1) The document provides calculations to design a trapezoidal drainage channel for a 37.07 acre commercial site after construction is finished. 2) Key results of the calculations include a normal flow depth of 1.191m, a critical depth of 1.084m, and dimensions of the trapezoidal channel shape. 3) A cost estimate of RM7,106 is provided for excavation and concrete lining of the 200m long channel based on unit costs.

Uploaded by

Husnina Fakhira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
145 views9 pages

Calculation For Hydrology BFC32002

1) The document provides calculations to design a trapezoidal drainage channel for a 37.07 acre commercial site after construction is finished. 2) Key results of the calculations include a normal flow depth of 1.191m, a critical depth of 1.084m, and dimensions of the trapezoidal channel shape. 3) A cost estimate of RM7,106 is provided for excavation and concrete lining of the 200m long channel based on unit costs.

Uploaded by

Husnina Fakhira
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

CALCULATION

For after construction is finished, the site will turned to commercial place.
Calculation (after construction):

Qpeak=

CiA
360

DETAILS:
C=0.90, i=100m/h (duration for 30 minutes),
A= 37.07 acers
1 acers= 0.405 hectare (ha)
A=37.07 x 0.405 = 15.01335 acers
Qpeak=

( 0.90 ) (100)(15.01335)
360

= 3.75 m3/s

SUGGESTED DESIGN:

Shape : Trapezoidal shape


Lining : Concrete (rough finish)
Base : 0.8 m (since width cannot exceed 1m)
z: 0.5
Angle : 63.43
S0 : 0.005m

To design the shape and calculate the normal depth, we assume the Qpeak to be larger than
3.75 m3/s, which is 4 m3/s.

SELECTION OF S0
S0 = 0.005 m
x
=0.005 m
1000

x = 5 m for every 1000 m drop.

Gradient = 5
Gradient =

y0 y1
x0 x 1

Tan = 5
Tan-1 (5) =
= 78.69
The water is able to flow since the angle is greater than 10.

CALCULATING NORMAL DEPTH

1+ z 2

A = By0 + zy02

P = B +2y0

A= 0.8y0 + 0.5y02

P = 0.8 + 2y0
P = 0.8 +

1+(0.5)2

5 y0

A
R= P

R=

0.8 y + 0.5 y
0.8+ 5 y

By using Mannings equation:


2

1
A R 3 S0
n

Q=

A R

2
3

Qn
S0
2

0.8 y+ 0.5 y
(0.8y0 + 0.5y02) ( 0.8+ 5 y )
2

( 4 )(0.018)
0.005

(0.8 y 0 +0.5 y 0) 3
2
2 3
0

(0.8 y 0 + 5 y )

= 1.018

By using trial and error method:


y0

Qn
S0

1
2
1.5
1.4
1.2
1.1
1.18
1.19
1.1905

0.7385
2.7915
1.5790
1.3827
1.0332
0.8790
1.001
1.017
1.018

Thus, y 1.1905 1.191 m.


Thus, the height of design must exceed 1.191m.

BEFORE AND DURING CONSTRUCTION


We assumed the construction site is a forest cover, based on our observation on the topographical
map.
n = 0.30

By using Mannings equation:


2

Q=

1
A R 3 S0
n

(1.2)2
2
( 0.8 ) ( 1.2 )+ ( 0.5 ) (1.2 )
( 0.80 ) ( 1.2 )+(0.5)[
]
(
)
( 1.2 )
0.8+

5
Q=

0.30
Q=

1
( 1.68 ) 0.615 0.005
0.30

Q = 0.243 m3/s

Qbefore Qdesign

Thus, this channel will able to carry both flow, before and after construction. There will be no
spillways occur at the drain.

Assuming the discharge is 4m3/s;


y0 = 1.19m

FIND CRITICAL DEPTH


Ac = Byc + zyc2
Ac = 0.8yc + 0.5yc2

Tc = B + 2yz
Tc = 0.8 + (2)(0.5)z
Tc = 0.8 + yc

Using formula,
(0.8 y c + 0.5 y 2c )3
(0.8+ y c )

A 3c Q 2
=
Tc g

42
9.81

= 1.631

Q2
g

yc
1
1.1
1.08
1.084

1.221
1.724
1.612
1.634

yc 1.084 m

CALCULATION TO FIND E0 and Emin


E0 =

Q2
y0+
2
2gA
Q = 4m3/s

y0 = 1.19 m
A= By0 + zy02
A = (0.8)(1.19) + (0.5)(1.19)2
A=1.6605 m2

4
E0 = 1.19+ (2)(9.81)(1.6605)2

= 1.48576 m

Emin =

yc+

Q
2
2 g Ac
Q = 4 m3/s

yc = 1.084 m
A= Byc + zyc2
A = (0.8)(1.084) + (0.5)(1.084)2
A=1.4547 m2
2

4
Emin = 1.084+ (2)(9.81)(1.4547)2

= 1.4694 m

Assuming H is 50% from the height of the drain :


H = (0.5)(1.2) = 0.6m
Hmin = E0 - Emin
= 1.48576 1.4694
= 0.0164 m
H Hmin = 0.6 0.016
y0 yc = 1.19 1.084

Backflow of water will happen


The sediment must not exceed 0.0164m or else backflow of water will happen.

CALCULATION OF y1 and y2
H + Emin = E1,3
E1,3 = 1.4694 + 0.6
= 2.0694m

E1,3 =

Q
y 1,3 +
2
2 g A1,3

2.6094 =

y 1,3 +

4
2 2
(2)(9.81)( 0.8 y 1,3+ 0.5 y 1,3)

By using trial and error method:


For y3 :
y3
1.0
2.0
2.1
2.01
2.008

E3
1.483
2.063
2.154
2.072
2.070

y1
0.5
0.6
0.67
0.68
0.676
0.673

E1
3.459
2.472
2.080
2.037
2.054
2.070

y3 2.008 m

For y1:

y1 0.673 m

ESTIMATION OF COST
Assuming the length of the channel is 200m, the excavation cost is RM 4/m3 and lining cost is
RM5/m2.
Volume of excavation = Area channel x Length
= 1.68 m2 x 200
= 336 m3
Cost excavation = 336 x RM4 = RM1344

Area of lining = Perimeter channel x Length


= (0.5 + 0.8 + 0.5 + 0.8 + 2(1.581)) x (200)
= 1152.4 m2
Cost lining = 1152.4 x RM5 = RM 5762

Total cost = RM 1344 + RM 5762 = RM7106

JUSTIFICATION OF DESIGN
Q=AV
Q= 4m3/s, A=1.66m2
V=2.41m/s

For recommended limit velocity, since we are using hard lined channel, the limit velocity is
4m/s

Vdesign<Vrecommended limit
Thus, the flow in the channel does not exceed the recommended limit.