0% found this document useful (0 votes)
184 views63 pages

T5.3 Gnida Formworks PDF

Uploaded by

smishra2222
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
184 views63 pages

T5.3 Gnida Formworks PDF

Uploaded by

smishra2222
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 63

h tJrgen Gnida

ir g
py
C
FormworksforHighriseConstruction
o
JurgenGnida
U H
PERIGmbh
Germany
T B
C

1
PERI Formwork Systems

h t
Jrgen
g Gnida

ir g
p y
CTBUH World Conference

o
- Formwork for High Rise Construction -

C
U H
T B
C

Jrgen Gnida
Head Keyprojects , PERI GmbH

2
High-rise Projects Defintion

h t
Main Core
Jrgen
g Gnida

ir g
High rise
is a multistory building tall enough to require

y
y
the use of a system of mechanical vertical
transportation such as elevator

p Columns

ucture
o
Skyscraper
is a very tall high-rise building

C
Superstru
Bracing Floor
Quoted from www.britannica.com

The choice of the best Formwork systems


depends on:

U H T i l Sl
Typical Slab
b

Internal Parameters
External parameters

T B Non Typical
Sl b
Slab
Basement

C
The result would be the most cost effective Slab
Formwork system
Retaining

Substructure
Walls

3
High-rise Projects Internal Parameters

Main Core
h t Jrgen
g Gnida

ir g
Geometry
Repetitive

y
Simple / Complex

p
Changing geometry
Columns
ucture

Concrete

Co Rate of pour => concrete


Superstru

Bracing Floor pressure


Concrete finish

U H
Typical Slab
Curing time
Sequence of work
Cycle time

Non Typical
Slab
T B Basement
Formwork choice
Existing formwork material

C
Slab at customer to be reused
Rental or purchase
Retaining


Substructure
Walls
Best FW for current project
vs. Max
M Flexibility
Fl ibilit ffor
future projects

4
High-rise Projects External Parameters

Space Safety

h t
Jrgen
g Gnida

ir g
Constraint of existing road or Special requirement at high-rise
building building
Storage area

y
Construction planning
Assembly area

p
Milestones
Wind

o
Working schedules / Shifts
Wind load Project duration
Crane
Capacity
C
Summer schedule / Holidays
Local rules & regulations
Availability

H Permits

ctor
U
Type

Wind Fac
Restricted noise at night
Boom Reach

B
Safety requirement

Existing
C T
Job Site
Existing


Building Building

Active Road 5
PERI Climbing systems

Choice of crane or self-climbing systems


h t
Jrgen
g Gnida

Rental

ir g
1 2
p
3 y
Cost

o
CB

C
RCS

ACS

H
y Cost

U
Assembly

T
& LeaseB
Operation
Purchase
e

C

Assembly
y

0
Construction

10 20 30..40
Quantity of cycles

6
PERI Selfclimbing System ACS - Field of Application

Towers
h tJrgen
g Gnida

Bridges
ir g
Piers
Pylons
p y
High-rise buildings
facade
C o
core
Shaft
Sh ft

U H
Silos

T B
C
Chimnies


Columns

7
PERI Selfclimbing System ACS

criteria for the application of ACS


h t
Jrgen
g Gnida

great building height

ir g
tight working space on site

non sufficient crane capacity


py
o H
C
lifting capacity at long range

number of cranes

tight time schedule

U H
no delays
T B
short construction period

C
high requirements on the concrete quality


8
PERI Climbing System ACS - Types

ACS 100 stands for


h tJrgen
g Gnida

Automatic Climbing System


ir g
Lifting Capacity
Capacit = 100 kN per H
Hydraulic
dra lic C
Cylinder
linder

py
ACS R Regular

C o
ACS G
H
with Gallows

U
ACS P

T BPlatform

ACS S
C for small Shafts

ACS V
adjustable platforms

9
PERI Climbing System ACS - Hydraulic System

climbing machanism ACS 100


h t Jrgen
g Gnida

ir g
for all types climbing shoe

p y
o
upper
climbing head

C
U H hydraulic cylinder

T B climbing rail

C lower


climbing head

10
PERI Climbing System ACS - Hydraulic System

Hydraulic technology
h tJrgen
g Gnida

hydraulic pump with


patented flow divider
ir g
simultaneous climbing

p y
C o
U H
T B
C
10 % 90 %
11
PERI Climbing System ACS - Loads

live loads
h tJrgen
g Gnida

according to site requirements


e.g. storage of reinforcement
ir g
py
wind
Co
H
climbing condition: 72 km/h
(45 mph)

working condition:

