This document reports the results of a hammer test (also known as a hammer rebound test) conducted on 10 concrete cylinder samples. Key information includes: - The average compressive strength of the concrete was determined to be 499.98 kg/cm2. - The standard deviation of the results was calculated to be 336.80 kg/cm2. - Details are provided on the hammer rebound values and calculated compressive strengths for each of the 10 samples tested.

Uploaded by

Astrie Nurwulan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
92% found this document useful (13 votes)
14K views4 pages

Excel Hammer Test

This document reports the results of a hammer test (also known as a hammer rebound test) conducted on 10 concrete cylinder samples. Key information includes: - The average compressive strength of the concrete was determined to be 499.98 kg/cm2. - The standard deviation of the results was calculated to be 336.80 kg/cm2. - Details are provided on the hammer rebound values and calculated compressive strengths for each of the 10 samples tested.

Uploaded by

Astrie Nurwulan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

UJI PALU BETON (HAMMER TEST)

(SNI 03-4430-1990/ASTM C.805-97)


Laporan/ No. Order
Lokasi/ Site
Nomor Surat Laporan
Jumlah Titik Uji
Pemberi Tugas
Jumlah Lantai
Proyek

Type/Jenis
No. Seri Alat

:
: Lab Uji Bahan POLBAN
:
: 10
: Ahmad Zulpanani, ST.,MT
:1
:-

N-34
94939
64
66
62
64

Kalibrasi Alat

63.6
80
1.258

Rata - Rata
Standar
Angka Koreksi

Nama Struktur
Jenis Elemen
Kode Bidang Uji/ Sampel

k1

k2

k3

Sudut Inklinasi Pukulan

0o

0o

0o

0o

0o

35

37

36

40

40

40

36

33

44

38

36

42

40

36

3
4
Nilai Lenting Palu Beton (R) 5
6
7
8
9
10
R Rata-rata
R Rata-rata Terkoreksi Alat
Koreksi Non Horizontal
R Rata-rata Terkoreksi

35
35
35
31
40
34
38
35
35.1
44.2

45
44
42
40
43
44
42
39
42.0
52.8

38
34
34
34
38
42
38
40
37.2
46.8

38
38
42
38
38
42
44
40
39.6
49.8

40
38
38
36
38
40
38
38
38.8
48.8

46
38
44
44
38
38
36
44
40.8
51.3

36
38
36
36
36
38
42
32
36.6
46.0

44.2

51.3

46.0

Maksimum, (kg/cm2)

491.0

52.8
46.8
49.8
48.8
Perkiraan Kuat Tekan Beton
659.7
542.0 600.3
580.4

629.5

526.9

Minimum, (kg/cm2)

416.8

580.9

466.2

523.5

504.4

552.2

451.8

Rata-rata,( kg/cm2)

453.9

620.3

504.1

561.9

542.4

590.9

489.3

a. Jumlah Benda Uji (n)


c. Konstanta Statistik n<20 bh (k1)
d. Kuat Tekan Rata-Rata fcr

Kolom Selasar Lab Bahan Polban


Kolom
k4
k5
k6
k7

= 10 buah
1.121

b. Konstanta Stat. 5% Cacat (k2)

e. Standar Deviasi (sd)

499.98

N-34
94939
66
62
62

66
62
62

63.6
80
1.258

olban
k8

k9

k10

32

36

29

42

34

28

38
38
34
40
36
38
40
40
37.8
47.6

30
32
32
32
30
32
26
32
31.6
39.8

31
34
32
32
32
31
30
25
30.4
38.2

47.6

39.8

38.2

556.5

408.6

381.4

480.5

336.0

311.1

518.5

372.3

346.3

1.64
88,76 kg/cm2

Angka Koreksi

1.258
mau inter

52.8
51.3

53
52

49.8
48.8
47.6
46.8
46.0
44.2
39.8
38.2

51
50
49
48
47
46
45
44
43
42
41
40
39
38

maks (kg/cm2min (kg/cm2)

DATA PERHITUNGAN KUAT TEKAN HASIL PERCOBAAN HAMM

663
643

584
565

623
604
584
565
546
526
507
488
469
450
432
413
395
377

546
527
508
489
470
451
432
414
395
370
359
340
324
307

Kode
Sample
k1
k2
k3
k4
k5
k6
k7
k8
k9
k10

fcr

fci

(fcr - fci )

453.9
620.3
504.1
561.9
542.4
590.9
489.3
518.5
372.3
346.3
4999.8
499.98

46.1
-120.3
-4.1
-61.9
-42.4
-90.9
10.6
-18.5
127.7
153.7

STANDAR DEVIASI
fcr

336.80

SIL PERCOBAAN HAMMER TES

(
) ^2
2,125.1
14,477.1
16.6
3,837.4
1,799.2
8,259.8
113.3
342.8
16,303.1
23,631.4
70905.8

88.760