0% found this document useful (0 votes)
189 views

Boq

The document provides bills of quantities for renovation works within an existing building located at Twofour54, Park Rotana Office Building in Abu Dhabi. It includes 10 bills related to preliminaries, demolitions and alterations, walls and partitions, carpentry and joinery, doors and windows, finishes, electrical installation, mechanical installation, plumbing and drainage, and dayworks. The bills provide descriptions and quantities for various renovation items.

Uploaded by

Shabbir Osmani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views

Boq

The document provides bills of quantities for renovation works within an existing building located at Twofour54, Park Rotana Office Building in Abu Dhabi. It includes 10 bills related to preliminaries, demolitions and alterations, walls and partitions, carpentry and joinery, doors and windows, finishes, electrical installation, mechanical installation, plumbing and drainage, and dayworks. The bills provide descriptions and quantities for various renovation items.

Uploaded by

Shabbir Osmani
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 45

ABU DHABI MEDIA ZONE DEVELOPMENT

TWOFOUR54, PARK ROTANA RKP 39 TADREEB

2ND FLOOR, ABU DHABI

BILLS OF QUANTITIES

(The following Works within an Existing Building)

Bill No. 1 - Preliminaries B1/1 B1/6

Bill No. 2 - Demolitions & Alterations B2/1

Bill No. 3 - Walls & Partitions B3/1 B3/5

Bill No. 4 - Carpentry & Joinery B4/1 B4/3

Bill No. 5 - Doors & Windows B5/1 B5/3

Bill No. 6 - Finishes B6/1 B6/4

Bill No. 7 - Electrical Installation B7/1 B7/7

Bill No. 8 - Mechanical Installation B8/1 B8/7

Bill No. 9 - Plumbing & Drainage B9/1 B9/4

Bill No. 10 - Dayworks B10/1 B10/5

Summary S/1

13/41 Twofour54-RKP 39
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 1
TWOFOUR54 PARK ROTANA RKP39 PRELIMINARIES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Amount
Dh

General Notes on Preliminaries

A These Preliminaries are applicable to the whole of the Works. If the


Tenderer wishes to price any of the items contained herein then each
such item, clause or sub-clause must be individually priced. The
Tenderer shall not enter any lump sums covering more than one or all
items, clauses or sub-clauses. Where an item, clause or sub-clause of
the Preliminaries has not been priced, it will be deemed that the value
of such item, clause or sub-clause is included in the rates for measured
items elsewhere in the Bills of Quantities

Location of Site

B The Site of the Works is located at the new Twofour540, Park Rotana
Office Building , 2nd Floor, Abu Dhabi

Access of Site

C The Contractor is to make his own arrangements for access to the site
and to the Works both for his own use and for the use of sub-
contractors and suppliers

Limitations of the Site

D The Contractor shall be required to confine his activities within the area
allocated by the Engineer including the storage of materials, the
positioning of offices and all other equipment needed for the execution
of the Contract. A temporary fence shall be erected and maintained
around the boundary of the area and the construction shall be agreed
with the Engineer prior to commencement of the Works. Access gates
shall be provided of similar construction

Occupation of Completed Parts of the Works

E The Contractor shall allow the Employer or any person authorised by


him to occupy and use any part of the Works as soon as in the opinion
of the Engineer such part or parts can be so occupied and used without
impeding the progress or completion of the Works and such occupation
shall not in any way alter the period fixed for completion of the Works or
the liability of the Contractor

To Collection Dh

1341 B1/1
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 1
TWOFOUR54 PARK ROTANA RKP39 PRELIMINARIES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Amount
Dh

Engineer's Progress Meetings

A Regular progress meetings will be held throughout the duration of the


Contract and a principal representative of the Contractor will be
required to attend in addition to senior staff and if requested by the
Engineer representatives of any sub-contractors and principal material
suppliers

Tender Drawings

B The Drawings as enumerated in the list of drawings which form a part of


the Tender Documents are for the Contractor's use in the preparation of
his Tender. These drawings are subject to modifications and additions
all as described in the Conditions of Contract

Water for the Works

C The Contractor shall supply clean water for the works including the
works of sub-contractors and shall supply all temporary plumbing
pipework and storage tanks that my be required pending the laying of
the permanent water main or the availability thereof and shall pay all
fees for connections and all charges for water consumed. In the event
of a piped water supply not being readily available at the Site the
Contractor will be required at his own expense to transport water to the
Site by bowser

