Pipe Fittings: S# Description No Size Unit Rate (RS/FT) Cost Rs. Dia (Rs/No)

The document provides details of materials and quantities required for the construction of drinking water supply schemes, including excavation, concrete, masonry, plastering, reinforcement, and piping materials. It also includes estimates of labor costs for skilled and unskilled workers, transportation costs, and a summary of total projected capital costs. The project involves construction of water storage tanks and a distribution system to provide drinking water to a community.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
50 views20 pages

Pipe Fittings: S# Description No Size Unit Rate (RS/FT) Cost Rs. Dia (Rs/No)

The document provides details of materials and quantities required for the construction of drinking water supply schemes, including excavation, concrete, masonry, plastering, reinforcement, and piping materials. It also includes estimates of labor costs for skilled and unskilled workers, transportation costs, and a summary of total projected capital costs. The project involves construction of water storage tanks and a distribution system to provide drinking water to a community.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 20

PIPE FITTINGS

S#

Description

No

Size
Dia

Unit

Rate(Rs/ft)
(Rs/No)

Cost Rs.

Socket

50

1"

Inch

22

1100

Union

20

1"

Inch

55

1100

Socket

52

3/4"

Inch

18

936

Union

26

3/4"

Inch

50

1300

Socket

125

1/2"

Inch

16

2000

Tee

1"-1/2"

Inch

30

60

Tee

14

3/4"-1/2"

Inch

26

364

Union

62

1/2"

Inch

50

3100

Taps

20

1/2"

Inch

90

1800

10

Ball Valve

3/4"

Inch

150

300

11

Reducer

3/4-1/2

Inch

32

96
11760.00

Total

11760.00

Bar Bending Schedule :S#

Description

Spring Cappiang Tank


(4'x4'x4') 2No

Main Bar @ 6" C/C Both way's


2

Size
(dia)

No of
item

Cut
Length

No of
Bar

Total
Length

weight/ft
(lbs)

Total Wt
(lbs)

Remarks

1/2"

7.33

30

439.8

0.667

293.35

3"

6-10"

1/2"

11.33

46

521.18

0.667

347.63

3"

10-10"

640.97

lbs

Storage Tanks
( 8' x 8' x 7.5' ) 1No

Main Bar @ 6" C/C Both way's

Total

291 Kg

QUANTITIES OF MATERIAL & LABOUR REQUIRED


MATERIAL
SN

DESCRIPTION

QTY

UNIT

1 Excavation of tanks (in soft rock)

272.00 Cft

2 P.C.C (1:4:8) in foundation of tanks

136.00 Cft

3 Stone masnory (1:4) in walls of tanks

LABOUR

CEMENT

SAND

CRUSH

STONE

Cover

STEEL

Water

Pipe

SKILLED

UNSKILLED

BAG

CFT

CFT

CFT

No

KG

Ltrs

RFT

NO's

NO's

12.92

64.60

129.20

749.31 Cft

50.20

254.77

4 P.C.C (1:2:4) in flooring of tanks 4" thick.

31.68 Cft

5.58

13.94

5 1/2" thick Plastering (1:3) in wall of tanks

748.00 Sft

10.47

14.32

582.08

0.45

8.00

936.64

3207.05

49.95

92.51

27.88

135.59

0.11

1.86

39.64

3201.44

5.34

6.93

30.11 Cft

5.30

13.25

26.50

0.28

2.51

110.52 Sft

4.25

4.25

8 M.S Cover in slab of tanks

3.00 No

3.00

1.00

1.00

9 Steel Fabrication

291 Kgs

291

2.91

2.91

740.00 Rft

740.00

4.23

5.92

G-I Pipe 1/2" Dia

3690.00 Rft

3690.00

49.20

73.80

G-I Pipe 3/4" Dia

1530.00 Rft

1530.00

13.54

20.40

6 R.C.C (1:2:4) in slab of tanks


7 Shuttering of R.C.C slab of tanks

10 Distribution System/Pipe Fixing


Laying /Fixing of pipe
G-I Pipe 1" Dia

TOTAL

84

386

184

937

291

7126

5960

131

234

TOTAL C/O.

