LIST OF BUILDINGS & STRUCTURES
SR.NO.
3200 N
58
DESCRIPTION.
TG. BUILDING
STEAM GENERATOR
ESP
ESP CONTROL ROOM
CHIMNEY
TRANSFORMER YARD AREA
765kV/400kV/132kV SWITCHYARD & CONTROL ROOM
3100 N
R
/K
A
N
ha
ta
mp
ur
58
3000 N
IR
P
U
To
G
3000 N
P
U
3100 N
A
M
TOWNSHIP
2900 N
58
2800 N
G
EXISTING NALLAH
2700 N
58
2500 N
2400 N
2400 N
C
H
R
=
4
5
0
m
2500 N
2200 N
2100 N
56
2000 N
ASH POND
MAKEUP WATER FROM
RIVER WATER SYSTEM
1800 N
E
N
OV
ER UPP
RA L
PH IL
BR
-I
I
ID
G
1400 N
35
0
RAW WATER RESERVOIR
R=
58
1770.0M (W)
HW
BAFFLE
AY
1100 N
58
d
n
o
P
d
n
o
P
1000 N
V
l
au
dh
id
S
ge
la
il
e
g
a
ill
V
RAW WATER RESERVOIR
900 N
800 N
d
n
o
P
COMPARTMENT-II
m
ri
Pr
P
-N
0
0
6
2
7
8
2
800 N
54
58
PE
I
LYP
UPP
ER S
WAT
RAW
a
ri
a
g
a
B
1200 N
1100 N
1000 N
900 N
1300 N
y
ar
ly
R
LLA
NA
ng
si
ros
C
58
RL.133.00M
NALLA
58
RL.133.00M
RAIN WATER
PU
T.B.M.-20
765kV/400kV/132kV SWITCHYARD
LA
11
CLARIFIER (FOR ASH WATER SYSTEM)
12
INTERMEDIATE SURGE HOPPER (ISH)
13
FGD PLANT (FUTURE)
14
CONDENSATE STORAGE TANK & HOT WELL MAKE-UP AND BOILER FILL PUMPS
15
A.C.EQUPMENT AND GAS ROOM
16
SERVICE BUILDING
17
DRY ASH SILO
18
SILO UTILITY ROOM
19
SILO MCC ROOM
20
FUEL OIL TANK FARM AREA & LDO & HFO UNLOADING & TRANSFER PUMP HOUSE
21
NATURAL DRAFT COOLING TOWERS
22
CW PUMP HOUSE & FOREBAY
23
CHLORINATION ROOM FOR CW SYSTEM, CHEMICAL HOUSE & ACID STORAGE
24
EFFLUENT TREATMENT PLANT, GUARD POND
25
DM PLANT , BULK ACID/ ALKALI STORAGE
25a
NEUTRALIZATION PIT
26
PARKING AREA
27
CANTEEN
28
DISPENSARY
29
ADMINISTRATION BUILDING
30
FIRE STATION
31
TIME OFFICE
32
SECURITY OFFICE
33
MAIN ENTRANCE ARCH. AND GATE COMPLEX
34
WORK SHOP
35
PERMANENT STORE SHEDS (6 NOS FOR MECH.,ELECT.,C&I AND CIVIL )
36
WEIGH BRIDGE AND CONTROL ROOM FOR HEAVY VEHICLE
37
GATE #2(FOR HEAVY VEHICLES ENTRY)
38
AUXILIARY BOILER
39
CIRCULATING WATER INLET AND OUTLET PIPES
40
PERIPHERAL ROAD
41
SPACE FOR LAYDOWN AREA
42
RECLAIMER MACHINE
LINE BAY-2
LINE BAY-1
BUSCOUPLER
ICT-1
LINE BAY-3
43
MARSHALLING YARD/RAILWAY SIDING
44
WAGON TIPPLER (FOUR NUMBERS)
45
PENT HOUSE FOR CONVEYORS FROM WT (PH-1)
46
CRUSHER HOUSE
BUS TRANSFER
LINE BAY-4
ICT-2
LINE BAY-5
LINE BAY-6
ICT-3
LINE BAY-7
ST # 1
ST # 2
400 N
47
COAL PILES
ST # 3
LA
CVT
RAIL TRACK
TOWER
ROAD
3014
CT
CB
TOWER
3000
ISO
RAIL TRACK
ISO
CRP
CRP
80
400KV GIS ROOM
CRP
CRP
CRP
CRP
CRP
CRP
CRP
CRP
LINE
CRP
CRP
CRP
CRP
LINE
CRP
CRP
5000
CRP
CRP
RAI
L TRA CK
ICT
CRP
ICT
CRP
CRP
CRP
CRP
3.5M WIDE ROAD
RAI
L TRA CK
ICT
CRP
RAIL TRACK
CRP
CRP
CRP
60
CRP
CRP
CRP
CRP
CRP
CRP
RA I
L TRA CK
CRP
CRP
CRP
CRP
CRP
TRAFO.
CRP
CRP
CRP
CRP
CRP
400KV GIS ROOM
CRP
ROLLING SHUTTER
TRAFO.