Temporary Lighting and Power for the Works

D The Contractor shall supply all light and power required for the Works
including the works of sub-contractors including supplying operating
and maintaining temporary switches, cables and leads that may be
required pending the laying of the permanent cable or the availability
thereof and shall pay all fees for the connections and all charges for the
current consumed. In the event of the electricity supply not being
readily available the Contractor will be required at his own expense to
supply, operate and maintain temporary generators

To Collection Dh

1341 B1/2
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 1
TWOFOUR54 PARK ROTANA RKP39 PRELIMINARIES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Amount
Dh

Site Working Conditions

A Throughout the period of construction of the Works the Contractor shall


maintain the whole area of his operation in a clean, tidy and safe
condition by arranging his material in an orderly manner. All rubbish
waste material debris and the like shall be systematically cleared off the
working area as it accumulates and if not removed directly off the Site
shall be deposited at general collecting points allocated by the Engineer
pending removal from Site

Site Offices for Contractors

B Provide all necessary site huts, canteens, toilets and the like for all site
staff employed by Contractor and as required by sub-contractors and
suppliers to the approval of the Engineer

Site Clearance

C The Contractor shall allow for the removal of all arisings located at the
Site prior to commencement of the Works, during the continuance of
the Works and shall leave the Site clean including the making good of
all disturbed surfaces on completion

Existing Site Services

D The Contractor is responsible for the rerouting, addition and alteration


of the existing Site services to suit the new layout. Allow for all costs
and expenses in association with same

To Collection Dh

1341 B1/3
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 1
TWOFOUR54 PARK ROTANA RKP39 PRELIMINARIES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Amount
Dh

Building Permit and Fees

A The Contractor shall allow for obtaining the building permit and for
paying all fees in connection therewith

Progress Photographs

B The Contractor shall allow for the provision of progress photographs as


described for the duration of the Contract

Protection of Existing Surfaces

C The Contractor shall take what ever measures are required to protect
existing surfaces throughout the duration of this Contract making good
all damage occurring as directed by the Engineer

Coordination with other Contractors

D The Contractor shall allow for the completion of these Works in


coordination with other Contractors employed at the Site and take
whatever measures are required so as to complete the Works at the
time given in the Form of Agreement

To Collection Dh

1341 B1/4
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 1
TWOFOUR54 PARK ROTANA RKP39 PRELIMINARIES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Amount
Dh

Prices for Obligations Under the Conditions of Contract

A The Contractor shall set out below and dully describe in the space
provided (inserting the relevant clause number of reference) and price
any work or obligation or anything in the Conditions of Contract or
Specification not included by him in his rates elsewhere and for which
he considers a separate charge is required. The Sums inserted below
shall be considered to be fixed lump sums covering the whole of the
Works and as such will not be subject to adjustment. If the Contractor
does not make allowance in the space provided below then the rates
inserted in the Bills of Quantities hereinafter shall be deemed to cover
all his obligations under the Contract

To Collection Dh

1341 B1/5
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 1
TWOFOUR54 PARK ROTANA RKP39 PRELIMINARIES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Collection Amount
Dh

From Page No.

B1/1

B1/2

B1/3

B1/4

B1/5

BILL NO. 1 - PRELIMINARIES


To Summary DH
1341 B1/6
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 2
TWOFOUR54 PARK ROTANA RKP39 DEMOLITIONS & ALTERATIONS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Demolish or break up, dispose of material


arising and make good all disturbed surfaces,
as detailed on Drawing ID-2F-00-01,
complete

A Make opening for single leaf door size 1100 x


2200mm high to existing concrete wall as
detailed on drawings S-SK-03 and S-SK-04 1 No.

B Blockwalls, 200mm thick 5 M2

Carefully remove, set aside and refix, make


good all disturbed surfaces, as detailed on
Drawing ID-2F-00-01, complete

C Single leaf door 1 No.

D Protect existing double leaf office entrance


door 2 No.

E Remove and relocate SMDB 2 No.

F Remove and relocate data panel 2 No.

G All MEP components removed are to be


handed over to the Engineer / Landlord Item

H Contractor to propose location of temporary


chute subject to Engineer/Landlord approval Item

J Contractor to allow protection for the areas


not under the scope of Fitout Works Item

BILL NO. 2 - DEMOLITIONS & ALTERATIONS


To Summary DH
1341 B2/1
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 3
TWOFOUR54 PARK ROTANA RKP39 WALLS & PARTITIONS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Solid concrete blockwork bedded in cement


and sand mortar including reinforcement, ties
to concrete, lintols and the like, complete

A 200mm thick walls 3 M2

Gypsum board lining in partitions on metal


stud framing, sound insulation batt, taped and
skimmed joints, edge metal trim, finished to
receive decoration, fixing in position, as
detailed on Drawing ID-2F-07-03, complete

B 2 x 12.5mm thick gypsum board partitions,


3145mm high, 200mm thick, Type G 6 M

C Extra over for forming screen opening size


1400 x 2500mm high 2 No.