91

404

219

937

291

7126

5960

132

238

CAPITAL COST OF DRINKING WATER SUPPLY SCHEME


LABOUR COST
SN

Item

Quantity

ManDays
Unit Skilled
Unskilled

Excavation of tanks in soft rock

272.00 cft

0.00

14.32

P C C 1: 4: 8 in foundation of tanks

136.00 cft

0.45

8.00

Stone Masonry 1:4 in walls of tanks

749.31 cft

49.95

92.51

P C C 1: 2:4 in flooring of tanks

31.68 cft

0.11

1.86

Plaster 1/2 " 1:3 in walls of tanks

748.00 sft

5.34

6.93

R C C 1: 2:4 in slab of tanks

30.11 cft

0.28

2.51

Shuttering of R.C.C slab of tanks

110.52 sft

4.25

4.25

M.S Cover in slab of tanks

3.00 No

1.00

1.00

Steel Febracation

290.82 Kg

2.91

2.91

740.00 Rft

4.23

5.92

10

G.I Pipe 1" Dia

11

G.I Pipe 1/2" Dia

3690.00 Rft

49.20

73.80

12

G.I Pipe 3/4" Dia

1530.00 Rft

13.54

20.40

131

234

132

238

TOTAL
TOTAL C/ O
S.No. COST:

Estimated (Rs)

Skilled @ 300/-per no.

132.00

39600.00

Unskilled @ 180/-per no.

238.00

42840.00

TOTAL

82440.00

CAPITAL COST OF DRINKING WATER SUPPLY SCHEME


MATERIAL COST
SN

Item

Quantity

Unit

1 Cement

91

Bags

2 Sand

404

3 Crush

Unit Rate

Amount

Rs

Rs
335

30485

Cft

23

9292

219

Cft

24

5256

4 Stone

937

Cft

10

9370

5 1/2" dia Steel

291

Kgs

42

12222

6 Pipe (G.I 1" Dia)

740

Rft

48

35520

7 Pipe (G.I 3/4" Dia)

1530

Rft

36

55080

8 Pipe (G.I 1/2" Dia)

3690

Rft

26

95940

9 Pipe Fittings

10 M.S cover

11 Transportation

TOTAL
TOTAL C/O

No

11760
1000

3000
21330.16

289,255
289,255.000

CAPITAL COST OF DRINKING WATER SUPPLY SCHEME


Transportation Charges

S.#

Item

1 Cement

Qty

Unit

91 bag

Unit Rate

Amount

Rs

Rs

20

1820

2 Sand

404 cft

10

4040

3 Crush

219 cft

10

2190

4 Stone

937 cft

2811

5 1/2" dia Steel

291 kg

1455

1.5

7830

884

100

300

6 Pipe and Fitting

5220 rft

7 Shuttering

111 sft

8 M.S cover

3 no

Total

21330

SUMMARY OF COST
Name of Region

Rawalpindi

Field Unit

Murree

U.Council

Thesil

Murree

Village

Name of CO.

Daniota

S.#
A

DESCRIPTION

Rawalpindi
Sehr Bagla
Daniota

Type of Scheme

ESTIMATED
COST Rs

DWSS

CONTRIBUTION
OF CO Rs

CONTRIBUTION
OF PPAF Rs

LABOUR
1 Skilled

39,600

32,160

7,440

2 Unskilled

42,840

42,840

82,440

75,000

7,440

30485

30485

2 Sand

9292

9292

3 Crush

5256

5256

4 Stone

9370

9370

198300

198300

12222

12222

3000

3000

21330

21330

SUB TOTAL (B)

289,255

289,255

TOTAL A+B

371,695

75,000

296,695

4,000

4,000

375,695

75,000

300,695

SUB TOTAL (A)


B

District

MATERIAL
1 Cement

4 Pipes &Fittings
5 Steel
9 M.S cover
10 Transpoartion

COST OF SIGN BOARD


GRAND TOTAL
Contribution OF PPAF
Percentage

Field Engineer: .