B U
100 km/h

T
(62 mph)

C
storm condition: 164 km/h
(102 mph)


- according to German code
- according to country codes
12
PERI Climbing System ACS - Accuracy

BFG Building
B ildi , Frankfort
F kf t , Germany
G , 186 m

h t Jrgen
g Gnida

ir g
5 cm

Gallow

p y External formwork

o
2,5 mm
Internal formwork

C
Window Box-out

U H
T B
C 186 m ACS R
for facade


13
PERI Climbing System ACS - Highrise Buildings

BFG Building
B ildi , Frankfort
F kf t , Germany
G , 186 m

h t Jrgen
g Gnida

ir g
p y
Units climbed
Co
H
together

B U
T
Units climbed seperately

C

14
PERI Climbing System ACS - Highrise Buildings

World
W ld Trump
T Tower
T , New
N Y
York
k , USA , 258 m

h t
Jrgen
g Gnida

ir g
p y
C o
U H
T B
C
ACS R, ACS G
for core walls and facade 15
PERI Climbing System ACS - Highrise Buildings

Park
P kT Tower , Chicago
Chi , USA , 257 m

h t Jrgen
g Gnida

ir g
p y
C o
U H
T B
C
ACS R
for facade and external columns
ACS G

in cores lifting
g placing
g boom
through slabs for shear walls

16
PERI Climbing System ACS - Highrise Buildings

Torre
T Agbar
A b ,BBarcelona
l ,S
Spain
i , 144 m

h tJrgen
g Gnida

ir g
p y
C o
U H
T B ACS R
outside curved facade
outside
t id core wallsll

C ACS G
inside elevator walls

ACS P
i id core walls
inside ll

17
PERI Climbing System ACS - Highrise Buildings

I Parc
P Housing
H i project
j t , Seoul
S l,K
Korea , 176 m
ACS P
h tJrgen
g Gnida

ir g
for core walls

ACS R

y
for core walls and fassade

p
C o
U H
T B
C
Slabformwork
SKYDECK
ACS-R as
slabformwork hoist
18
PERI Climbing System ACS - Highrise Buildings

Seven
S W
World
ld T
Trade
d CCenter
t ,NNew Y
York
k , USA , 230 m

h t Jrgen
g Gnida

ir g
py
C o
U H
T B
C
ACS P
for core walls
19
PERI Climbing System ACS - Highrise Buildings