RAIL TRACK
765KV GIS ROOM
132KV ROOM
RAIL TRACK
200 N
CH
RAIL TRACK
RAIL TRACK
BOUNDARY WALL
24
C 109.5 (N) OF 7.0M WIDE ROAD
L
C 7.0M WIDE ROAD
L
C CW RETURN HDR (UNIT#1)
L
FROM
0.00M
3.0M.WIDE PIPE RACK
STAIRCASE FROM
0.0M TO 33.0M (TYP.)
FROM
0.00M
3.0M.WIDE PIPE RACK
CPV
EL.3.5M
TG MAINTENANCE
BUILDING
(40M X 20M)
UNLOADING BAY
PAVED AREA
RS
REMOVABLE PLATFORM
CPV
CPV
PL.EL.5.0M
REMOVABLE PLATFORM
& HAND RAILING
FROM
0.00M
RS
3.0M.WIDE PIPE RACK
RS 5.0MWx5.0MH
LOUVERS
BATTERIES
LOUVERS
BATTERIES
BATTERIES
TOILET
EL.2.0M
LOUVERS
CPV
LIFT
C.P.U. UNIT
LUBE OIL SKID
TDBFP
FROM
0.00M
RS 5.0MWx5.0MH
LOUVERS
BATTERIES
DUPLEX LUBE
OIL COOLER
PAVED AREA
RS 3.0MWx5.0MH
TDBFP HANDLING
AREA
EL.0.0M
DOSING UNIT
EL.3.5M
OIL TANK
OIL TANK
T.B.M.-17
3.0M.WIDE PIPE RACK
C 7.0M WIDE ROAD
L
RS
23
75
28
UP
STAIRCASE FROM 0.00M
TO ROOF LEVEL
27
26
22
21
20
12
65
15
I
FROM 0.0M
UP
STAIRCASE FROM 0.00M
TO ROOF LEVEL
10
73
65
38
63
PMH-4
FD FAN
C
L
C
L
64(II)
JT-6
BC-6A/6B
136.85[S]
PA FAN
C
L
C
L
FD FAN
C
L
RL.133.00M
12
JT-8
JT-7
12
41
47.2[W ]
267.3[W ]
JT-9
8
59
9
19
FA W ATER PUM PS (4 Nos.
)
PIPE RACK
129.3[W ]
JT-10
12
185.2[W ]
JT-11
BAHP W ATER PUM PS (3 Nos.
)
LP W ATER PUM PS (4 Nos.
)
10
BOUNDARY WALL
59
18
d
n
o
P
LIME
CH-1
13
LIMESTONE
GRINDING
AREA
RL.133.00M
PMH-3B
RL.135.750M
73
DH-1B
C
LERH-1
71
50
58
51
RC-1
587.0[S]
47
SR-1B
RYBC-1B
659.0[S]
PERMANENT STORE SHEDS
BC-4A/4B
42
DH-1A
SR-1A
48
RYBC-1A
CU
T
LI
NE
3rd
C
L 7M W IDE OF ROAD
47
CRUSHED COAL STOCKPILE# CCS-2
SEMI STORE SHEDS
CHP MAINTENANCE
77
BUILDING
BUILDING
793.0[S]
RL.135.750M
49
990.0[W ]
JT-3
CRUSHED COAL STOCKPILE# CCS-1
47
RL.135.750M
58
975 S
JT-2
BC-1A/1B
42
THCR-1
ER-4
44
ER-3
ER-2
52
44
SAC-2
OUT HAUL
C
L
52WT-2
OUT HAUL
C
L
C
L HOPPER
# WT-2
44
C
L HOPPER
# WT-1
OUT HAUL
C
L
SAC-1
WT-1
RL.140.00M
MSL- 142.850
OUT HAUL
C
L
WT-4
C
L HOPPER
# WT-4
C
L HOPPER
# WT-3
SAC-3
WT-3
IN HAUL
C
L
TRACK (WT-1)
58
SAC-4
44
IN HAUL
C
L
TRACK (WT-3)
IN HAUL
C
L
TRACK (WT-2)
R
CS
ER-1
PENT HOUSE ERH (PH-2)
52
CHP CONTROL ROOM & MCC ROOM
53
HYDROGEN GENERATION PLANT
54
RAW WATER RESERVOIR
55
RAW WATER PUMP HOUSE
56
ASH POND
57
COAL PILE RUN OFF PIT
58
WATCH TOWERS
59
COMPRESSOR CUM VACUUM PUMP HOUSE FOR ASH HANDLING
(COMMON CONTROL ROOM FOR ALL THE THREE UNITS AT 2nd FLOOR IN UNIT#1 BUILDING)
60
SEWAGE TREATMENT PLANT
1200 S
530 E
N - 2872279.00
Ch
.:
20
0.
0
T.B.M. -7
Ch
.:
30
0.
0
T.
B
R
.
l
. M.
14
No.
3.
12 1
GUM
Vi
TI
l
l
.