300,695
20%

80%

Regional Engineer:

Hydraulic Statement Chart


S#

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

LINE

A-B
B-C
C-D
D-E
C-F
F-G
F-H
H-I
J-K
L-M
M-N
C-O
P-Q
Q-R
R-S
S-T
U-V
W-X
X-Y
V-K'
K'-L'
Z-A'
B'-C'
D'-E'
D'-F'
G'-H'
I'-J'

Length

No Of

Maximum

Design

Velocity

Size of

Head Loss

(ft)

Household

Demand

Demand

Ft/Sec

Pipe

(ft)

6am-8am

Cusec

29

0.00247

0.0082

29

0.00176

0.0059

28

0.00194

0.0065

27

0.00212

0.0071

27

0.00212

0.0071

26

0.00176

0.0059

25

0.00212

0.0071

24

0.00318

0.0106

22

0.00159

0.0053

20

0.00212

0.0071

19

0.00106

0.0035

16

0.00229

0.0076

15

0.00212

0.0071

14

0.00247

0.0082

13

0.00212

0.0071

12

0.00176

0.0059

12

0.00212

0.0071

11

0.00106

0.0035

10

0.00106

0.0035

0.00106

0.0035

0.00106

0.0035

0.00106

0.0035

0.00106

0.0035

0.00106

0.0035

0.00106

0.0035

0.00106

0.0035

0.00106

0.0035

40.00
700.00
400.00
300.00
200.00
100.00
250.00
150.00
150.00
40.00
150.00
200.00
500.00
280.00
600.00
300.00
100.00
120.00
240.00
400.00
200.00
40.00
20.00
80.00
20.00
80.00
300.00

0.083
0.083
0.040
0.040
0.083
0.060
0.040
0.040
0.040
0.040
0.060
0.060
0.060
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.040
0.060
0.040
0.060
0.040
0.040
0.040

HGL
Upper End

Lower End

Ground

(Ft)

(Ft)

Level

3.73

4358

4354.27

4346

101.07

4346

4244.93

4224

33.68

4224

4190.32

4176

30.06

4176

4145.94

4129

41.58

4129

4087.42

4073

10.44

4073

4062.56

4055

25.05

4055

4029.95

4014

33.82

4014

3980.18

3966

2.25

3966

3963.75

3947

15.03

3947

3931.97

3925

7.51

3925

3917.49

3903

88.20

3903

3814.80

3799

42.08

3799

3756.92

3731

81.83

3731

3649.17

3635

60.12

3635

3574.88

3552

20.87

3552

3531.13

3512

10.02

3512

3501.98

3487

3.01

3487

3483.99

3470

6.01

3470

3463.99

3447

10.02

3447

3436.98

3421

5.01

3421

3415.99

3400

1.50

3400

3398.50

3387

0.50

3387

3386.50

3369

3.01

3369

3365.99

3350

0.50

3350

3349.50

3340

2.00

3340

3338.00

3327

7.51

3327

3319.49

3301

Terminal
Head
(ft)
8.27
20.93
14.32
16.94
14.42
7.56
15.95
14.18
16.75
6.97
14.49
15.80
25.92
14.17
22.88
19.13
14.98
13.99
16.99
15.98
15.99
11.50
17.50
15.99
9.50
11.00
18.49

DESIGN CRITARIA
Proposed Scheme :- DWSS
Total House Hold
50
Beneficiary house hold
29
Average Population per House Hold.
7
Total population of the community
203
Design period
10
Let annual growth rate is
3%
Thus Design Population
203(1+0.03)^10
273
Let
Average per capita water consumption is 10 gallons per capita per day
Then average daily daman
2728
Let Demand for cattel
30
Demand for mosque
0
For other utility services
50
Thus total daily demand
2808
Requird water tank capacity
2808
0.033
450
Free board=
6"
Thus provide a storage tank of size

