Vipin Sharma: Equipment Division EIB-5

The email provides allowable nozzle loads for cyclone installations on a project. Loads are given for 6", 10", and 12" nozzle sizes in terms of force and torque. These loads are tentative and final loads exceeding these values will be sent to vendors for concurrence. A PMS from a previous job is attached and can be used for the current job in place of developing a new PMS. Inputs are requested to be provided in the engineering document management system by a specified date.

Uploaded by

Ishu Vohra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
84 views2 pages

Vipin Sharma: Equipment Division EIB-5

The email provides allowable nozzle loads for cyclone installations on a project. Loads are given for 6", 10", and 12" nozzle sizes in terms of force and torque. These loads are tentative and final loads exceeding these values will be sent to vendors for concurrence. A PMS from a previous job is attached and can be used for the current job in place of developing a new PMS. Inputs are requested to be provided in the engineering document management system by a specified date.

Uploaded by

Ishu Vohra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Vipin Sharma

From: Vipin Sharma <[email protected]>


Sent: 02 September 2016 10:45
To: 'Sauptik Sinha'
Cc: ''MANOJ AGARWAL''; 'Manmohan Kaler/Piping/EIB/EIL'; 'Atul Gupta';
'[email protected]'; 'APURBA KUNDU'; 'Arshpreet Singh/Process/EIB/EIL'; 'G
Balaji'
Subject: RE: A913/HMEL-PPU/INSTALLATION OF 3rd REACTOR/MR FOR CYCLONES (MR
no. A913-513-GJ-MR-4020 Rev A )
Attachments: pms B4A & D2K (for job no. A913).pdf

Dear Sir
Allowable nozzle loads for cyclones shall be as per following table

Nozzle size/ FA (Kgf) FL (Kgf) FC (Kgf) MT (Kgf-m) ML (Kgf-m) MC (Kgf-m)


rating
6/300# 510 750 750 565 450 340
(CS)
10/600# 845 1250 1250 1565 1250 625
12/300# 1015 1500 1500 2250 1800 1350
(CS)

These loads are tentative only and final loads, if exceeds these values, may be sent to vendor for the concurrence.
For PMS, 6922 job PMS is copied to A913. It is enclosed herewith and it may be used in place of 6922 PMS.

Regards
Vipin kumar sharma
Piping#2695

From: Sauptik Sinha [mailto:[email protected]]


Sent: 01 September 2016 14:01
To: 'Arshpreet Singh/Process/EIB/EIL'; Vipin Kumar Sharma/Piping/EIB/EIL
Cc: ''MANOJ AGARWAL''; Manmohan Kaler/Piping/EIB/EIL; 'Atul Gupta'; [email protected]; 'APURBA KUNDU'
Subject: RE: A913/HMEL-PPU/INSTALLATION OF 3rd REACTOR/MR FOR CYCLONES (MR no. A913-513-GJ-MR-4020
Rev A )

Dear Sir,

Attachments were missed in the trailing mail. Please find attached the PDS and Scope marked P&ID.

Regards

SAUPTIK SINHA
EQUIPMENT DIVISION
EIB-5
I.Com- 3820

_____________________________________________
From: Sauptik Sinha [mailto:[email protected]]
Sent: Thursday, September 01, 2016 2:00 PM
To: 'Arshpreet Singh/Process/EIB/EIL'; Vipin Kumar Sharma/Piping/EIB/EIL
Cc: ''MANOJ AGARWAL''; Manmohan Kaler/Piping/EIB/EIL; 'Atul Gupta'; '[email protected]'; 'APURBA KUNDU'
1
Subject: A913/HMEL-PPU/INSTALLATION OF 3rd REACTOR/MR FOR CYCLONES (MR no. A913-513-GJ-MR-4020 Rev
A)

Dear Sir,

We are initiating the MR for Cyclones (MR no. A913-513-GJ-MR-4020 Rev A ) for PPU unit of GGSRL,
HMEL. This is Category-1 Item.

Vendors scope shall include the following tag no as per attached PDS and P&ID.

Process to provide the final PDS and P&ID for the Cyclones through EDMS. Inputs already invited in EDMS

Piping to provide the allowable nozzle loads. Kindly provide the details through email.

PMS for Job no 6922 is being used for the subject MR. We are attaching the same as part of our input

You are requested to send your inputs in eDMS positively by 02/09/2016.

Regards

SAUPTIK SINHA
EQUIPMENT DIVISION
EIB-5
I.Com- 3820

The Mail has been scanned by Mcafee Appliance ********************************SAVE A