List Drawing - Uip Vii
List Drawing - Uip Vii
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
I GENERAL
1 Contractor's Organization Chart A3 FI IBRDL1-AA-P-101-01
2 Schedules
2.1 Time Schedule A3 FI IBRDL1-AA-P-102-01
2.2 Disbursement Schedule A3 FI IBRDL1-AA-P-102-02
3 Inspection & Test Plan
3.1 ITP Circuit Breaker A4 FR IBRDL1-AA-P-103-01
3.2 ITP Disconnecting Switch A4 FR IBRDL1-AA-P-103-02
3.4 ITP Current Transformer Trench A4 FR IBRDL1-AA-P-103-04
3.6 ITP Surge Arrester A4 FR IBRDL1-AA-P-103-06
3.7 ITP Neutral Earthing Resistor A4 FR IBRDL1-AA-P-103-07
3.8 ITP Busbar and Earthing Conductors A4 FR IBRDL1-AA-P-103-08
3.10 ITP MV 24 kV Power Cable A4 FR IBRDL1-AA-P-103-10
3.11 ITP Low Voltage Power and Control Cable A4 FR IBRDL1-AA-P-103-11
3.13 ITP Disc Insulator A4 FR IBRDL1-AA-P-103-13
3.14 ITP HV Connector and Hardware A4 FR IBRDL1-AA-P-103-14
3.15 ITP Steel Structure A4 FR IBRDL1-AA-P-103-15
3.16 ITP MV Switchgear A4 FR IBRDL1-AA-P-103-16
3.19 ITP Relay Control Panel & SAS Siemens A4 FR IBRDL1-AA-P-103-19
3.20 ITP Relay Control Panel & SAS NARI A4 FR IBRDL1-AA-P-103-20
5 Vendor List A4 FR IBRDL1-AA-P-105-01
7 List Of Drawing A3 FI IBRDL1-AA-P-107-01
Last Drawin
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
II CALCULATION NOTE
1 General
1.1 Current Transformer Calculation F A4 FA IBRDL1-SY-E-02-201-01 1
V TECHNICAL SPECIFICATION
1 Circuit Breaker
1.3 245 kV Circuit Breaker Three Pole Operation LTB 245E1; 50 kA 4000 A 31 mm/kV - Sby Selatan F A4/A3 FA IBRDL1-SY-E-00-501-03 2
1.4 170 kV Circuit Breaker Three Pole Operation LTB 170E1; 50 kA 4000 A 25 mm/kV - New Kediri F A4/A3 FA IBRDL1-SY-E-00-501-04 1
2 Disconnector Switch
2.1 Disconnecting Switch SGF 170p125 2500 A; 50 kA; 31 mm/kV F A4/A3 FA IBRDL1-SY-E-00-502-01 1
2.3 Disconnecting Switch SGF 170p125 2500 A; 50 kA; 25 mm/kV F A4/A3 FA IBRDL1-SY-E-00-502-03 1
3 Current Transformer
3.3 170 kV Current Transformer TYPE-C_TRENCH_NEW KEDIRI F A4/A3 FA IBRDL1-SY-E-00-503-03 1
3.5 170 kV Current Transformer TYPE_E_TRENCH_SURABAYA SELATAN F A4/A3 FA IBRDL1-SY-E-00-503-05 1
Last Drawin
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
5 Lightning Arrester
5.1 Lightning Arrester 10 kA (Class-3) CD 5895 mm PEXLIM Q132-XV170_SURABAYA SELATAN F A4/A3 FA IBRDL1-SY-E-00-505-01 2
5.2 Lightning Arrester 10 kA (Class-3) CD 4540 mm PEXLIM Q132-XH170_NEW KEDIRI F A4/A3 FA IBRDL1-SY-E-00-505-02 2
6 Neutral Earthing Resistor
6.2 Stainless Steel NGR 20 kV 500 Ohm 30 sec F A4/A3 FA IBRDL1-SY-E-00-506-02 0
6.3 Stainless Steel NGR 20 kV 40 Ohm 30 sec F A4/A3 FA IBRDL1-SY-E-00-506-03 2
7 Neutral Current Transformer
7.1 NCT for 150 kV Neutral 300-150/1 A Class X - Ring type F A4/A3 FA IBRDL1-SY-E-00-507-01
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
VIII Others
Last Drawin
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
APPROVAL Submit Received Status Submit Received Status Submit Received Status
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Last Drawing Status 1st Submission 2nd Submission 3rd Submission
APPROVAL Submit Received Status Submit Received Status Submit Received Status
