Project Hdpe Pipe Bore Length

This document provides details for a 103 meter bore project along King Abdullag Road to install four 160mm HDPE pipes. It lists 25 rods used in the bore, each 4.3 meters in length, along with the slope, slope change, depth, and ground readings for each rod. The bore started at a depth of -1.5 meters and ended at -2.45 meters.

Uploaded by

mzahidb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
27 views1 page

Project Hdpe Pipe Bore Length

This document provides details for a 103 meter bore project along King Abdullag Road to install four 160mm HDPE pipes. It lists 25 rods used in the bore, each 4.3 meters in length, along with the slope, slope change, depth, and ground readings for each rod. The bore started at a depth of -1.5 meters and ended at -2.45 meters.

Uploaded by

mzahidb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT

HDPE PIPE
BORE LENGTH

KING ABDULLAG ROAD


4x160MM
103 METER

ROD
NO.

ROD
LENGTH

SLOPE

SLOPE
CHANGE

DEPTH

GROUND

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3
4.3

-20 %
-16 %
-14 %
-14 %
-14 %
-12 %
-10 %
-8 %
-6 %
-2 %
0%
0%
0%
0%
4%
6%
6%
6%
6%
6%
8%
8%
8%
8%
8%

0%
20 %
12.5 %
0%
0%
14%
17 %
20 %
25 %
67%
0%
0%
0%
0%
0%
50 %
0%
0%
0%
0%
33 %
0%
0%
0%
0%

-1.50
-2.35
-3.05
-3.65
-4.30
-4.80
-5.25
-5.60
-5.85
-6.00
-6.00
-6.00
-6.00
-6.00
-5.85
-5.45
-5.10
-4.80
-4.50
-4.20
-3.85
-3.50
-3.15
-2.80
-2.45

-1.5
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
-2.45

START BORE

END BORE

Series1
Series2

ROD