D 2 x 12.5mm thick gypsum board partitions,


3145mm high, 100mm thick, Type A 90 M

E Extra over for forming door opening size


1800 x 2200mm high 1 No.

F Ditto, size 900 x 2200mm high 4 No.

J Ditto, but moisture resistant on both sides,


Type A 2 M

K Ditto, but moisture resistant on one side only,


Type A 8 M

L Extra over for forming door opening size


900 x 2200mm high 2 No.

To Collection Dh

1341 B3/1
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 3
TWOFOUR54 PARK ROTANA RKP39 WALLS & PARTITIONS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Gypsum board lining in partitions on metal


stud framing, sound insulation batt, taped and
skimmed joints, edge metal trim, finished to
receive decoration, fixing in position, as
detailed on Drawing ID-2F-07-03, complete
(Continued)

A 2 x 12.5mm thick gypsum board partitions,


3145mm high, 100mm thick, Type F 21 M

B Extra over for forming door opening size


900 x 2200mm high 1 No.

C 2 x 12.5mm thick gypsum board partitions,


3145mm high, 100mm thick, Type H 7 M

D Extra over for forming door opening size


900 x 2200mm high 1 No.

E 2 x 12.5mm thick gypsum board partitions in


1-hr fire rated, 3145mm high, 100mm thick,
Type B 40 M

F Extra over for forming door opening size


1400 x 2200mm high 3 No.

Gypsum board lining to existing walls on and


including 25 x 50mm softwood strapping,
taped and skimmed joints, finished to receive
decoration, fixing in position, as detailed on
Drawing ID-2F-07-04, complete

G 12.5mm thick gypsum board lining to walls


and columns, Type D & E 292 M2

H Ditto, but curved 49 M2

J Ditto, to form false column 14 M2

To Collection Dh

1341 B3/2
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 3
TWOFOUR54 PARK ROTANA RKP39 WALLS & PARTITIONS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Gypsum board lining to existing walls on and


including 25 x 50mm softwood strapping,
taped and skimmed joints, finished to receive
decoration, fixing in position, as detailed on
Drawing ID-2F-07-04, complete (Continued)

A 12.5mm thick gypsum board lining to walls


and columns, fixed 162-724mm away from
wall 8 M2

B Ditto, but removable (for future acess) 5 M2

C Ditto, but moisture resistant 11 M2

12mm thick toughened glass panels with 40 x


50 aluminum profile channel cladded with
stainless steel brushed finish on top and
bottom, including mild steel supports fixed on
concrete soffits, ironmongery, fixing in
position, all as shown on Drawing ID-2F-07-
03, complete

D Glass screen, Type C with 2 nos. opening for


900 x 2200mm high single leaf door
(measured separately) overall size 11170 x
2500mm high, L-shaped 1 No.

E Ditto, overall size 9480 x 2500mm high, L-


shaped 1 No.

F Glass screen, size 2475 x 2500mm high 1 No.

G Glass return, Type C, size 890 x 2500mm


high 1 No.

H Ditto, size 850 x 2500mm high 1 No.

To Collection Dh

1341 B3/3
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 3
TWOFOUR54 PARK ROTANA RKP39 WALLS & PARTITIONS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

12mm thick toughened glass panels with 40 x


50 aluminum profile channel cladded with
stainless steel brushed finish on top and
bottom, 3M frosted film applied, including
mild steel supports fixed on concrete soffits,
ironmongery, fixing in position, all as shown
on Drawing ID-2F-07-03, complete

A Glass screen Type C with 2 nos. opening for


900 x 2200mm high single leaf door
(measured separately) overall size 5615 x
2500mm high, L-shaped 1 No.

B Ditto, with 1 no. opening for 900 x 2200mm


high single leaf door (measured separately)
overall size 3375 x 2500mm high 1 No.

C Glass screen, size 2700 x 2500mm high 1 No.

D Ditto, size 1400 x 2500mm high 2 No.

Sundries

E Mineral fibre fire/smoke barrier, size 124 x


105mm high as shown on Drawing ID-2F-07-
03 40 M

To Collection Dh

1341 B3/4
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 3
TWOFOUR54 PARK ROTANA RKP39 WALLS & PARTITIONS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Collection Amount
Dh

From Page No. B3/1

B3/2

B3/3

B3/4

BILL NO. 3 - WALLS & PARTITIONS


To Summary DH
1341 B3/5
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 4
TWOFOUR54 PARK ROTANA RKP39 CARPENTRY & JOINERY
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Cabinets, all as shown on Drawing ID-2F--09-


01, fixing in position, complete

A Utility cupboard as detailed on Drawing ID-2F-


09-03, overall size 8900mm long x 450mm x
2500mm high, U-shaped 1 No.