Plot
Pl t 12 , Moskwa
M k , Russia
R i , 260 m

h tJrgen
g Gnida

ir g
p y
C o
U H
T B
C
ACS P and ACS R
for core walls

20
PERI Climbing System ACS - Highrise Buildings

Trump
T Tower,
T Chicago,
Chi USA , 345 m

h t Jrgen
g Gnida

ir g
p y
C o
U H
T B ACS R
for facade

C

21
PERI Climbing System ACS - Highrise Buildings

Trump
T Tower,
T Chicago,
Chi USA , 345 m

h tJrgen
g Gnida

ir g
p y
C o
U H
T B ACS R
for facade

C

22
PERI Climbing System ACS - Highrise Buildings

United
U it d T
Tower, K
Kuwaitit City
Cit , K
Kuwait
it , 250 m

h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

ACS P and ACS R for core walls 23
PERI Climbing System ACS - Highrise Buildings

Al H
Hamra T
Tower, K
Kuwaitit City
Cit , Kuwait
K it , 412 m

h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

ACS P and ACS R for core walls 24
PERI Climbing System ACS - Highrise Buildings

Marina
M i B Bay Fi
Financial
i lCCenter
t , Si
Singapore , 239 m

h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

ACS P and ACS R for core walls 25
PERI Climbing System ACS - Highrise Buildings

Turning
T i T Torso , Malm
M l ,S
Sweden
d , 190 m

h tJrgen
g Gnida

ir g
S ti
Santiago C
Calatrava
l t
Architect, artist and

py
engineer

C o
U H
T B
C

26
PERI Climbing System ACS - Highrise Buildings

Turning
T i Torso
T , Malm
M l , Sweden
S d , 190 m

h tJrgen
g Gnida

ir g
p y
C o
U H
T B ACS
CS P

C
custom made platform for core walls
placing boom self-climbing


27
PERI Climbing System ACS - Highrise Buildings

Turning
T i Torso
T , Malm
M l , Sweden
S d , 190 m

h tJrgen
g Gnida

ir g
p y
C o
U H
T B
C

28
PERI Selfclimbing System RCS - Field of Application

Towers
h tJrgen
g Gnida

Bridges
ir g
Piers
Pylons
p y
High-rise buildings
facade
C o
core
Shaft
Sh ft

U H
Silos

T B
C
Columns


29
PERI Climbing System RCS

criteria for the application of RCS


h t
Jrgen
g Gnida

low to medium building height

ir g
tight working space on site

non sufficient crane capacity


py
o H
C
available crane time

number of cranes

tight time schedule

U H
no delays
T B
short construction period

C
high requirements on the concrete quality


30
PERI Climbing System RCS - Types

h tJrgen
g Gnida

ir g
RCS stands for :
Rail Climbing
g System
y

RCS C with Carriage


py
RCS G with Gallows C o
RCS P
U H
Protection

Climbing options : T B - craneclimbing


C - selfclimbing


31
PERI Climbing System RCS - Types

RCS P = Protection
h tJrgen
g Gnida

Protection against wind and weather.


Increase in work productivity.
ir g
Enclosure material freely selectable.
Highly visible advertising space.
py
Height of platforms adaptable.
Rail-guided climbing.
Retro-fit mobile self-climbing mechanism.
Co
U H
T B
C

32
RCS Self-climbing Device

Climbing device stands on climbing shoe.


h tJrgen
g Gnida

Co-operates with latch in shoe.


Lifting capacity 50 kN
ir g
Stroke length 50 cm.
Lightweight hydraulics movable by
p y
hand.
Hose connection with quick couplers.
Integrated
I t t d hydraulic
h d li flflow di
divider
id ffor synchronous
h

C o
climbing.
li bi

U H
T B
130 kg C
25 kg

33
RCS Self-climbing procedure

Sequence
h tJrgen
g Gnida

Regular areas

ir g
py
Co
U H
T B
C

34
PERI Climbing System RCS - Projects

Oriyukdo
O i kd P Project
j t,BBusan , K
Korea , 70 - 150 m

h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

RCS C for facade 35
RCS Protection Panel - Projects

Brindley Place, Birmingham, England


h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

RCS C for core walls 36
PERI Climbing System RCS - Projects

Opera
O House
H , Frankfort
F kf t , Germany
G , 170 m

h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

RCS C for facade , ACS P for core walls 37
PERI Climbing System RCS - Projects

Ritz Carlton Hotel, Charlotte, USA , 150 m


h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

RCS C for facade and for core walls

38
PERI Climbing System RCS Project Tasks

h t Jrgen
g Gnida

ir g
The client is looking for a building protection system that would provide proper working
conditions during wind and bad weather conditions as well as protection from falling debris

y
during the construction

p
Every year many working days are lost due to high wind and bad weather conditions

o
C
Hi-rise
Hi i construction
t ti poses a safety
f t risk
i k on b
busy ttraffic.
ffi M Major
j city
it streets
t t andd / or railways
il can
be too close to the building

RCS-P system is a suitable solution

U H
T B
C

39
PERI Climbing System RCS Protection Panel

Assembly optimized for each application:


h t Jrgen
g Gnida

Version 1:
Narrow version
ir g
Version 2:
Wide working platforms
p y
Version 3:
2 storeys in advance

Co
U H
T B
C
Version 1 Version 2 Version 3

40
RCS Protection Panel - Projects

United
U it d T
Tower, K
Kuwaitit City
Cit , K
Kuwait
it , 250 m

h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

41
RCS Protection Panel - Projects

European Courtyard, Luxembourg , 106 m


h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

42
RCS Protection Panel - Projects

Brindley Place, Birmingham, England , 76 m


h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

43
RCS Protection Panel - Projects

Al H
Hamra T
Tower K
Kuwaitit City
Cit , Kuwait
K it , 412 m

h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

44
RCS Protection Panel - Projects

Paragon, London, England , 50 m


h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

45
RCS Protection Panel - Projects

Bellevue Towers, Seattle , 137 m


h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

46
RCS Protection Panel - Projects

Warton Road, London, England , 60 m


h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

47
RCS Protection Panel - Projects

The Claredon, Boston, USA , 102 m


h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

48
RCS Protection Panel - Projects

Absolute Towers, Toronto, Canada , 170 m


h tJrgen
g Gnida

ir g
py
Co
U H
T B
C

49
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 1:
RCS-CLIMBING FROM
LEVEL 1 TO LEVEL 5
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 5

