Updated date:
UPDATE DRAWING LIST & MATERIAL
No.
Local
All
Item
Piping marking
Description
In Charge
Will be marking by tape instead of
Production
paint
Next Action
Status
Issue color code and order
material
Target date
Technical spec
Remark
W41
Confirm by Bruno
W14
Sent to Trung design
W20
Comment by Owner.
See REX from S82/83
W20
Confirm by Bruno
pending
2
Supperstructure
Bronze bell
To be fitted forward bulkhead of
block4, fr47
Design
Update drawing
IP
3
Galley
Side door
To be added S.steel cover between
Design
interious door & watertight door
Update drawing and material
pending
4
All
Sink
Missing typhon for almost sink
Design
Update drawing and material
pending
5
New Office
AC
Missing air conditioning
Project/ Design To be confirmed by Bruno
W14
pending
6
2 men cabin
Access holes
To be made amaflex and cover by
Production
Aluminium facing
Update drawing and material
W20
Confirm by Bruno
W20
Confirm by Bruno
IP
7
Switch board room Water coming
Water coming switch board room
from washing machine
Design
Updated drawing with
additional non-return valve
pending
Updated date:
UPDATE DRAWING LIST & MATERIAL
No.
Local
Bothruster room
Item
S.Steel cabinet
Description
In Charge
To be fit 5pcs in bowthruster room Design
Next Action
Status
Update drawing and material
Target date
W15
Technical spec
Remark
Not inTS
Sent to Trung & Huong
design
Shelves to be moved
from Schottel room to
bow thruster room
Done
9
All room
Composite door
Not watertigh, hinges bad quality Design
Update drawing
W20
Comment by Owner
W16
Comment by Owner.
Sam-341 inform
production to use
Junction box IP67 from
stock
pending
10
ER
Electric junction box
All electric junction box below
floor must be water tight
Design
Update drawing and material
Not inTS
Done
11
ER
Electric cabinet
Electric cabinet touching with GE Design/
exhaust pipe ladding
Production
Check again concerning
drawing
W15
Comment by Owner
pending
12
All
Brass valve
To be added insulation kit when
Production
connect brass valve with steel pipe
Update drawing and material
W16
Not inTS
Confirm by Bruno
pending
13
ER, Technical room Ladder
Ladder for fresh water tank SBT
Design
and Lub.Oil tank touching piping
Update drawing
W14
Sent to Trung design
W14
Informed Arturo in
drawing meeting
Done
14
Bridge deck
FIFI pipe
Support for FIFI pipe of monitor
must be movable
Design/
Production
Update drawing
Done
Updated date:
UPDATE DRAWING LIST & MATERIAL
No.
15
Local
Item
Nav. Bridge deck Funnel outside
Description
In Charge
Vibriation to be solved with more
Design
support
Next Action
Status
Update drawing
Target date
Technical spec
Remark
W17
Confirm by Bruno
As-built SEAS88/89
W17
Trial comment
W17
Comment by Owner
As-built SEAS88/89
pending
17
AC room
Insulation arround door
To be added Steel cover on
insulation of step
Design
Update drawing
pending
18
ER
Hydraulic
To be removed 2 valve at hydraulic
Design
tank
Update drawing & material
pending
19
Lobby
Grating on floor
Grating for lobby with full area to
Design
be done
Update drawing & material
W17
Not inTS
Sent information to
Trung & Huong design
As-built SEAS88/89
IP
20
Technical room
PVC pipe
To be cover PVC pipe at door
access in technical room
Production
Confirm by Bruno
pending
21
FW tank
Glass level gauge
Cover for level gauge of FW tank
for next vessel to avoid broken
Production
glass tube
Update drawing & material
W18
pending
22
Deck
Winch gear
To be protected with movable
cover
Production
Confirm by Bruno
pending
Updated date:
UPDATE DRAWING LIST & MATERIAL
No.
Local
23
Stair
Item
Wooden handrail
Description
All wooden hand rail on top stair
to ensure strong
In Charge
Design
Next Action
Status
Update drawing & material
Target date
Technical spec
Remark
W20
Sent information to
Huong design
W15
Sent information to
Thuan design
pending
24
Stair
Wheel house stair
To be removed bracket at top of
wheel house stair
Design
Update drawing
pending
25
All room
Interious door
So many ACC door missing grille Design
Sent information to
Huong design
Update drawing
done
26
2 men cabin
Ladder
Connecting bolt for removable
ladder inside cement, to be move
up 170mm
Design
Sent information to
Trung design
Update drawing
done
27
ER
Ventilation box
Very low, to be move up
Design
Informed Arturo in
drawing meeting
Update drawing
done
28
Deck
Mooring rope
To be remove thimble at the end
Design
Sent information to
Trung & Trang design
Update DA
Done
29
Funnel
Insulation
Adding insulation for silencer of
exhaust pipe
Design
Update drawing
W15
Not inTS
Done on Seas88, 89
pending
Updated date:
UPDATE DRAWING LIST & MATERIAL
No.
Local
30
Schottel room
Item
Discharge valve
Description
To be added drip tray for all
discharge valve
In Charge
Design
Next Action
Status
Target date
Technical spec
Remark
Await Bruno confirm
pending
31
Wheel house
Wheel house cabinet
To be added ventilation grid on
door
Design
Already done on
Seas88, 89
Update drawing
pending
32
Wheel house
Console
Shelves are too small to store the
blinders (modified on previous
vessels by Boluda)
Design
To be done in the cabins
as well
To be modified drawing
pending
33
Wheel house
Guardrail
SS guardrail in wheelhouse (door)
Design
too low
comment from French
flag
To be modified drawing
Done
34
All cabin
Desk above heater
Grids to be added on desks in
Design
cabin above the eaters
To be modified drawing
confirmed by Bruno
pending
6.Apr.2016
Picture
6.Apr.2016
Picture
6.Apr.2016
Picture
6.Apr.2016
Picture
6.Apr.2016
Picture
10