QA/CMS/WLS/16

List of welder and Certificate

13

PTM/12/QA/CMS/WM/16

Welding map and NDT plan

14-Jul-16

10
11

PREPARED BY :

REVIEWED BY :

PT. PTM

TOTAL EPI

QA/QC

ECP/QSE/OPS

Page 1 of 1

REMARKS

File : E:\project dailyrate\MDR