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 1 LEVEL 5 TO
LEVEL 50
LEVEL 6

C
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 6
LEVEL 40

U H LEVEL 35

LEVEL 30

T B LEVEL 25

LEVEL 20

C LEVEL 15

LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

50
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 2:
RCS-CLIMBING FROM
LEVEL 6 TO LEVEL 11
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 11

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 2 LEVEL 11 TO
LEVEL 50
LEVEL 12

C
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 12
LEVEL 40

U H LEVEL 35

LEVEL 30

T B LEVEL 25

LEVEL 20

C
TWIST 02 - LEVEL 11 TO 12
LEVEL 15

LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

51
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 3:
RCS-CLIMBING FROM
LEVEL 12 TO LEVEL 17
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 17

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 3 LEVEL 17 TO
LEVEL 50
LEVEL 18

C
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 18
LEVEL 40

U H LEVEL 35

LEVEL 30

T B LEVEL 25

LEVEL 20

C
TWIST 03 - LEVEL 16 TO 17
LEVEL 15

TWIST 02 - LEVEL 11 TO 12
LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

52
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 4:
RCS-CLIMBING FROM
LEVEL 18 TO LEVEL 23
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 23

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 4 LEVEL 23 TO
LEVEL 50
LEVEL 24

C
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 24
LEVEL 40

U H LEVEL 35

LEVEL 30

T B
TWIST 04 - LEVEL 22 TO 23
LEVEL 25

LEVEL 20

C
TWIST 03 - LEVEL 16 TO 17
LEVEL 15

TWIST 02 - LEVEL 11 TO 12
LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

53
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 5:
RCS-CLIMBING FROM
LEVEL 24 TO LEVEL 26
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 26

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 5 LEVEL 26 TO
LEVEL 50
LEVEL 27

C
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 27
LEVEL 40

U H LEVEL 35

LEVEL 30

B
TWIST 05 - LEVEL 26 TO 27
LEVEL 25

T
TWIST 04 - LEVEL 22 TO 23

LEVEL 20

C
TWIST 03 - LEVEL 16 TO 17
LEVEL 15

TWIST 02 - LEVEL 11 TO 12
LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

54
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 6:
RCS-CLIMBING FROM
LEVEL 27 TO LEVEL 29
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 29

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 6 LEVEL 29 TO
LEVEL 50
LEVEL 30

C
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 30
LEVEL 40

U
TWIST 06 - LEVEL 29 TO 30
H LEVEL 35

LEVEL 30

B
TWIST 05 - LEVEL 26 TO 27
LEVEL 25

T
TWIST 04 - LEVEL 22 TO 23

LEVEL 20

C
TWIST 03 - LEVEL 16 TO 17
LEVEL 15

TWIST 02 - LEVEL 11 TO 12
LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

55
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 7:
RCS-CLIMBING FROM
LEVEL 30 TO LEVEL 32
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 32

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 7 LEVEL 32 TO
LEVEL 50
LEVEL 33

C
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 33
LEVEL 40

U
TWIST 07 - LEVEL 32 TO 33

TWIST 06 - LEVEL 29 TO 30
H LEVEL 35

LEVEL 30

B
TWIST 05 - LEVEL 26 TO 27
LEVEL 25

T
TWIST 04 - LEVEL 22 TO 23

LEVEL 20

C
TWIST 03 - LEVEL 16 TO 17
LEVEL 15

TWIST 02 - LEVEL 11 TO 12
LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

56
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 8:
RCS-CLIMBING FROM
LEVEL 33 TO LEVEL 37
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 35

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 8 LEVEL 35 TO
LEVEL 50
LEVEL 37

C
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 37
LEVEL 40

TWIST 08 - LEVEL 35 TO 36

U
TWIST 07 - LEVEL 32 TO 33

TWIST 06 - LEVEL 29 TO 30
H LEVEL 35

LEVEL 30

B
TWIST 05 - LEVEL 26 TO 27
LEVEL 25

T
TWIST 04 - LEVEL 22 TO 23

LEVEL 20

C
TWIST 03 - LEVEL 16 TO 17
LEVEL 15

TWIST 02 - LEVEL 11 TO 12
LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

57
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 9:
RCS-CLIMBING FROM
LEVEL 37 TO LEVEL 41
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 41

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 9 LEVEL 41 TO
LEVEL 50
LEVEL 42

C
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 42
TWIST 09 - LEVEL 41 TO 42
LEVEL 40

