The document contains schedules for constructing a prestressed concrete bridge and a steel composite bridge. It lists activities required for each type of bridge construction including site preparation, fabrication, substructure work, superstructure erection, and finishing work. Time estimates are provided for each activity in days, weeks, and the number of concurrent activities that can be worked on. The schedules allow planning and tracking of bridge construction progress.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
103 views1 page
Programme Examples
The document contains schedules for constructing a prestressed concrete bridge and a steel composite bridge. It lists activities required for each type of bridge construction including site preparation, fabrication, substructure work, superstructure erection, and finishing work. Time estimates are provided for each activity in days, weeks, and the number of concurrent activities that can be worked on. The schedules allow planning and tracking of bridge construction progress.