A
ha
T
rc
hh
ua
HP
1300 S
Lahurimau
To Vill.
TO
Ch
.:
50
0.
0
1500 S
Ch
.:
60
0.
0
58
RL
Y
CH
L:K
XI
M
CL NG
13
N
AS
74
S( O.
50
UN S4
0
/
M) 5 '
C'
1600 S
Ch
.:
70
0.
0
Ch
.:
80
0.
0
1700 S
1400 S
1500 S
EX
I
S
T
I
NG
RLY.TR
ACK
SURVEY BOUNDARY
DG SET BUILDING
62
CPU REGENERATION BUILDING
63
COMPRESSOR HOUSE
iM
ar
h
La
64
BOILER MAINTENANCE BUILDING
65
PASSENGER CUM GOODS ELEVATOR
66
COMPOUND WALL
67
FENCING
68
ASH WATER RECOVERY AND RECOVERY PUMP HOUSE
69
FILTRATION PLANT, FILTER WATER RESERVOIR, FILTER WATER & FIRE WATER PUMP HOUSE
70
PIPE RACK/CABLE RACK
71
DOZER SHED
72
LOCO SHED
73
PUMP HOUSE FOR DUST SUPRESSION SYSTEM (DSS)
74
AIR WASHER UNIT
75
PASSENGER ELEVATOR
76
TG MAINTENANCE BUILDING
77
CHP MAINTENANCE BUILDING
78
SIMULATOR TRAINING CENTER
79
LABOUR COLONY
80
RAIN HARVESTING
1300 S
RLY.LA
ND
BO UND
ARY
58
1400 S
.
l
l
i
oV
T
a
hhu
c
r
ha
Dh
Cr ar
os ch
si hu
ng a
Ch
.:
40
0.
0
58
61
1100 S
UR
P
HE
AT
OF
T
52CLTUNNEL
E - 419203.00
m
718
M)
oF
rt
e
ppl
Ti
(
1000 S
e
g
a
ill
V
IN HAUL
TRACK (WT-4)
Ch
.:
10
0.
0
.
No
2.
.
82 2
C
L
RL.140.00M
43
34m
R8
CS
T.B.M.-12
OUT HAUL
C
L
WBCR-1A
52
GATE
73
JT-1
BC-1C/1D
T.
B
Rl .M
.
14
WBCR-1B
ACH-1
MSL-141.310
E - 420030
N - 2873197
M)
oF
rt
e
ppl
Ti
(
Ch
.:
0.
0
a
u
h
rc
a
h
73
1100 S
1200 S
51
PMH-2
PMH1
60 E
CRH
Kanp
ur
152 E
JT-2A
900 S
To
46
T.B.M.-13
3
1
.-
58
C
LTUNNEL
PH-1 45
BC-2A/2B
975 S
1000 S
.M
.B
T
BC2C/
2D
JT-2B
800 S
HA
M
923.00M(S)
RL.140.00M
RL.140.00M
MSL -141.785
E - 419937
N - 2873469
Vi
l
l
age
73
RL.135.750M
Li
ne
BC-3A/3B
PMH-3A
RL.135.750M
52
Rai
l
wa
y
RL.135.750M
5
ER-
900 S
700 S
INSPECTION SHED
CHP MAINTENANCE
Dh
arc
hua
793.0[S]
41
STORE SHED
JT-4
CRUSHED COAL STOCKPILE# CCS-3
EMERGENCY RECLAIM HOPPER
STORE SHED
(FOR OIL DRUMS)
(FOR GAS CYLINDER)
RL.135.750M
600 S
2nd
PERMANENT STORE SHEDS
48
800 S
35
1st
49
58
50
500 S
JT-5
PH-2
CRUSHED COAL STOCKPILE# CCS-4
659.0[S]
587.0[S]
CU
T
LI
NE
EX
IS
T
RL ING
.1
41 TRA
.0
0M CK
57
T.B.M. -2
530.00M(S)
KA
NP
UR
N -2871992.12
20
C LDO
L
TANK #1
RL.133.00M
BC-5A/5B
e
g
a
ill
V
RL.135.750M
990.0[W ]
u
a
MSL-135.685
E - 418207.56
190.0[W ]
(55Mx40M)
PUMP HOUSE
C LDO
L
TANK #2
DOW N
m
ri
u
h
a
L
CRUSHED LINE
STORAGE SILO
LO
CO
34
RL.133.00M
HFO/LDO
13
ABSORBER
SYSTEM
(70Mx60M)
400 S
IR
PU
R/
KA
NP
UR
58
ABSORBER
SYSTEM
(70Mx60M)
36
C HFO TANK #1
L
DA
PS
UR
A
C HFO TANK #2
L
G A TE
29
GATE #2
DOWN
:
13
75
.