0
0
A 4-Feb-16 18-Mar-16 A
A 4-Feb-16 18-Mar-16 A
APPROVAL Submit Received Status Submit Received Status Submit Received Status
A 4-Feb-16 18-Mar-16 A
C 4-Feb-16 18-Mar-16 C 1-Jun-16
A 4-Feb-16 18-Mar-16 A
0
0 1-Jun-16
0 1-Jun-16
A 12-May-16 23-May-16 A
0 1-Jun-16
APPROVAL Submit Received Status Submit Received Status Submit Received Status
0 1-Jun-16
0 1-Jun-16
0
0
0
0
0
0
Last Drawing Status 1st Submission 2nd Submission 3rd Submission
APPROVAL Submit Received Status Submit Received Status Submit Received Status
Rev. 02
Last Drawin
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
I GENERAL
1 Contractor's Organization Chart A3 FI IBRDL1-AA-P-101-01
2 Schedules
2.1 Time Schedule A3 FI IBRDL1-AA-P-102-01
2.2 Disbursement Schedule A3 FI IBRDL1-AA-P-102-02
4 Progress Report
4.1 Progress Report M1 A4/A3 FI IBRDL1-AA-P-104-01
4.2 Progress Report M2 A4/A3 FI IBRDL1-AA-P-104-02
4.3 Progress Report M3 A4/A3 FI IBRDL1-AA-P-104-03
4.4 Progress Report M4 A4/A3 FI IBRDL1-AA-P-104-04
4.5 Progress Report M5 A4/A3 FI IBRDL1-AA-P-104-05
4.6 Progress Report M6 A4/A3 FI IBRDL1-AA-P-104-06
4.7 Progress Report M7 A4/A3 FI IBRDL1-AA-P-104-07
4.8 Progress Report M8 A4/A3 FI IBRDL1-AA-P-104-08
4.9 Progress Report M9 A4/A3 FI IBRDL1-AA-P-104-09
4.10 Progress Report M10 A4/A3 FI IBRDL1-AA-P-104-10
4.11 Progress Report M11 A4/A3 FI IBRDL1-AA-P-104-11
4.12 Progress Report M12 A4/A3 FI IBRDL1-AA-P-104-12
4.13 Progress Report M13 A4/A3 FI IBRDL1-AA-P-104-13
4.14 Progress Report M14 A4/A3 FI IBRDL1-AA-P-104-14
4.15 Progress Report M15 A4/A3 FI IBRDL1-AA-P-104-15
4.16 Progress Report M16 A4/A3 FI IBRDL1-AA-P-104-16
4.17 Progress Report M17 A4/A3 FI IBRDL1-AA-P-104-17
4.18 Progress Report M18 A4/A3 FI IBRDL1-AA-P-104-18
5 Sub-Contractor/Vendor List A4 FR IBRDL1-AA-P-105-01
6 Soil Investigation Reports
6.18 Soil Investigation Report Site Surabaya Selatan S/S A4 FR IBRDL1-AA-P-106-18
7 List Of Drawing A3 FR IBRDL1-AA-P-107-01
Rev. 02
Last Drawin
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
II CALCULATION NOTE
2 Steel Structure Statical Calculation:
2.2 Gantry and Beam 50 kA Inclined Type L A4 FA IBRDL1-SS-S-02-202-02 0
2.4 Apparatus Supports 50 Ka (DS, CT, LA) L A4 FA IBRDL1-SS-S-02-202-04 1
3 Shallow Foundation Calculation
3.1 New 60 MVA Power Transformer Foundation L A4 FA IBRDL1-SS-S-02-203-01 0
3.2 Apparatus Support Foundations L A4 FA IBRDL1-SS-S-02-203-02 1
3.3 Gantry Foundations Inclined Type L A4 FA IBRDL1-SS-S-02-203-03 1
5 Oil Pit L A4 FA IBRDL1-SS-S-02-205-01
Last Drawin
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
VIII Others
Last Drawin
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Last Drawing Status 1st Submission 2nd Submission 3rd Submission
A 2-Dec-15 22-Jan-16 A
A 2-Dec-15 22-Jan-16 C 22-Feb-16 8-Mar-16 A
A 22-Feb-16 8-Mar-16 A
A 2-Dec-15 22-Jan-16 C 22-Feb-16 8-Mar-16 A
A 2-Dec-15 22-Jan-16 B 22-Feb-16 8-Mar-16 A
0
A 22-Feb-16 8-Mar-16 A
0 1-Jun-16
0 1-Jun-16
A 12-May-16 14-Jun-16 A
C 12-May-16 14-Jun-16 C
A 22-Feb-16 8-Mar-16 A
A 22-Feb-16 8-Mar-16 A
Last Drawing Status 1st Submission 2nd Submission 3rd Submission
