Borak Real Estate (PVT.) LTD.: Status & Monthly Project Progress Report

This document is a monthly progress report for a construction project. It provides details on construction work completed in the prior month, including superstructure work, finishing work, electromechanical work, and sanitary/plumbing work. It also outlines project risks, the upcoming month's work plan, procurement status, staff responsibilities, construction photos, engineering test results, and upcoming tests. The report is intended to update project stakeholders on the status of the construction project over the past month.

Uploaded by

Hamayet Rasel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
92 views

Borak Real Estate (PVT.) LTD.: Status & Monthly Project Progress Report

This document is a monthly progress report for a construction project. It provides details on construction work completed in the prior month, including superstructure work, finishing work, electromechanical work, and sanitary/plumbing work. It also outlines project risks, the upcoming month's work plan, procurement status, staff responsibilities, construction photos, engineering test results, and upcoming tests. The report is intended to update project stakeholders on the status of the construction project over the past month.

Uploaded by

Hamayet Rasel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Borak Real Estate (Pvt.) Ltd.

51/B, Kemal Ataturk Avenue, Banani, Dhaka-1213.

Status & Monthly Project


Progress Report.
Project Name: ______________________________________________
Project Control Group: _______________________________________
Report for the Month of: _____________________________________
Monthly Report Number: ____________________________________

Date of Report:..
Report Prepared By:..
Report Checked By:

Monthly Project Progress & Status Report

Step 1: Construction Work Progress


Detail of Last Month
Category A: Details about Superstructure Work
(All RCC Related Work).

Category B: Detail about Finishing Work:

Monthly Project Progress & Status Report

Category C: Detail about Electromechanical

Work:
a) General Electrical Works:
Completed Works:

On Going Works and Processing:

b) Escalator and Elevator:


Completed Works:

On Going Works and Processing:

c) HVAC:
Completed Works:

On Going Works and Processing:

d) Sub Station & Generator:


Completed Works:

On Going Works and Processing:

Monthly Project Progress & Status Report

Category D: Detail about Sanitary & Plumbing


Work:
Completed Work:

Ongoing Works:

Category E: Required Drawing Design &


Decision:
Drawing and Design:

Work WOrder:

Monthly Project Progress & Status Report

Step 2: Project Risk/Threat Detail for Construction Work


Progress Continuations:

Step 3: Construction Work Planning of Coming Month.

Provide the Coming Months Working Plan By the Microsoft Project Grant
Chart.

Monthly Project Progress & Status Report

Step 4: Project Procurement, Store & Machineries Consuming


& Present Status Report:

Present Stock Status (Major Item Materials)


Sl
#

Descriptio
n

Uni
t

Openin
g
Balance

Receive
d Date

Receive
d
Quantit
y

Quantity of
Consumptio
n

Prese
nt
Balan
ce

Remar
ks

Uses Machineries (Construction Purpose)


Status:
Sl
#

Name of
Machinerie
s/
Equipment

Service Status
Nos
.

Damag
Running
e

Maintena
nce &
Servicing

Ownershi
p

Remar
ks

Materials Requisition Corresponding and


Receiving Details:
Sl
#

Category of
Submitted
Requisition

Submitted
Requisitions
Number

Delivery
Schedule
Date

Present
Status of
Submitted
Requisitio
n

Requisition
Num. Which
Blocked
Since Long
Time

Monthly Project Progress & Status Report

Remark
s

Step 5: Facing Legal Issue (If Any):

Step 6: Responsibilities of Existing Manpower/Project Staff

and Personal Evaluation:

Sl
#

Name of Employee

Designatio
n

Responsibili
ty/
Supervising
Field
Details

Remarks

Total Employee =
Note: All Employees (Permanent & Temporary) including security
guards duty and responsibility should be provided by above
mentioned table.

Step 7: Construction Picture:

Monthly Project Progress & Status Report

Should be attached ongoing works picture including all


problems.

Step 8:

a) All Related Engineering Test Status which is completed:


Enclosed all information and date about engineering test
in below table which is already been completed.

Sl
#

Date of
Test

Name of Laboratory
Test

Portion /
Area/Locati
on
collecting
sample.

Test Result
Status

Remarks

Note: Attached all resting report with this monthly report.

b) Details about upcoming engineering test:


Enclosed all information as per field collection data and
sample in below table, which will be ready to test performing
on schedule time and date:
Sl
#

Date of
Sample
Collection

Name of
Laboratory Test

Portion /
Area/Location
of collecting
sample.

Planning
Date of Test
Executing.

Monthly Project Progress & Status Report

Remarks

Note: Attached all sample collection details with this monthly

report.
Step 9: Conclusion:

Monthly Project Progress & Status Report