59
7
ST
AB
LI
NG
37
LIME STONE
UNLOADING
HOPPER
ABSORBER
SYSTEM
(70Mx60M)
700 S
FOR HEAVY VEHICLES ENTRY
C391(S)
OF 7M WIDE ROAD
L
C
L 7M W IDE OF ROAD
28
78
(1
50
M
TIM E OFFICE
27
T.B.M.-16
SECURITY
C
L OF 7M WIDE ROAD
6
1
.-
30
E - 419330
N - 2873589
KM
LI
NE
BC-5A/5B
11
C
L DUCT
226.250M (W)
MSL -136.241
17
530 E
SECURITY OFFICE
64(I)
343.0M (S)
.M
.B
T
31
C CHIMNEY
L
DRIVE HOUSE
300 S
RL.133.00M
58
400 S
200 S
e
g
a
ill
V
405.3[W ]
JT-12
59
323.2[W ]
21
49
100 S
ER-6
MI
LL
(TYP)
FD FAN
REJECT SI
LO
MI
LL
(TYP)
BC-6A/6B
PA FAN
C
L
14
PA FAN
C
L
r
u
jp
ra
u
S
15
BC-7A/7B
REJECT SI
LO
FD FAN
C
L
C
L
75
MI
LL
(TYP)
PA FAN
FD FAN
REJECT SI
LO
BC-7A/7B
PA FAN
C
L
11
13
(FOR ALL THREE UNITS)
NEXT FLOOR AT EL. 8.5M
MI
LL
(TYP)
BC-8A/8B
REJECT SI
LO
MI
LL
(TYP)
REJECT SI
LO
MI
LL
(TYP)
REJECT SI
LO
PA FAN
C
L
13a
E
A/C EQUIPMENT ROOM FL.EL.0.0M
16
BC-8A/8B
FD FAN
C
L
58
17
18
19
60.0[E]
C
L
FROM 0.0M
TBC-1A/1B
24
(FOR ALL THREE UNITS)
NEXT FLOOR AT EL. 8.5M
C OF M ILL BAY
L
BOILER
25
25a
INERT GAS ROOM FL.EL.0.0M
15
BOILER
29
C
L
30
65
TBC-1C/1D
31
C OF M ILL BAY
L
C OF M ILL BAY
L
14
32
TBC-2A/2B
33
C OF M ILL BAY
L
34
TBC-3C/3D
35
75
C OF M ILL BAY
L
36
STACKER CUM RECLAIMER MACHINE
OIL TANK
COMMON
CHIMNEY
5M WIDE
37
48
COMMON
OIL TANK
OIL TANK
21
300 S
0.00 NS
DG SET ROOM
R.S.
C 7.0M WIDE ROAD
L
25a
226.94M (S)
58
600 S
MSL -135.225
E - 419024
N - 2873821
C 7.0M WIDE ROAD
L
61
PANEL ROOM
FOR CPU
M AINTENANCE BAY
W ITHDRAW L
SPACE FOR TUBE
M DBFP
DC SEAL OIL M OTOR
STARTER CABINET FOR
SPACE FOR HP PARTS
LAYDOWN
CABLE VAULT AT FL.EL.0.0M
HT SWITCHGEAR AT FL.EL.3.5M
DRAIN COOLER
GRATED FLOOR
LUBE OIL SKID
TDBFP
TDBFP
C 88 (E) OF 7.0M W IDE ROAD
L
76
NGR
EL0.0M
CEP
BALL COLL
STRAINER
TDBFP
TOILET
R.S.
GSC
EL. 3.1M
ELECTRICAL ROOM
UNIT
AIR RECEIVER
EL.2.5M
M AINTENANCE BAY
EL.2.0M
CPV
BALL COLL
STRAINER
DMCW PUMPS (SG)
SEAL OIL UNIT
RESISTANCE BOX
OIL COOLER
MOTOR FOR DC SEAL OIL
DUPLEX W ORKING
PW INST.
CABINET
STAIR FROM CEP PIT
TO 2.2M PLATFORM
C PUM P
C CW SUPPLY HDR (UNIT# 1)
L
C CW RETURN HDR (UNIT# 1)
L
M ANHOLE
M ANHOLE
SCF-B
SCF-A
W ATER BOX HANDELING
UNLOADING BAY
FOR DMCW PUMP
C.P.U. UNIT
REMOVABLE PLATFORM
& HAND RAILING
RS
GAS ANALYSER
CONTROL CABINET
FROM
CPV
PL.EL.5.0M
CW SUPPLY
CW SUPPLY
REMOVABLE PLATFORM
LUBE OIL SKID
TDBFP
FROM
0.00M
DM CW PUM PS (T.G.)
W ITHDRAW L
SPACE FOR TUBE
SEAL OIL UNIT
OIL COOLER
DUPLEX W ORKING
DC SEAL OIL M OTOR
STARTER CABINET FOR
M DBFP
TDBFP HANDLING
AREA
EL.0.0M
DOSING UNIT
TOILET
R.S.
HANDLING SPACE
PHE-A(SG)
EQUIPMENT HANDLING
HYD. & SEAL CABINET
OIL INSTRUMENT CABINET
VACUUM PUMP
LP DF/T
FROM
0.