8'x8'x7.5'

No's
No's
Persons
Persons
Years
Persons

Gpd
Gpd
Gpd
Gpd
Gpd
Gpd
Gps
cft/day

WATER DEMAN
MAND AND

TAP FLOW CACULATION SHEET

Project Name :.
Description of tap

Domestic and Institutional Water demand

Cluster Name
Tap nos

or locality

numbers of
families
3

Present pop.
(p)

Design period
(n)

Growth rate

Design Pop.(pn)

(%) ( r )

[p(1+r)^n]

Per capita Demand


(lpcd)
8

TOTAL

NOTE:
1.Use Minimum Peak factor of 3 in col,15;
2. For Design Tap Flow (Col. 17) ,adjust peak flow of (col.16)by rounding off to nearest 0.01lps.
3.If flow is less than 0.1 lps then then adjust to 1lpsand if flow is greater than 0.25 lps increase the number of tapsand

Other Institutional water Demand


Totel Domestic Demand
(lpd)

e the number of tapsand

No of pupil in
institutional

9=7*8

10

Demand per pupil


(lpcd)
11

totel water demand

Total other Institutional

(lpd)

demand ( lpd)
12=10*11

13=9+12

Tap Flow calcultion


Awerarge

peak factor

tap flow in lps


14=13/86400

peak flow
(lps)

15

16=14*15

Design flow
(lps)

Adjustid peak
Facter

17

18=17/14

Remarks
19

DESIGN OF STROAGE TANK


6"
18"
in let

Size

6"

8'x8'x7.5'

12'

out let

M.S Cover
1.5'x1.5'

PLAN

1/2" bar @ 6" c/c b/way

R.c.c 1:2:4

4"slab thick

.
in let
8 feet

18"

18"

(1:4) Stone masnry

7.5'
Plaster (1:3) 1/2" thick
(6" thick P.c.c 1:4:8)
(4" thick P.c.c 1:2:4)

N.S.L

out let
1'

Size : 8'x8'x7.5'
X - SectionA A

DESIGN OF CAPPING TANK


6"
18"
in let
6"

Size

8'

4'x4'x4'
out let

M.S Cover
1.5'x1.5'

PLAN
1/2" bar @ 6" c/c b/way

R.c.c 1:2:4

4"slab thick

.
in let
4 feet

18"

4'
Plaster (1:3) 1/2" thick
(6" thick P.c.c 1:4:8)
(4" thick P.c.c 1:2:4)

out let

Size : 4'x4'x4'
X - SectionA A

18"

(1:4) Stone masnry

QUANTITIES

SN

DESCRIPTION

Stroage tank 8'x8'x7.5'

NO

D/H

FT

FT

FT

QTY

UNIT

1 Nos

1.1 Excavation of tanks (in soft rock)


1

12

12

Sub Total

144 cft
144 cft

1.2 P.C.C (1:4:8) in foundation 6" thick.


1

12

12

0.5

Sub Total

72 cft
72 cft

1.3 Stone masnory (1:4) in tanks Wall


L.walls
S.walls

11

1.5

7.75

255.75 cft

1.5

7.75

186.00 cft

Sub Total

442 cft

1.4 P.C.C (1:2:4) in flooring of tank 4" thick.


1

0.33

Sub Total

21.12 cft
21 cft

1.5 1/2" Plastering (1:3) in walls of tanks.