B Ditto, overall size 5750mm x 450mm x


2500mm high 1 No.

C Ditto, overall size 2700mm x 450mm x


2500mm high 2 No.

D Floor mounted built-in cabinet as detailed on


Drawing ID-2F-09-02, to store room, overall
size 7465mm long x 600mm x 900mm high,
U-shaped 1 No.

E Ditto, but wall mounted, overall 7465mm x


450mm x 900mm high 1 No.

F Open shelves as detailed on Drawing ID-2F-


09-02, overall size 5930mm long x 350mm x
2500mm high, L-shaped 1 No.

Boards fixed on MDF split batten as


approved, all as shown on Drawings ID-2F-05-
02 and ID-2F-07-04, fixing in position,
complete

G Pin board hung on wall, size 7850mm x


1200mm high 1 No.

H Ditto, size 5150mm x 1200mm high 1 No.

J Ditto, size 4885mm x 1200mm high 1 No.

K Ditto, size 4025mm x 1200mm high 1 No.

L Ditto, size 2900mm x 1200mm high 1 No.

To Collection Dh

1341 B4/1
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 4
TWOFOUR54 PARK ROTANA RKP39 CARPENTRY & JOINERY
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Boards fixed on MDF split batten as


approved, all as shown on Drawings ID-2F-05-
02 and ID-2F-07-04, fixing in position,
complete (continued)

A Pin board hung on wall, size 2300mm x


1200mm high 1 No.

B Ditto, size 2235mm x 1200mm high 1 No.

C Ditto, size 1200mm x 1200mm high 2 No.

D White board hung on wall, size 3000mm x


2350mm high 2 No.

E Ditto, size 2400mm x 2350mm high 2 No.

To Collection Dh

1341 B4/2
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 4
TWOFOUR54 PARK ROTANA RKP39 CARPENTRY & JOINERY
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Collection Amount
Dh

From Page No. B4/1

B4/2

BILL NO. 4 - CARPENTRY & JOINERY


To Summary DH

1341 B4/3
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 5
TWOFOUR54 PARK ROTANA RKP39 DOORS & WINDOWS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

12mm thick toughened glass door including


ironmongery, fixing in position, 3M crystal
frosted strips manifestation bands, all as
detailed on Drawing ID-2F-08-01, complete

A Single leaf 'dorma' glass door to suit opening,


size 900 x 2200mm, Type D-02 7 No.

Timber door and frame set, solid core


plywood door in WV-1 finish, solid wood
frames (SW-1), 6mm thick float glass vision
panel, architraves and the like, decoration as
described, fixing in position, all as detailed on
Drawing ID-2F-08-01, complete (structural
opening sizes given)

B 45mm thick double leaf door with 200 x


1800mm high vision panel, to suit opening
size 1400 x 2200mm high, 45 minutes fire
rated, Type D-01 3 No.

Timber door and frame set, solid core


plywood door in white lacquer paint finish,
solid wood frames, architraves and the like,
decoration as described, fixing in position, all
as detailed on Drawing ID-2F-08-01,
complete (structural opening sizes given)

C 45mm thick double leaf door with paint finish


to match P1 to suit opening size 1800 x
2200mm high, Type D04 2 No.

D Ditto, to single leaf door, size 1100 x


2200mm high, 90 minutes fire rated, Type
D05 1 No.

E Ditto, ditto, size 900 x 2200mm high, Type


D03 10 No.

To Collection Dh

1341 B5/1
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 5
TWOFOUR54 PARK ROTANA RKP39 DOORS & WINDOWS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Ironmongery set, fixing to timber doors,


complete

A Set 01 15 No.