0M
EL.3.5M
NGR
RS
TURBINE
PHE-B(SG)
PANEL ROOM
FOR CPU
FROM
CPV
CABLE VAULT AT FL.EL.0.0M
HT SWITCHGEAR AT FL.EL.3.5M
DRAIN COOLER
UAT#1B
EL3.5M
SPACE FOR
VACUUM PUMP
MAIN PLC
HP DF/T
C T.G.SET
L
C STEAM DRAIN
GRATED FLOOR
LUBE OIL SKID
TDBFP
TDBFP
FROM
0.
0M
REMOVABLE PLATFORM
& HAND RAILING
RS
EL0.0M
CEP
BALL COLL
STRAINER
TDBFP
UAT#1A
AIR WASHER
UNIT#1
(15X12M)
FROM
MONORAIL
PANEL-2
EL.2.2M
C CONDENSER
L
C CW SUPPLY HDR (UNIT# 2)
L
C CW RETURN HDR (UNIT# 2)
L
M ANHOLE
SCF-B
SCF-A
DM CW PUM PS (T.G.)
OIL COOLER
EL.2.0M
CPV
C.P.U. UNIT
PL.EL.5.0M
M ONORAIL CAP.5T
W ITHDRAW L
SPACE FOR TUBE
SEAL OIL UNIT
OIL COOLER
DC SEAL OIL M OTOR
STARTER CABINET FOR
M DBFP
CPV
LUBE OIL SKID
TDBFP
FROM
0.00M
FROM
0.
0M
FROM
REMOVABLE PLATFORM
DOSING UNIT
BALL COLL
STRAINER
UNIT
AIR RECEIVER
74
ROOF AT EL. 5.0 M
HPSU JB
LPBV
HPSU OF
EL. 2.2M
HP PIPING BAY
a
rs
Si
TOILET
FOR DMCW PUMP
DMCW PUMPS (SG)
UT#1A
STATOR HANDLING
BALL COLLECTION SKID
PHE-A(TG)
SPACE FOR HP PARTS
LAYDOWN
U1
LADIES
HANDLING SPACE
PHE-A(SG)
BALL COLLECTION SKID
PANEL-2
GAS UNIT
GSC
EL. 3.1M
U1
TDBFP HANDLING
AREA
EL.0.0M
STAIRCASE FROM
0.0M TO 33.0M (TYP.)
PHE-B(SG)
PANEL ROOM
FOR CPU
NGR
JACK PADS SUPPORT FOR
GAS CYLINDER ROOM
FROM
PHE-C(TG)
PHE-B(TG)
EL.2.5M
U2
LUBE OIL SKID
TDBFP
TDBFP
U2
25
U3
170.00M (S)
U3
735.00M (W)
MONORAIL FOR HANDLING
BUTTERFLY VALVES (TYP.)
TDBFP
FROM
CR
S
CABLE VAULT AT FL.EL.0.0M
HT SWITCHGEAR AT FL.EL.3.5M
GRATED FLOOR
BALL COLL
STRAINER
MONORAIL FOR HANDLING
BUTTERFLY VALVES (TYP.)
MOTOR FOR DC SEAL OIL
RESISTANCE BOX
STAIR FROM CEP PIT
TO 2.2M PLATFORM
M ONORAIL CAP.5T
UNLOADING BAY
W ATER BOX HANDELING
M ANHOLE
890.564M (W)
UNIT
AIR RECEIVER
TBC-3A/3B
EL0.0M
DRAIN COOLER
BALL COLL
STRAINER
DMCW PUMPS (SG)
UT#1B
C CW SUPPLY HDR
L
RS
C UNIT.F/T
SPACE FOR
EQUIPMENT HANDLING
PW INST.
CABINET
GAS ANALYSER
CONTROL CABINET
LP DF/T
GT#1A
C CW RETURN HDR
L
NGR
EL3.5M
HYD. & SEAL CABINET
OIL INSTRUMENT CABINET
VACUUM PUMP
GAS UNIT
0.00M EW [418788M-(E)]
1U
2U2
NGR
UAT#2B
(15X12M)
VACUUM PUMP
MAIN PLC
HP DF/T
2U1
UAT#2A
AIR WASHER
UNIT#2
PANEL-2
C T.G.SET
L
TURBINE
1V
2V2
GT#1B
NGR
74
FROM
MONORAIL
BALL COLLECTION SKID
EL.2.2M
C STEAM DRAIN
2V1
STATION TRANSFORMER#1
UT#2A
ROOF AT EL. 5.0 M
HPSU JB
LPBV
HPSU OF
EL. 2.2M
HP PIPING BAY
1W
2W2
GT#1C
STATOR HANDLING
RS
BALL COLLECTION SKID
PANEL-2
PHE-A(TG)
SPACE FOR HP PARTS
LAYDOWN
2W1
JACK PADS SUPPORT FOR
GAS CYLINDER ROOM
FROM
PHE-C(TG)
PHE-B(TG)
GSC
EL. 3.1M
C OF M ILL BAY
L
LOG
C
L 1090.50 (W ) OF 4M W IDE ROAD
RESISTANCE BOX
DUPLEX LUBE
C CONDENSER
L
DM CW PUM PS (T.G.)