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
I GENERAL
1 Contractor's Organization Chart A3 FI IBRDL1-AA-P-101-01
2 Schedules
2.1 Time Schedule A3 FI IBRDL1-AA-P-102-01
2.2 Disbursement Schedule A3 FI IBRDL1-AA-P-102-02
4 Progress Report
4.1 Progress Report M1 A4/A3 FI IBRDL1-AA-P-104-01
4.2 Progress Report M2 A4/A3 FI IBRDL1-AA-P-104-02
4.3 Progress Report M3 A4/A3 FI IBRDL1-AA-P-104-03
4.4 Progress Report M4 A4/A3 FI IBRDL1-AA-P-104-04
4.5 Progress Report M5 A4/A3 FI IBRDL1-AA-P-104-05
4.6 Progress Report M6 A4/A3 FI IBRDL1-AA-P-104-06
4.7 Progress Report M7 A4/A3 FI IBRDL1-AA-P-104-07
4.8 Progress Report M8 A4/A3 FI IBRDL1-AA-P-104-08
4.9 Progress Report M9 A4/A3 FI IBRDL1-AA-P-104-09
4.10 Progress Report M10 A4/A3 FI IBRDL1-AA-P-104-10
4.11 Progress Report M11 A4/A3 FI IBRDL1-AA-P-104-11
4.12 Progress Report M12 A4/A3 FI IBRDL1-AA-P-104-12
4.13 Progress Report M13 A4/A3 FI IBRDL1-AA-P-104-13
4.14 Progress Report M14 A4/A3 FI IBRDL1-AA-P-104-14
4.15 Progress Report M15 A4/A3 FI IBRDL1-AA-P-104-15
4.16 Progress Report M16 A4/A3 FI IBRDL1-AA-P-104-16
4.17 Progress Report M17 A4/A3 FI IBRDL1-AA-P-104-17
4.18 Progress Report M18 A4/A3 FI IBRDL1-AA-P-104-18
5 5 Sub-Contractor/Vendor List A4 FR IBRDL1-AA-P-105-01
6 Soil Investigation Reports
6.19 Soil Investigation Report Site New Kediri S/S A4 FR IBRDL1-AA-P-106-19
6 7 List Of Drawing A3 FR IBRDL1-AA-P-107-01
Last Drawin
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
II CALCULATION NOTE
2 Steel Structure Statical Calculation:
2.2 Gantry and Beam 50 kA Inclined Type L A4 FA IBRDL1-SS-S-02-202-02 0
2.4 Apparatus Supports 50 kA (DS, CT, LA) L A4 FA IBRDL1-SS-S-02-202-04 1
3 Shallow Foundation Calculation
3.1 New 60 MVA Power Transformer Foundation L A4 FA IBRDL1-SS-S-02-203-01 0
3.2 Apparatus Support Foundations (CB, CT, LA, DS) L A4 FA IBRDL1-SS-S-02-203-02 1
3.3 Gantry Foundations Inclined Type L A4 FA IBRDL1-SS-S-02-203-03 1
5 Oil Pit L A4 FA IBRDL1-SS-S-02-205-01
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
VIII Others
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
REV.
APPROVAL Submit Received Status Submit Received Status Submit Received Status
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Last Drawing Status 1st Submission 2nd Submission 3rd Submission
APPROVAL Submit Received Status Submit Received Status Submit Received Status
A 2-Dec-15 22-Jan-16 A
A 2-Dec-15 22-Jan-16 C 22-Feb-16 8-Mar-16 A
A 22-Feb-16 8-Mar-16 A
A 2-Dec-15 22-Jan-16 C 22-Feb-16 8-Mar-16 A
A 2-Dec-15 22-Jan-16 B 22-Feb-16 8-Mar-16 A
0
A 22-Feb-16 8-Mar-16 A
APPROVAL Submit Received Status Submit Received Status Submit Received Status
A 22-Feb-16 8-Mar-16 A
A 2-Dec-15 15-Dec-15 B 22-Feb-16 8-Mar-16 A
A 2-Dec-15 15-Dec-15 B 22-Feb-16 8-Mar-16 A
C 12-May-16 14-Jun-16 C
A 22-Feb-16 8-Mar-16 A
A 22-Feb-16 8-Mar-16 A
A 22-Feb-16 8-Mar-16 A
A 22-Feb-16 8-Mar-16 A
A 22-Feb-16 8-Mar-16 A
A 22-Feb-16 8-Mar-16 A
Last Drawing Status 1st Submission 2nd Submission 3rd Submission
APPROVAL Submit Received Status Submit Received Status Submit Received Status
DOC. SIZE
STATUS
Contractor's Drawing
No. Description L/F
No.
