INTERNATIONAL MARINE WORKS
Debris Removal for GG P/F
North West Side
Client: GPC
JOB NO.
ALEX/GPC/15/82
Job carried out:
From
5th January 2016
To
27th January 2016
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
THE GENERAL PETROLUEM COMPANY
Debris Removal Report
for GG P/F North West Side
For
Rig / ADMARINE III
Job carried out
from 5th January 2015
to 27th January 2015
JOB NO. ALEX/GPC/15/82
BY
INTERNATIONAL MARINE WORKS
-1-
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Table of Contents
1. Introduction.
2. List of Abbreviations.
3. Personnel & Equipment.
3.1 Personnel.
3.2 Equipment.
4. Scope of work.
5. Results.
6. Sketch.
7. Debris Table
8. Photos.
9. Attachments.
-2-
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
1- Introduction
-3-
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
1- Introduction
Date : 27/12/2015.
Client : GPC.
Location : GG P/F.
Job. No. : ALEX/GPC/14/80.
Subject : Debris removal from seabed at GG P/F.
Dear Sir,
As per clients instructions, International Marine Works, ROV Team and Diving
team carried out a Debris Removal from seabed at GG P/F for RIG / ADMARINE III.
The ROV and Diving Operation was carried out to cover all the required scope of
work as E-mail with date : 11-01-2016
The ROV operation was carried out from "M/V INW-1"
The Diving operation was carried out from "M/V Misr Gulf 15"
Hoping that our work and this report meet your satisfaction.
If you have any inquiry, dont hesitate to contact the undersigned.
ROV Supervisor Diving Supervisor
WALEED GHARBIA Mohamed Khalil
-4-
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
2- List of Abbreviations
-5-
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
2-List of Abbreviations
Abbreviations Description
GPC THE GENERAL PETROLUEM COMPANY
I.M.W International Marine Works
ROV Remotely Operated Vehicle
P/F Platform
STBD Starboard Side
PORT Port Side
AC Alternating Current
DC Direct Current
CPU Central Processing Unit
USB Universal Serial Bus
Nautical Terminology
Bow Front side of vehicle
Stern Back side of vehicle
Starboard Right side of vehicle
Port Side Left side of vehicle
-6-
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
3- Personnel & Equipment
-7-
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
3- Personnel & Equipment
3.1 Personnel:-
ROV Services as per contract + Additional ROV team.
Diving Services as per contract + Additional Diving team.
3.2 Equipment:-
ROV Services as per contract.
Diving Services as per contract + A-Frame + Air Tagger Winch.
Seaeye Tiger 1000 ROV
-8-
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Seaeye Tiger
Specifications
Dimensions & Weights:
Length 1030mm
Width 700mm
Height 590mm
Weight (in air) 150kg
Payload 32kg
Depth rating 600msw & 1000msw
Propulsion System:
The vehicle is propelled by five SM 4M brushless DC thrusters.
Forward 62kgf
Vertical 22kgf
Lateral 43kgf
Thruster configuration: four horizontal vectored, One vertical with velocity feedback
providing full three dimensional control.
Optics & Lighting:
Format SVHS or VHS
Dual video channels switched
Video transmission is via a balanced line driver and screened twisted pair.
Light output (available): 2 x 150W variable intensity
Controls & Sensors:
Gyro, Auto heading: Solid-state rate sensor
Auto heading and depth
Auto stop on new heading
Sonar: Tritech "Seaking"
-9-
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Indications/Sensors:
Video overlay fitted as standard which provides:
Compass rose
Tilt icon
Date and time
Depth and CP data
Vehicle Control System:
16 bit digital system providing easy interfacing for ancillary
Equipment by the operator:
Standard Equipment:
Color and low light b & w cameras mounted on a tilt unit and Scanning sonar. Auto-pilot is a
standard feature incorporating
Both heading and depth as is the sonar. All features interface with a complete video overlay
system. Digital stills capability is available by interfacing the video signal into a topside PC
with video-grab capability.
Additional Equipment:
CP equipment
Electrical Supply Requirements:
380-480V AC three phase 60Hz
- 10 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
4- Scope of Work
- 11 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
4- Scope of Work
Debris removal from seabed at GG P/F.