M ONORAIL CAP.5T
PORTICO
OP
T
S
LIFT
62
BOUNDARY WALL
CW SUPPLY
CW SUPPLY
CW SUPPLY
M ANHOLE
SCF-B
SCF-A
PUMP
GATE
TOILET
R.S.
947.504M (W)
T.B.M.-28
MOTOR FOR DC SEAL OIL
EL.2.5M
CEP
3.0M.WIDE PIPE RACK
N - 2872339.11
PW INST.
CABINET
STAIR FROM CEP PIT
TO 2.2M PLATFORM
DUPLEX W ORKING
GAS ANALYSER
CONTROL CABINET
LP DF/T
HANDLING SPACE
PHE-A(SG)
NGR
C CW SUPPLY HDR
L
RS
C UNIT.F/T
HYD. & SEAL CABINET
OIL INSTRUMENT CABINET
VACUUM PUMP
C T.G.SET
L
TURBINE
UT#2B
C CW RETURN HDR
L
LUBE OIL
SYSTEM
NGR
EL3.5M
SPACE FOR
VACUUM PUMP
MAIN PLC
HP DF/T
EL.2.2M
C STEAM DRAIN
OIL COOLER
PUMP
PUMP
OF
EL. 2.2M
HP PIPING BAY
PHE-B(SG)
16
(F.F.L.)
EL.(+) 0.5M.
14.436M (S)
C GANTRY
L
GT#2A
CENTRAL
NGR
UAT#3B
(15X12M)
FROM
MONORAIL
OF
CE
N
T
AREEN
AI
N
EEN
22
1U
2U2
2U1
1U
2U2
UAT#3A
AIR WASHER
UNIT#3
ROOF AT EL. 5.0 M
HPSU JB
LPBV
HPSU OF
EQUIPMENT HANDLING
PHE-A(TG)
2U1
GT#2B
NGR
74
STAIRCASE FROM
0.0M TO 17.0M (TYP.)
STATOR HANDLING
GAS UNIT
5000
200 S
UT#3A
JACK PADS SUPPORT FOR
RS
BALL COLLECTION SKID
PANEL-2
PANEL-2
PHE-B(TG)
(42M X 33.5M)
1V
2V2
STATION TRANSFORMER#2
GAS CYLINDER ROOM
FIRE EXIT
DOOR (TYP.)
BALL COLLECTION SKID
2V1
GT#2C
DUPLEX LUBE
NGR
C CW RETURN HDR
L
C CW SUPPLY HDR
L
MONORAIL FOR HANDLING
BUTTERFLY VALVES (TYP.)
C UNIT.F/T
FROM
FIRE EXIT
STAIRCASE FROM
0.0M TO 17.0M (TYP.)
PHE-C(TG)
SERVICE BUILDING
1W
2W2
2W1
CW SUPPLY
UT#3B
OF
PUMP
OF
CW
P
UM
PUMP
OF
FOR DMCW PUMP
MSL -138.152
E - 418025.80
GT#3A
M ANHOLE
NGR
70
PUMP
OF
2U2
21
T.B.M.-25
100 S
1U
AREA
PUMP
2U1
GT#3B
STATION TRANSFORMER#3
OF
1V
2V2
W ATER BOX HANDELING
PARKING AREA
2V1
GT#3C
C CONDENSER
L
26
PUMP
OF
MSL-139.697
E - 418062
N - 2872862
C GANTRY
L
TRANSFORMERS
1W
2W2
30000
C GANTRY
L
2W1
BOILER
OF
0.00M NS [2873567M-(N)]
C CW SUPPLY HDR (UNIT#3)
L
C
L
PUMP
TBC-2C/2D
OF
C CW RETURN HDR (UNIT#3)
L
C CW SUPPLY HDR (UNIT# 3)
L
PUMP
ACW
PU
PS
OF
C 501.5(W ) OF 7.
0M W IDE ROAD
L
39
SYSTEM PIPING
520.
0M (W )
C CW SUPPLY HDR (UNIT#3)
L
TP-FOR CW & ACW
IN
T
E
AREA
C CW SUPPLY HDR (UNIT#2)
L
C CW RETURN HDR (UNIT#3)
L
C PUM P
C CW SUPPLY HDR (UNIT#2)
L
100 N
750
C CW SUPPLY HDR (UNIT#1)
L
C CW RETURN HDR (UNIT#2)
L
C CW RETURN HDR (UNIT#2)
L
67.00M(N)
62.00M(N)
NANCE
PUMP
0.00 NS
C
L OF 7M WIDE ROAD
C CW RETURN HDR (UNIT#1)
L
C CW SUPPLY HDR (UNIT#1)
L
77.00M(N)
72.00M(N)
C CW RETURN HDR (UNIT# 3)
L
82.00M(N)
23
200 N
138000
138000
ACW SUPPLY UNIT#1,2 & 3
87.00M(N)
13
76
.