(in side)

L.Walls

(in side) S.Walls


(out side) L.Walls
(out side) S.Walls

11

11

7.5

120 sft

7.5

120 sft

8.16

179.52 sft

8.16

179.52 sft

Sub Total

359 sft

1.6 R.C.C (1:2:4) in slab of tanks.


tank 8x8x7.5

11

0.33

0 cft

1.5

0.33

1 cft

Deduction of M.S Cover


tank 8x8x7.5

1.5

Net Total

-1 cft

1.7 Shuttering of R.C.C slab of tanks.


tank 8x8x7.5

Side Stopper L,side

Side Stopper S.side

64 sft

11

0.33

7 sft

11

0.33

7 sft

Sub Total

79 sft

1.8 M.S Cover in slab of tanks.


tank 8x8x7.5 (1.5x1.5)
Sub Total

1
1 No

SN

DESCRIPTION

Capping tank 4x4x4 =

NO

D/H

FT

FT

FT

QTY

UNIT

2 Nos

1.1 Excavation of tanks (in soft rock)


capping tank 4x4x4

Sub Total

128 cft
128 cft

1.2 P.C.C (1:4:8) in foundation 6" thick.


capping tank 4x4x4

0.5

Sub Total

64 cft
64 cft

1.3 Stone masnory (1:4) in tanks Wall


Capping tank 4x4x4

L.walls

1.5

4.66

195.72 cft

S.walls

1.5

4.66

111.84 cft

Sub Total

308 cft

1.4 P.C.C (1:2:4) in flooring of tank 4" thick.


capping tank 4x4x4

0.33

Sub Total

10.56 cft
11 cft

1.5 1/2" Plastering (1:3) in walls of tanks.


capping tank 4x4x4

(in side)

(out side)

L.walls

64 sft

S.walls

64 sft

L.walls

4.66

130.48 sft

S.walls

4.66

130.48 sft

Sub Total

389 sft

1.6 R.C.C (1:2:4) in slab of tanks.


capping tank 4x4x4

0.33

Sub Total

32 cft
32 cft

Deduction of M.S Cover


capping tank 4x4x4

1.5

1.5

0.33

1 cft

Sub Total

1 cft

Net Total

31 cft

1.7 Shuttering of R.C.C slab of tanks.


tank 4x4x4

Side Stopper

32 sft

0.33

18 sft

Sub Total

32 sft

1.8 M.S Cover in slab of tanks.


tank 4x4x4 (1.5x1.5)
Sub Total

2
2 No

CAPITAL COST OF DRINKING WATER SUPPLY SCHEME


Schedule of Pipe's

SN

Location

Dia in Inch"

Length in ft'

Remark's

A-B

1.00

40.00 G.I Pipes

B-C

1.00

700.00 G.I Pipes

C-D

0.50

400.00 G.I Pipes

D-E

0.50

300.00 G.I Pipes

C-F

0.75

200.00 G.I Pipes

F-G

0.50

100.00 G.I Pipes

F-H

0.75

250.00 G.I Pipes

H-I

0.50

150.00 G.I Pipes

J-K

0.50

150.00 G.I Pipes

10

L-M

0.50

40.00 G.I Pipes

11

M-N

0.50

150.00 G.I Pipes

12

C-O

0.75

200.00 G.I Pipes

13

P-Q

0.75

500.00 G.I Pipes

14

Q-R

0.75

280.00 G.I Pipes

15

R-S

0.50

600.00 G.I Pipes

16

S-T

0.50

300.00 G.I Pipes

17

U-V

0.75

100.00 G.I Pipes

18

W-X

0.50

120.00 G.I Pipes

19

X-Y

0.50

240.00 G.I Pipes

20

V-K'

0.50

400.00 G.I Pipes

21

K'-L'

0.50

200.00 G.I Pipes

22

Z-A'

0.50

40.00 G.I Pipes

23

B'-C'

0.50

20.00 G.I Pipes

24

D'-E'

0.50

80.00 G.I Pipes

25

D'-F'

0.50

20.00 G.I Pipes

26

G'-H'

0.50

80.00 G.I Pipes

27

I'-J'

0.50

300.00 G.I Pipes

Dia of Pipe
1"

G.I Pipe

HDPE Pipe
740.00

3/4"

1530.00

1/2"

3690.00