Proprietary Silent gliss roller blind system


4810 with sidewinder chain operation,
sunscreen 550 shade, fixing in position,
complete

B Blinds to suit 3270mm drop 121 M2

To Collection Dh

1341 B5/2
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 5
TWOFOUR54 PARK ROTANA RKP39 DOORS & WINDOWS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Collection Amount
Dh

From Page No. B5/1

B5/2

BILL NO. 5 - DOORS & WINDOWS


To Summary DH
1341 B5/3
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 6
TWOFOUR54 PARK ROTANA RKP39 FINISHES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Floor Finishes

A 120mm thick cement and sand screed


finished to receive floor finishes 10 M2

B 2.5mm thick 'Marmoleum' fixing with


adhesive laid over raised floor (measured
separately), Ref. V1 18 M2

C Polyflor - loose lay vinyl tiles fixing with ditto,


Ref. V2 47 M2

D 300 x 300 x 6mm thick fully vitrified non slip


ceramic floor tiles fixed with waterproof
adhesive laid over screed (measured
separately), waterproofing membrane,
grouting and pointing up joints, Ref. CT-1 10 M2

E Carpet, fixing with adhesive laid over raised


floor (measured separately), Ref. CPT-1 124 M2

F Ditto, Ref. CPT-2 496 M2

G 600 x 600mm Kingspan raised access floor 685 M2

H 'Gradius' aluminum profile to match existing


mullon finish as Detail 3 on Drawing ID-2F-
07-01 37 M

J 20mm thick polished nero absoluto threshold


in door opening 100mm wide, Ref. ST-1 3 M

K 3mm stainless steel strip in brush finish as


Details 1 and 2 on Drawing ID-2F-07-01 10 M

L Concrete upstand below raised floor size


100 x 100mm high as Detail 3 on Drawing ID-
2F-07-01 37 M

To Collection Dh

1341 B6/1
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 6
TWOFOUR54 PARK ROTANA RKP39 FINISHES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Wall Finishes

A 300 x 300 x 6mm thick fully vitrified polished


ceramic wall tiles fixed with fosroc adhesive,
grouting and pointing up joints, to gypsum
boards, Ref. CT-2 39 M2

B Prepare and apply one under coat and three


top coats of Jotun silk emulsion (fenomastic
white) to gypsum board surfaces, Ref. P1 892 M2

Skirtings

C MDF skirting with stainless steel cladding in


brush finish, 50mm high 351 M

D Ditto, but curved on plan 4 M

E Ceramic tile fixing with adhesive to gypsum


board, Ref. CT-1, 100mm high as Detail
15 M

Ceiling Finishes

F 1 x 12.5mm thick gypsum board in false


ceiling with taped and skimmed joints, on
and including suspension system from
concrete soffit, Ref. CL-1 365 M2

G Ditto, in bulkheads as Detail 5 on Drawing ID-


2F-07-02 30 M2

H Ditto, in bulkheads 40mm high as Detail 7on


Drawing ID-2F-07-02 23 M

J Ditto, in roller blinds bulkhead, 970mm girth


as Detail 6 on Drawing ID-2F-07-02 37 M

To Collection Dh

1341 B6/2
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 6
TWOFOUR54 PARK ROTANA RKP39 FINISHES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Ceiling Finishes (Continued)

A 600 x 600mm Fine Line 1/8 DXFF Donn


Brand suspended ceiling with shadow line
wall angle, on and including suspension
system from concrete soffit, Ref. CL-2 321 M2

B Ditto, but moisture resistant, Ref. CL-3 9 M2

C Prepare and apply one under coat and two


top coats of white DCD 00E 55 60% matt
finish to gypsum board ceilings 365 M2

D Ditto, in bulkheads 30 M2

E Ditto, in bulkheads 40mm high 23 M

F Ditto, in roller blind bulkheads 37 M

G Allow for access hatch panel in suspended


false ceiling Item

To Collection Dh

1341 B6/3
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 6
TWOFOUR54 PARK ROTANA RKP39 FINISHES
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Collection Amount
Dh

From Page No. B6/1

B6/2

B6/3

Bill No. 6 - FINISHES


To Summary DH
1341 B6/4
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 7
TWOFOUR54 PARK ROTANA RKP39 ELECTRICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Distribution Board

Distribution boards as described in


specification including circuit breakers, cable
termination, switches, earthing and the like,
fixing in position, complete

A DB-OT5 1 No.

B DB-OT6 1 No.

C DB-OT6B 1 No.

Meter

D kWh meter 1 No.

Cables

E 4C-35mm2 XLPE/SWA/LSF + 1C-25mm2


PVC CPC Item

F 4C-16mm2 XLPE/SWA/LSF + 1C-16mm2


PVC CPC Item

G 4C-10mm2 XLPE/SWA/LSF + 1C-10mm2


PVC CPC Item

Wiring devices and accessories including


conduit system and cables as described in
specification, fixing in position, complete

H Three gang, two way lighting switch, 15Amp 2 No.

J Two gang, two way lighting switch, 15Amp 6 No.

To Collection Dh

1341 B7/1
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 7
TWOFOUR54 PARK ROTANA RKP39 ELECTRICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Wiring devices and accessories including


conduit system and cables as described in
specification, fixing in position, complete
(Continued)

A One way lighting switch, 15Amp 15 No.