22
5
DI
SP
AT
CH
94.50M(N)
92.50M(N)
90.50M(N)
RL.133.00M
C OF TG
L
UNIT# 1
C OF TG
L
UNIT# 2
C OF TG
L
UNIT# 3
100 N
:
KM
300 N
YA
RD
58
58
58
TOWER & WT
CT
150X150M
58
12000
69
500 S
ASH WATER PUMP HOUSE AND MCC ROOM
CVT
4.
0M WI
DE ROAD
300 N
HARVESTING POND
MSL -137.782
E - 418508
N - 2873970
67
e
g
lae
ilg
Vlla
aVi
rs
i
sa
S
ir
S
-E
0
0
2
7
1
4
KA
N
NALLA
10
500 N
TO
RL.133.00M
LA
NALLA
58
MCC CONTROL ROOM (FOR ASH SLURRY PUMP HOUSE)
LA
53
C
L 436.5 (W ) OF 7.0M W IDE ROAD
400 N
600 N
66
AR
EA
55
-E
0
0
0
7 CULVERT
1
4
NO
58
M
AI
NT
EN
AN
CE
500 N
RL
Y
13 .:
LKM
76
XI
.6
'
C' NG
00
N
CL
AS O -S
S(
-4
6
M
)
SLO PE
40
PE
58
700 N
58
O
SL
-N
0
0
4
2
7
8
2
600 N
58
TE
:-
l
o
o
ho
ch
S
700 N
EX
IS
TI
NG
PR
W
OP
OR
OS
K
SH
E
PR
D
OW
NU
OP
N
PP
OS
IN
L
ED
SI
-DI
NU
--N
PP
G
BL
L/
W
RA
AC
OR
IL
K
K
W
SH
AY
OW
PR
N
OP
IN
OS
-AL
--AT
RE
TH
D
E
TI
M
E
OF
DO
35
0
d
n
o
P
1315.0M (N)
PR
OP
SI
.N
DI
N G UP
P
PH L
-I
COMPARTMENT-I
58
AG
54
H IG
1200 N
1500 N
RA
IL
58
NALLA
1300 N
1600 N
R=
NALL
A
AM
1400 N
68
1700 N
60
PUR
M IR
HA
TO
AD
RO
BAFFLE
1500 N
58
H
AC
RO
APP
TO
ps
o
h
S
am
i
rp
ur
s
op
Sh
s
op
h
S
1700 N
58
To
H
IR
PU
R
1800 N
RA
IL
W
1900 N
EX
IS
TI
NG
1900 N
AY
300 acres
----
2000 N
127 acres
TA
ASH POND
SH
O
U
C
E
S
58
2100 N
ASH SLURRY PUMP HOUSE
OFF
56
Y
IT
R
E
IC
MAIN ENTRY
TO PLANT
32
EN
3
3
GATE #1
UB
LI
N
2200 N
2300 N
EX
I
LA STI
NG
ND
TR
RA
BO
AC
IL
UN
K
DA W A
RY Y
2300 N
RL
Y.
KM
LXI
13
N
'
78
C'
G
.3
NO
CL
20
AS
-S
S(
-4
7
M
)
A
LL
NA
2600 N
C
S
R
2600 N
7
5
6
m
2700 N
:
K
M
A
M
S
1
T
3
I
R
A
7
T
9
P
IO
.0
U
R
4
N
0
R
LY
.
2800 N
E
X
IS
T
IN
E
G
X
IS
L
O
T
O
IN
P
G
L
IN
M
E
A
IN
L
IN
167 acres
R
L
(U Y.
P
L
R
LO O O
L
P
O
(U Y M
P
L
P
A
LI IN
IN
M
E
N
A
E
LI
IN
) AT
N
T
LI
E
H
N
E
A
E
T
T
)
IM
T
H
E
E
O
T
F
IM
D
E
O
U
O
B
F
LI
D
N
O
G
U
B
LN
G
2900 N
1600 N
ANNUAL
ANNUAL
08.30 Hrs
NRUE)
3500 N
3400 N
48
2300 E
2200 E
2100 E
2000 E
1900 E
1800 E
1700 E
1600 E
1500 E
1400 E
1300 E
1200 E
1100 E
1000 E
900 E
800 E
700 E
600 E
500 E
400 E
300 E
200 E
100 E
0.00 EW
100 W
200 W
300 W
400 W
500 W
600 W
700 W
800 W
900 W
1000 W
1100 W
1200 W
1300 W
1400 W
1500 W
1600 W
1700 W
1800 W
1900 W
2000 W
2100 W
2200 W
2300 W
2400 W
3500 N
N (CONST.)
48
48
O
T
CO NS.
NO RTH
10
11
CO NS.
NORTH
12
1600 S
1700 S
au
Ch
.:
90
0.
0
43
1800 S
72
RECEPTION YARD
GATE
RL
Y
M)
150
(
NE
I
L
NG
I
ABL
T
OS
C
O
L
1800 S
:
KM
13
73
.
71
0
1900 S
1900 S
LOCO WORKSHOP
B
2000 S
58
FOR TENDER PURPOSE ONLY
2300 E
2200 E
2100 E
2000 E
1900 E
1800 E
1700 E
1600 E
1500 E
1400 E
1300 E
1200 E
1100 E
2200 S
1000 E
700 E
1
5
00
.0
600 E
C
h
.