PIC / Vendor
I GENERAL
1 Contractor's Organization Chart A3 FI IBRDL1-AA-P-101-01 PM
2 Schedules
2.1 Time Schedule A3 FI IBRDL1-AA-P-102-01 PM
2.2 Disbursement Schedule A3 FI IBRDL1-AA-P-102-02 PM
4 Progress Report
4.1 Progress Report M1 A4/A3 FI IBRDL1-AA-P-104-01 PM
4.2 Progress Report M2 A4/A3 FI IBRDL1-AA-P-104-02 PM
4.3 Progress Report M3 A4/A3 FI IBRDL1-AA-P-104-03 PM
4.4 Progress Report M4 A4/A3 FI IBRDL1-AA-P-104-04 PM
4.5 Progress Report M5 A4/A3 FI IBRDL1-AA-P-104-05 PM
4.6 Progress Report M6 A4/A3 FI IBRDL1-AA-P-104-06 PM
4.7 Progress Report M7 A4/A3 FI IBRDL1-AA-P-104-07 PM
4.8 Progress Report M8 A4/A3 FI IBRDL1-AA-P-104-08 PM
4.9 Progress Report M9 A4/A3 FI IBRDL1-AA-P-104-09 PM
4.10 Progress Report M10 A4/A3 FI IBRDL1-AA-P-104-10 PM
4.11 Progress Report M11 A4/A3 FI IBRDL1-AA-P-104-11 PM
4.12 Progress Report M12 A4/A3 FI IBRDL1-AA-P-104-12 PM
4.13 Progress Report M13 A4/A3 FI IBRDL1-AA-P-104-13 PM
4.14 Progress Report M14 A4/A3 FI IBRDL1-AA-P-104-14 PM
4.15 Progress Report M15 A4/A3 FI IBRDL1-AA-P-104-15 PM
4.16 Progress Report M16 A4/A3 FI IBRDL1-AA-P-104-16 PM
4.17 Progress Report M17 A4/A3 FI IBRDL1-AA-P-104-17 PM
4.18 Progress Report M18 A4/A3 FI IBRDL1-AA-P-104-18 PM
5 5 Sub-Contractor/Vendor List A4 FR IBRDL1-AA-P-105-01 PM
6 Soil Investigation Reports
6.20 Soil Investigation Report Site Amlapura S/S A4 FR IBRDL1-AA-P-106-20 Vendor
6 7 List Of Drawing A3 FR IBRDL1-AA-P-107-01 PM
STATUS
Contractor's Drawing
No. Description L/F
No.
PIC / Vendor
VIII Others
STATUS
Contractor's Drawing
No. Description L/F
No.
PIC / Vendor
Internal Completion Date Last Drawing Status 1st Submission 2nd Submission
Target Check Remark REV. APPROVAL Submit Received Status Submit Received Status
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
15-Apr-16 OK 0
Internal Completion Date Last Drawing Status 1st Submission 2nd Submission
Target Check Remark REV. APPROVAL Submit Received Status Submit Received Status
15-Apr-16 OK 0
15-Apr-16 OK 0 B 2-Dec-15 15-Dec-15 B
0
0
15-Apr-16 OK 0 B 2-Dec-15 15-Dec-15 B
15-Apr-16 OK 0
12 12
For Internal only
Internal Completion Date Last Drawing Status 1st Submission 2nd Submission
Target Check Remark REV. APPROVAL Submit Received Status Submit Received Status
3rd Submission
STATUS
Contractor's Drawing
No. Description L/F
No.