B Double pole switch for water heater with


indicator lamp 1 No.

C 1 x 13 Amp single switched socket outlet 11 No.

D 63 Amp, 2P+E switched socket outlet


surface mount c/w plug 5 No.

E Double pole flex outlet, 20A 1 No.

F D.P. fused connection unit in close proximity


to ceiling void 8 No.

G 13amp switched fused connection unit with


neon indicator to ceiling 15 No.

H Floor box outlet comprising 1 x 13A twin


switched socket outlet, 2 x RJ45 data outlet
and 1 x RJ45 voice outlet 18 No.

J Ditto, comprising 1 x 13A single switched


socket outlet and 1 x RJ45 data outlet 2 No.

K Ditto, comprising 2 x 13A duplex switched


socket outlet, 1 x RJ45 data outlet and 1 x
RJ45 voice outlet 2 No.

L Ditto, comprising 1 x 13A single switched


socket outlet and 2 x RJ45 data outlet 36 No.

To Collection Dh

1341 B7/2
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 7
TWOFOUR54 PARK ROTANA RKP39 ELECTRICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Junction and pull box including conduit


system and cables as described in
specification, fixing in position, complete

A 4"x4" pull box c/w lid in raised floor 3 No.

B Ditto, in ceiling space for motorized screen


cabling connection with others 3 No.

C Pull box in ceiling space for connection


between wall mounted speakers and audio
amplifier in equipment rack (switch server) 6 No.

Conduit, trunking and fittings as described in


specification complete with all necessary
trays, risers, elbows, supports, end plates,
drop outs and associated fittings and the
like, fixing in position, complete

D 150mm HDGI metallic cable tray 21 M

E 150mm x 25mm metallic cable tray c/w cover


in ceiling space 2 M

F 225mm x 25mm metallic cable tray c/w cover


in ceiling space 32 M

G 225mm x 75mm ditto 19 M

H 225mm x 75mm, 3 compartment metallic


under floor trunking 129 M

J Ditto, 1 compartment (data voice only) 12 M

To Collection Dh

1341 B7/3
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 7
TWOFOUR54 PARK ROTANA RKP39 ELECTRICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Light fittings including conduits and wiring,


fixing in position, complete (Continued)

A Recessed 1x26W downlight, thorn cruz


205H 1x26W T.C. DEL HF with glass cruz
205 halo 28 No.

B 50W LV dichroic recessed fixture with 356


and 60 degree adjustable with transformer
as reggiani 8015 4 No.

C 600 x 600 luminaire thorn indiquat L 2x24W


MF DMB L1840 98 No.

D Ditto, with emergency battery pack 24 No.

E Thorn 96100470 Matrix 300x2x18W TC-L


HF DSB 39 No.

F Ditto, with emergency battery pack 10 No.

Emergency lighting including conduit system,


cables and necessary controls and fittings as
described in specification and as shown on
the drawings, fixing in position, complete

G Emergency exit sign 11 No.

To Collection Dh

1341 B7/4
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 7
TWOFOUR54 PARK ROTANA RKP39 ELECTRICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Fire alarm installation including cable and


conduit, fixing in position, complete

A Smoke detector 25 No.

B Heat detector 1 No.

C Fire alarm transponder/sub-panel 1 No.

D Zone isolator for fire alarm transponder/sub-


panel 1 No.

E Break glass unit 5 No.

F Remove and relocate existing smoke


detector 12 No.

G Remove and relocate existing fire speaker 12 No.

H Allow for reprogramming of existing fire


alarm control panel Item

Security access control system including


conduits and wiring connections, supports,
accessories and the like, fixing in position, all
as shown on the drawings, complete

J Push button 3 No.

K Door chime 3 No.

To Collection Dh

1341 B7/5
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 7
TWOFOUR54 PARK ROTANA RKP39 ELECTRICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Telephone/data installation including cable


and conduit, fixing in position, complete

A Single RJ45 data outlet mounted in ceiling


space 6 No.

B 42U IT rack 1 No.

C 18U, ditto 1 No.