TWIST 08 - LEVEL 35 TO 36

U
TWIST 07 - LEVEL 32 TO 33

TWIST 06 - LEVEL 29 TO 30
H LEVEL 35

LEVEL 30

B
TWIST 05 - LEVEL 26 TO 27
LEVEL 25

T
TWIST 04 - LEVEL 22 TO 23

LEVEL 20

C
TWIST 03 - LEVEL 16 TO 17
LEVEL 15

TWIST 02 - LEVEL 11 TO 12
LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

58
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 10:
RCS-CLIMBING FROM
LEVEL 42 TO LEVEL 47
REMOVAL OF REMOVAL-
RCS-BRACKETS LEVEL 47

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
TWIST 10 LEVEL 47 TO
LEVEL 50
LEVEL 48

C
TWIST 10 - LEVEL 47 TO 48
INSTALLATION OF
LEVEL 45
REMOVAL-RCS-BRACKETS
LEVEL 48
TWIST 09 - LEVEL 41 TO 42
LEVEL 40

TWIST 08 - LEVEL 35 TO 36

U
TWIST 07 - LEVEL 32 TO 33

TWIST 06 - LEVEL 29 TO 30
H LEVEL 35

LEVEL 30

B
TWIST 05 - LEVEL 26 TO 27
LEVEL 25

T
TWIST 04 - LEVEL 22 TO 23

LEVEL 20

C
TWIST 03 - LEVEL 16 TO 17
LEVEL 15

TWIST 02 - LEVEL 11 TO 12
LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

59
RCS Protection Panel Absolute Tower

h t Jrgen Gnida

ir g
CLIMBING STEPS GRAPHIC-ILLUSTRATION
PHASE 11:
RCS-CLIMBING FROM
LEVEL 48 TO THE TOP OF
THE ABSOLUTE TOWER
TOPING OUT OF ALL RCS-

p y TOP OF THE ABSOLUTE TOWER

LEVEL 55

o
CLIMBING UNITS
LEVEL 50

C
TWIST 10 - LEVEL 47 TO 48
LEVEL 45

TWIST 09 - LEVEL 41 TO 42
LEVEL 40

TWIST 08 - LEVEL 35 TO 36

U
TWIST 07 - LEVEL 32 TO 33

TWIST 06 - LEVEL 29 TO 30
H LEVEL 35

LEVEL 30

B
TWIST 05 - LEVEL 26 TO 27
LEVEL 25

T
TWIST 04 - LEVEL 22 TO 23

LEVEL 20

C
TWIST 03 - LEVEL 16 TO 17
LEVEL 15

TWIST 02 - LEVEL 11 TO 12
LEVEL 10

TWIST 01 - LEVEL 05 TO 06 LEVEL 05

LEVEL 01

60
RCS Protection System

h tJrgen Gnida

INCREASED PRODUCTIVITY ir g
Crane independent climbing.
py
Protection from wind results in less lost
days to weather. Many days per year lost
Co
H
annually.

B
comfort and the feeling of safety.
U
Enclosed surrounding increases the level of

floors.

C T
Eliminate installation of guardrail for three


No tie offs

Advertising opportunities.
61
RCS Protection System

h tJrgen Gnida

INCREASED SAFETY
ir g
Safety. Enlcosure prevents debris from falling
onto construction site below or onto busy city

py
o
streets.

Safety. Through the climbing rail, the RCS unit


is always connected to the structure for the entire
C
climbing procedure even in strong wind
conditions.

U H
B
Safety. Enclosed surrounding increases feeling
of safety and results in productivity improvement.

T
C
Safety. No tie off required once the system is in
place.


62
PERI ACS 100 References 1991 - 2009

Australia : 52 Holland : 6 Mexico : 2

h t Jrgen
g Gnida
Singapore : 6

Austria : 2 Hungary : 1 Norway : 3


ir g Sweden : 6

Belgium : 5 India : 1

p y
Panama : 3 Taiwan : 1

Bahrein : 2

Canada : 11
Indonesia : 2

Israel : 10 C o
Polland : 11

Portugal : 1
Thailand : 1

Trinidad : 2

Chile : 1

U H
Italy : 6 Qatar : 6 Turkey : 1

Czech Rep. : 3

T B Japan : 5 Russia : 4 UAE : 36

Egypt : 1

C Korea : 72 Romania : 1 UK : 7


France : 9

Germany : 12
Kuwait : 4

Malaysia : 4
Saudi Arabia : 2

Spain : 13
USA : 82

63

You might also like