:-
500 E
400 E
58
300 E
200 E
100 E
0.00 EW
100 W
58
200 W
300 W
400 W
500 W
600 W
700 W
800 W
900 W
1000 W
1100 W
1200 W
1300 W
1400 W
1500 W
1600 W
1700 W
1800 W
1900 W
2000 W
2100 W
2200 W
2300 W
2200 S
2100 S
900 E
DA
PS
UR
A
o.
83 3
LABOUR COLONY
Cu
lv
er
t
T.
B
R
.
l
. M.
142. N
2100 S
800 E
79
2400 W
2000 S
sw
A
NEYVELI UTTAR PRADESH POWER LIMITED
M
ar
au
10
11
REFERENCE DRAWINGS.
NOTICE
NOTES
10
1. PLOT PLAN (PROJECT REPORT)
2. LAYOUT PLAN(PROPOSAL-3)
DWG.NO. 00-1111113-G-001 REV.H
DWG.NO. RITES/RPO-DELHI/NEYVELI/GHATAMPUR/03 REV.0
1.
DO NOT SCALE, ASK WHEN IN DOUBT.
2.
ALL DIMENSIONS ARE IN MILIMETRES UNLESS NOTED OTHERWISE.
3.
RAILWAY MARSHALLING YARD SHOWN IS TENTATIVE ONLY.
THIS
DRAWING IS THE PROPERTY OF
C
H
:
K
M
1
DESEIN
PRIVATE LIMITED, NEW DELHI,
3
7
2
.
8
4
0
A
U
R
A
S
T
A
T
IO
N
5.
FINISHED FLOOR LEVEL OF BUILDING AND DIFFERENT AREA ARE AS FOLLOWS-
b. AREA FROM A- ROW TO C- ROW-RL.133.50M
FURNISH ANY INFORMATION FOR THE
c. BOILER AREA -RL.133.30M
MAKING OF DRAWINGS, APPARATUS,
d. FINISHED GRADE LEVELS -RL.133.0M ,RL.135.750 & RL.140.0M
e. ALL OTHER BUILDINGS -RL.500MM ABOVE,ADJACENT FINISHED GRADE LEVEL.
LENT OR OTHERWISE DISPOSED OF, DIRECTLY
OR INDIRECTLY. IT SHALL NOT BE USED TO
a. TRANSFORMER YARD-RL.133.40M
REVISED AS PER NLC MAIL DATED 11.11.2015
12.11.15
REVISED AS PER Lr.No PSE/NUPPL/CIVIL/1222/2015 DTD 25.07.2015
12.08.15
REVISED FOR RAILWAY SIDING AND WAGON TIPLLER LOACTION
08.07.15
REVISED FOR INDCATING TOWNSHIP AND APPROACH ROAD
12.06.15
REVISED AS PER NLC MAIL DATED.12.05.2015
LF
SE
ZONE
NAME
DESEIN
DES EI
N
NEW DELHI - INDIA
18.04.15
GENERALLY REVISED
16.01.15
REVISED AS PER MOM DATED-16.07.14 TO 19.07.14
22.08.14
REVISED AS PER NUPPL COMMENTS DATED-05.04.14
14.05.14
PARTICULARS
DATE
PROJECT:- 3 x 660MW GHATAMPUR THERMAL POWER PROJECT GHATAMPUR TEHSIL (U.P)
TITLE:-
CIVIL
MECH.
ELEC.
C&I
CAD/DRAWN
RAKESH
18.01.14
DESIGNED
KM.RAO
18.01.14
CHECKED
KM.RAO
23.01.14
SCALE
1:9000 (A0)
JOB. No.
D-4033
DWG.No.
H.O.D.
REV.
111-21-0100
CONTRACT AGREEMENT WITH DESEIN.
SR. No.
DATE
CLIENT:- NEYVELI UTTAR PRADESH POWER LIMITED
PLOT PLAN
MARK
SIGN.
CONSULTING ENGINEERS
18.05.15
REVISED AS PER NLC LR.N0. PSE/NUPPL/GENERAL/CIVIL/628/2015 DATED.17.04.2015
N ENGI
ANCE I
NEE
RELI
RI
NG
OR PARTS THEREOF EXCEPT FOR THE
PROJECT SPECIFICALLY PROVIDED FOR BY
6. ROAD LEVELS SHALL BE 250MM ABOVE FINISH GRADE LEVELS.
THAT IT SHALLRLYNOT
BE REPRODUCED, COPIED,
.
19.01.16
D
AND IS LENT
SUBJECT TO THE CONDITION
A
PS
4. FINISHED FLOOR LEVEL OF POWER HOUSE IS 133.50M WHICH
REVISED AS PER DISCUSSION WITH NUPPL/ RITES ON 06.01.2016 AT GURGAON
PARTY
REVISIONS
PRINT DISTRIBUTION
12
11
10
10
APPROVED
5