D Allow for 3 Nos. 25mm diameter flexible


metallic conduit connection to floor box Item

Sundries

E Builders work in connection with electrical Item

F Submittals, shop drawings, samples and the Item

G As built drawings and maintenance and Item

H Labels, identification, special tools and the Item

J Testing and commissioning Item

To Collection Dh

1341 B7/6
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 7
TWOFOUR54 PARK ROTANA RKP39 ELECTRICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Collection Amount
Dh

From Page No. B7/1

B7/2

B7/3

B7/4

B7/5

B7/6

Bill No. 7 - ELECTRICAL INSTALLATION


To Summary DH
1341 B7/7
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 8
TWOFOUR54 PARK ROTANA RKP39 MECHANICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

HVAC

Supply and installation of black steel


seamless chilled water pipes, Grade B
Schedule 40 as described in specification,
including thermal insulation, necessary
hangers and supports, joints and fittings,
fixing in position, complete

A Chilled water supply/return pipes, 40mm


diameter 44 M

B Ditto, 32mm diameter 56 M

C Ditto, 25mm diameter 6 M

D Ditto, 20mm diameter 28 M

E Allow for re-routing of existing chilled water


supply/return pipes, 40mm diameter 10 M

F Allow for connection to existing chilled


water supply pipes complete with isolating
valve and drain valve Item

Supply and installation of fan coil units and


accessories as described in specification,
including fans, filters, cooling and heating
coils, motors, , ductworks, flexible
connections and acoustical treatment, and
all associated works, fixing in position,
complete

G Fan coil unit, Ref. FCU-01 4 No.

H Ditto, Ref. FCU-02 2 No.

J Ditto, Ref. FCU-03 1 No.

To Collection Dh

1341 B8/1
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 8
TWOFOUR54 PARK ROTANA RKP39 MECHANICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Supply and installation of fan coil units and


accessories as described in specification,
including fans, filters, cooling and heating
coils, motors, , ductworks, flexible
connections and acoustical treatment, and
all associated works, fixing in position,
complete (Continued)

A Thermostat 7 No.

B Variable air volume, Ref. VA 5 No.

Supply and installation of ductworks and


accessories as described in Specification,
including necessary hangers and supports,
joints, linings, and all associated works,
fixing in position, complete

C Supply air ductworks 166 M2

D Return air ductworks 13 M2

E Kitchen extract ductworks 2 M2

F Fresh air ductworks 27 M2

G Flexible duct, 250mm diameter 24 M

H Ditto, 200mm diameter 48 M

J Ditto, 150mm diameter 16 M

K Volume control damper, size 400mm x


400mm 1 No.

J Ditto, size 400mm x 300mm 2 No.

To Collection Dh

1341 B8/2
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 8
TWOFOUR54 PARK ROTANA RKP39 MECHANICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Supply and installation of ductworks and


accessories as described in Specification,
including necessary hangers and supports,
joints, linings, and all associated works,
fixing in position, complete (Continued)

A Volume control damper, size 250mm x


250mm 2 No.

B Ditto, size 200mm x 200mm 3 No.

C Ditto, size 150mm x 150mm 2 No.

D Ditto, size 250mm diameter 12 No.

E Ditto, size 200mm diameter 24 No.

F Ditto, size 150mm diameter 6 No.

G Non-return damper, Ref. NRD, size 400mm


x 400mm 3 No.

Supply and installation of diffusers,


registers and grilles as described in
specification, including all associated
flexible connections, fixing in position,
complete

H 4-way square supply ceiling diffuser size


300 x 300, Ref. D3 12 No.

J Ditto, size 225 x 225, Ref. D2 17 No.

K Ditto, size 150 x 150, Ref. D1 7 No.

To Collection Dh

1341 B8/3
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 8
TWOFOUR54 PARK ROTANA RKP39 MECHANICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Supply and installation of diffusers,


registers and grilles as described in
specification, including all associated
flexible connections, fixing in position,
complete (Continued)

A 4-way square return ceiling diffuser size


300 x 300, Ref. D11 12 No.

B Ditto, size 225 x 225, Ref. D10 18 No.

C Ditto, size 150 x 150, Ref. D9 7 No.

D Supply linear slot diffuser, 2-slots, 2310mm


length, Ref. D7 1 No.

E Ditto, 2210mm length 1 No.

F Ditto, 1870mm length 1 No.

G Ditto, 1285mm length 1 No.

H Ditto, 1010mm length 3 No.

J Return linear slot diffuser, 2-slots, 2210mm


length, Ref. D15 1 No.

K Ditto, 1820mm length 1 No.

L Ditto, 1285mm length 1 No.

M Ditto, 1010mm length 3 No.

N Circular air valve, 150mm diameter neck,


Ref. D18 1 No.

To Collection Dh

1341 B8/4
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 8
TWOFOUR54 PARK ROTANA RKP39 MECHANICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Supply and installation of diffusers,


registers and grilles as described in
specification, including all associated
flexible connections, fixing in position,
complete (Continued)

A Supply wall register, size 600 x 400mm,


Ref. G1 1 No.