PIC / Vendor
I GENERAL
1 Contractor's Organization Chart A3 FI IBRDL1-AA-P-101-01 PM
2 Schedules
2.1 Time Schedule A3 FI IBRDL1-AA-P-102-01 PM
2.2 Disbursement Schedule A3 FI IBRDL1-AA-P-102-02 PM
4 Progress Report
4.1 Progress Report M1 A4/A3 FI IBRDL1-AA-P-104-01 PM
4.2 Progress Report M2 A4/A3 FI IBRDL1-AA-P-104-02 PM
4.3 Progress Report M3 A4/A3 FI IBRDL1-AA-P-104-03 PM
4.4 Progress Report M4 A4/A3 FI IBRDL1-AA-P-104-04 PM
4.5 Progress Report M5 A4/A3 FI IBRDL1-AA-P-104-05 PM
4.6 Progress Report M6 A4/A3 FI IBRDL1-AA-P-104-06 PM
4.7 Progress Report M7 A4/A3 FI IBRDL1-AA-P-104-07 PM
4.8 Progress Report M8 A4/A3 FI IBRDL1-AA-P-104-08 PM
4.9 Progress Report M9 A4/A3 FI IBRDL1-AA-P-104-09 PM
4.10 Progress Report M10 A4/A3 FI IBRDL1-AA-P-104-10 PM
4.11 Progress Report M11 A4/A3 FI IBRDL1-AA-P-104-11 PM
4.12 Progress Report M12 A4/A3 FI IBRDL1-AA-P-104-12 PM
4.13 Progress Report M13 A4/A3 FI IBRDL1-AA-P-104-13 PM
4.14 Progress Report M14 A4/A3 FI IBRDL1-AA-P-104-14 PM
4.15 Progress Report M15 A4/A3 FI IBRDL1-AA-P-104-15 PM
4.16 Progress Report M16 A4/A3 FI IBRDL1-AA-P-104-16 PM
4.17 Progress Report M17 A4/A3 FI IBRDL1-AA-P-104-17 PM
4.18 Progress Report M18 A4/A3 FI IBRDL1-AA-P-104-18 PM
5 5 Sub-Contractor/Vendor List A4 FR IBRDL1-AA-P-105-01 PM
6 Soil Investigation Reports
6.21 Soil Investigation Report Site Nusa Dua/Sanur S/S A4 FR IBRDL1-AA-P-106-21 Vendor
6 7 List Of Drawing A3 FR IBRDL1-AA-P-107-01 PM
STATUS
Contractor's Drawing
No. Description L/F
No.
PIC / Vendor
VIII Others
Internal Completion Date Last Drawing Status 1st Submission 2nd Submission
Target Check Remark REV. APPROVAL Submit Received Status Submit Received Status
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
Internal Completion Date Last Drawing Status 1st Submission 2nd Submission
Target Check Remark REV. APPROVAL Submit Received Status Submit Received Status
0
0
0
0
0
0
15-Apr-16 OK 0
5 5
3rd Submission
4
5
6
7
8
9
10
11
12
13
14
Received By
(
TABLE OF CONTENT
CIVIL SURABAYA SELATAN
NO.
1
2
Received By
(
TABLE OF CONTENT
ELECTRICAL/MECHANICAL
DOCUMENT TITLE
24KV METALCLAD SWITCHGEAR SINGLE LINE DIAGRAM & GENERAL ARRANGEMENT -
SURABAYA SELATAN S/S
TECHNICAL SPECIFICATION 20KV NEUTRAL GROUNDING RESISTOR; 40 OHM; 30 SEC.
Received By
)
TABLE OF CONTENT
CIVIL SURABAYA SELATAN
DOCUMENT TITLE
STEEL STRUCTURE - GANTRY 18 METERS INCLINED TYPE - GI SURABAYA SELATAN
STEEL STRUCTURE - BEAM 14 METERS STRAIGHT TYPE - GI SURABAYA SELATAN
Received By
)
AL
DOCUMENT NUMBER REV.
IBRDL1-SS-E-00-509-15 2
IBRDL1-SY-E-00-506-03 1
IBRDL1-SY-E-00-511-01 0
IBRDL1-SS-E-00-512-01 0
IBRDL1-SY-E-00-515-01 0
IBRDL1-SY-E-00-718-01 0
IBRDL1-SY-E-00-719-01 0
IBRDL1-SY-E-00-518-01 1
IBRDL1-SY-E-00-518-03 1
IBRDL1-SY-E-00-518-04 1
IBRDL1-SY-E-00-518-05 1
IBRDL1-SY-E-00-518-06 1
IBRDL1-SY-E-00-518-07 1
IBRDL1-SY-E-00-518-08 1
AN
DOCUMENT NUMBER REV.
IBRDL1-SY-S-74-322-11 0
IBRDL1-SY-S-74-334-11 0