0% found this document useful (0 votes)
44 views1 page

AP TRANSCO - Atmakuru Site Level Formation Formation Level Cutting Qty Filling Qty Unit Rate Amount

The document shows quantities for cutting and filling at different formation levels for a site level formation project at AP TRANSCO - Atmakuru. It lists the formation level in meters, the quantity of material cut at that level, the quantity of filling required, and the unit rate and total amount for each level.

Uploaded by

Anil Marturi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views1 page

AP TRANSCO - Atmakuru Site Level Formation Formation Level Cutting Qty Filling Qty Unit Rate Amount

The document shows quantities for cutting and filling at different formation levels for a site level formation project at AP TRANSCO - Atmakuru. It lists the formation level in meters, the quantity of material cut at that level, the quantity of filling required, and the unit rate and total amount for each level.

Uploaded by

Anil Marturi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

AP TRANSCO - Atmakuru site level formation

Formation Level Cutting qty Filling Qty Unit Rate Amount


103 20381.2455 5179.24442
103.5 12750.9031 9795.84923
103.8 9068.37022 13461.4847
104 6981.61839 16273.5117
104.5 3136.94778 24675.7883
104.75 1932.16194 29594.4761