Winch Testing Requirements

The document outlines the steps to test a ship's mooring winch, including: 1) Checking identification tags, gear backlash, and load capacity by attaching weights. 2) Testing the winch's speed by timing how long it takes to pull a marker over a fixed distance under load. 3) Checking rpm under loaded and no-load conditions for different speeds. 4) Testing the brake holding force against 80% of the mooring line's maximum breaking load. 5) Checking clutch, brake handle, and dry run operations for proper functioning.

Uploaded by

ksangeeth2000
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
448 views4 pages

Winch Testing Requirements

The document outlines the steps to test a ship's mooring winch, including: 1) Checking identification tags, gear backlash, and load capacity by attaching weights. 2) Testing the winch's speed by timing how long it takes to pull a marker over a fixed distance under load. 3) Checking rpm under loaded and no-load conditions for different speeds. 4) Testing the brake holding force against 80% of the mooring line's maximum breaking load. 5) Checking clutch, brake handle, and dry run operations for proper functioning.

Uploaded by

ksangeeth2000
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Winch testing requirements

Thursday, July 21, 2016

4:59 PM

Illustration Descripti

Identification tags

The first step is to check the various iden


winch - Winch type, Serial number, Manu
motor type, Motor number.

Gear backlash measurement

The gap (backlash) between the two gea


and pinion) is measured in this test. For
placed on a tooth on the pinion wheel (c
motor) and the motor is turned. After on
pinion contacts that of the gear wheel th
thickness corresponding to the gap betw
thickness is measured using a vernier ca
design specification.

In this example the design backlash is 0.


measured thickness is in the range of 0.

Load checking

The winch is rated for a particular loa


is simulated using a weights attached
vertically. The arrangement is shown
the total load on the winch, we must
sheave, . Considering there are thre
and the total weight (W) is related by

In this case,

total weight = 2070 + 2


2028 + 2038 + 246 + 243 + 375 (be
= 0.98
F = 15099 / 0.98 = 160
Speed checking

The winch is rated for a particular speed


checked with load of 16 T (16042 Kg) on
made on the wire rope at a distance of 2
the rope and the time between when the
second mark crossed the rod is measure

From the time (T) the speed in meters pe


T.

In this example the rated speed is 15 m/


as 7.45 sec. So the speed = 120 / 7.45 =

Winch rpm checking

The winch is rated for a particular rpm a


checked for loaded condition and no load
have winches with two speeds. In such c
are conducted: heaving (lower speed, wi
no load), pay out (lower speed, no load),
and pay out (high speed, no load).

The speed is checked up using an rpm g


placed on the warping drum end and the
(see the photo on the left).

In this case for the respective rated spee


rpm for the respective tests (order as ab
10.9, 11.3, 33.2, and 35.1 rpm.

Brake holding test

The brake is the heart of the mooring


and thereby the mooring line at the s
safety device in case the load in the l
rendering and allowing the line to she
MBL or Maximum Breaking Load). For
recommended (OCIMF) setting on the
rope. For new ships this is tested for 8
brakes may deteriorate in service.

Every ship is supplied with a brake te


type brake test kit) to test the brake a
testing kit simulates the load on the l
pressure producing a torque on the w
figure below. For a particular load, the
shown in an example below.

In this example:

Winch capacity : 16 T x 1
Mooring line MBL : 51 T
Brake holding force : Po
MBL)
Drum diameter : Dd = 4
Rope diameter : Dr = 2.8
Effective area of hydraul
Test force moment arm :
Rope PCD : Rpcd = Dd +
Brake torque : Tb = Po x
Force on hydraulic jack :
Therefore required press
(at 80 % MBL) = 230.5 bar

Now the setting is made as per the d


connected on the drum flanges (setu
used to tighten the brake as the brak
respect to the brake nut. The pressur
jack using a manual pump. After the
value (here 230.5 bar), a marking is m
held for a minute and the marking is
slip.

Clutch operation

The clutch is used to engage the drums


in the drum where the clutch slides and
drum turns with the main shaft. The mai
drums (in this case) and one end connec
other to the gear wheel. This gear wheel
connected to the hydraulic motor.

During this test it is checked whether the


that the locking pins to secure the clutch

Turn handle (brake handle) operatio

The brake handle operation is checked fo


Dry running

The mooring winch is subjected to dry ru


minutes. During this time it is checked fo
the gear case. Also the bearings are che
(overheating).

The hydraulic pressure on the test suppl


the electric motor (driving the shore hyd

Conclusion

The outcome of the test has to be noted


be mentioned in the inspection report.