- 12 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
5- Results
- 13 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
5- Results
a) Water depth varies from - 64 meters to 66.5 meters.
b) Seabed is soft sand and not flat.
c) Surveyed area is a half circle of 150 meters radius.
d) Visibility is poor.
e) The diver conducts underwater debris removal from Seabed survey for direction
North West at GG P/F to remove debris points which had been located by the ROV
&confirm from ADES (T5,T6,T7,T9,T11,T12,T13,T14,T15,T16,T17)
f) Most of the lifted debris had been documented and photographed by digital camera
for documentation and some are dragged outside seabed area location with distance
more than 700 meters away to south east direction.
g) The divers found unplanned debris was buried under seabed while remove marked
debris.
h) No old foot prints were found.
i) Surveyed area clear from any harmful debris except item numbers "1, 2,3,4,8 and
10".
- 14 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
6- Sketch
- 15 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
P/F North Face Heading 330
T8
T4
T3
T1
T2
T10
GG P/F
Sketch not to scale
- 16 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
7- Debris Table
- 17 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
7- Debris Table
Distance
Target from DVD
Bearing Depth DESCRIPTION comment
Center TIME
Platform
T1 330 2m -65.4m 00:03:02 TIRE Not lifted
T2 290 5m -65.3m 00:03:40 Scaffolding ( length aprox :2m x 5m) Not lifted
T3 310 13m -65.3m 00:06:40 Metal pipe (1m aprox) Not lifted
T4 312 13m -65.3m 00:08:11 Tire Not lifted
T5 350 40m -65m 00:12:00 Pointed Metallic pipe (6m aprox) Lifted
T6 352 38m -65m 00:15:20 Metal pipe (1m aprox) Lifted
T7 320 40m -65.9m 00:21:54 Area of Debris Lifted
T8 350 15m -65.9m 00:32:39 Tire Not lifted
T9 360 30m -65.9m 00:36:40 Metallic Objects. Lifted
T 10 280 7m -65m 00:47:33 Tire and Metal gride (2m aprox) Not lifted
T 11 290 25m -65m 00:50:36 Area of Debris Lifted
T 12 300 30m -65m 00:54:56 Area of Debris Lifted
T 13 340 28m -65m 00:59:00 Old metallic fram (1.50m X 3m aprox) Lifted
T 14 350 29m -65m 01:01:40 Tire Lifted
T 15 360 25m -65m 01:16:12 Metal pipe (4m high aprox) Lifted
T 16 330 40m -65m 01:22:46 Metallic beam L shape (1m aprox) Lifted
T 17 355 38m -65m 02:08:20 Area of Debris Lifted
Note:
Please refere to attached E-Mail
- 18 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
8- PHOTOS
- 19 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
7- Photos
T1: Tire
- 20 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T2:Scaffolding
- 21 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T3:Metal Pipe
- 22 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T4:Tire
- 23 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T5: Pointed Metallic pipe
- 24 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T5
- 25 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T5
- 26 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T6:Metal Pipe
- 27 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T6
- 28 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T7: Area of Debris
- 29 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T7
- 30 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T7
- 31 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T7
- 32 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T7
- 33 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T8:Tire
- 34 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T9: Metallic Objects
- 35 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T9
- 36 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T9
- 37 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T9
- 38 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T10:Tire & Metal Gride
- 39 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T11: Area of Debris
- 40 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T11
- 41 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T11
- 42 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T12: Area of Debris
- 43 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T12
- 44 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T12
- 45 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T13:Old Metallic Frame
- 46 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T13
- 47 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T14:Tire
- 48 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T14
- 49 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T15:Metal Pipe
- 50 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T15
- 51 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T16: Metallic Beam L Shape
- 52 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T16
- 53 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T17: Area of Debris
- 54 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T17
- 55 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
Remove T17
- 56 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
T17: Area of Debris
- 57 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
9- Attachment
- 58 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
- 59 -
Debris Removal for GG P/F North West Side
THE GENERAL PETROLUEM COMPANY
- 60 -