B Return wall grille size 600 x 400mm, Ref. 1 No.

C Wiremesh screen size 500 x 400mm 2 No.

D Ditto, 200 x 200mm 2 No.

Fire Fighting System

Supply and installation of seamless


galvanized steel pipes, Grade B Schedule
40 as described in specification including
necessary hangers and supports, joints and
fittings, fixing in position, complete

E Sprinkler pipe, 80mm diameter 11 M

F Ditto, 65mm diameter 47 M

G Ditto, 50mm diameter 25 M

H Ditto, 40mm diameter 4 M

J Ditto, 32mm diameter 11 M

K Ditto, 25mm diameter 137 M

To Collection Dh

1341 B8/5
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 8
TWOFOUR54 PARK ROTANA RKP39 MECHANICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Fire fighting accessories as described in


specification, fixing in position, complete

A Sprinkler head, type c/w cover plate 67 No.

B Zone control valve assembly as detailed on


Drawing 1/F-00-80-02 2 No.

C FHC complete with 65 diameter landing


valve, 30m 25 diameter hose reel and FE-1
and FE-2 fire extinguisher as detailed on
Drawing 1/F-00-80-02 1 No.

D Pre-action sprinkler system as detailed on


Drawing 3/F-00-80-02 2 No.

Portable fire extinguisher as described in


specification, fixing in position, complete

E 5 Kg CO2 fire extinguisher, Ref. FE-1 9 No.

F 5 Kg Dry powder chemical fire extinguisher,


Ref. FE-2 9 No.

Sundries

G Builders works in connection with


mechanical installations Item

H Submittals, shop drawings, samples and Item

J As built drawings and maintenance and Item

K Labels, identification and the like Item

L Testing and commissioning Item

To Collection Dh

1341 B8/6
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 8
TWOFOUR54 PARK ROTANA RKP39 MECHANICAL INSTALLATION
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Collection Amount
Dh

From Page No. B8/1

B8/2

B8/3

B8/4

B8/5

B8/6

Bill No. 8 - MECHANICAL INSTALLATION


To Summary DH
1341 B8/7
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 9
TWOFOUR54 PARK ROTANA RKP39 PLUMBING & DRAINAGE
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Supply and installation of polyetylene PEX


domestic water supply pipes, as described in
specification. including thermal insulation,
necessary hangers and supports, joints and
fittings, fixing in position, complete

A Cold water supply pipes, 25mm diameter 53 M

B Ditto, 15mm diameter 2 M

C Domestic hot water supply pipes,15mm


diameter 3 M

Supply and installation of cast iron hubless


pipes and fittings, as described in
specification, necessary hangers and
supports, joints and fittings, fixing in position,
complete

D Condensate drain pipe, 32mm diameter 58 M

E Waste pipe, 110mm diameter 8 M

F Ditto, 40mm diameter 4 M

Supply and installation of plumbing


specialties, as described in specification,
necessary hangers and supports, joints and
fittings, fixing in position, complete

G Floor drain, 110mm diameter, Ref. FD 2 No.

H Clean out, 110mm diameter 1 No.

J Ditto, 32mm diameter 11 No.

K Condensate pump incorporated in wall


mounted FCU 2 No.

To Collection Dh

1341 B9/1
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 9
TWOFOUR54 PARK ROTANA RKP39 PLUMBING & DRAINAGE
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Plumbing fixtures and fittings, fixing to


structure, connecting to supply and waste
pipelines, bedding in mastic, caulking with
sealant, complete

A Single bowl sink with single drainer 2 No.

B Sink mixer 2 No.

Valves and fittings, fixing in position,


complete

C Gate valve, 25mm diameter 3 No.

D Built-in relief valve, 25mm diameter 1 No.

E Isolation valve, 15mm diameter 2 No.

Domestic hot water storage tank and heater,


as described in specification including
necessary accessories and all associated
works, fixing in position, complete

F Electric water heater, horizontal, 30L


capacity, Ref. WH-1 1 No.

Water Meter, fixing in position, complete

G Water meter 1 No.

H PRV station 1 No.

J Allow for connection to existing cold water


supply pipe Item

To Collection Dh

1341 B9/2
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 9
TWOFOUR54 PARK ROTANA RKP39 PLUMBING & DRAINAGE
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

Sundries

A Builders works in connection with plumbing Item

B Submittals, shop drawings, samples and the


like Item

C As built drawings and maintenance and


operation manuals Item

D Labels, identification and the like Item

E Testing and commissioning Item

To Collection Dh

1341 B9/3
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 9
TWOFOUR54 PARK ROTANA RKP39 PLUMBING & DRAINAGE
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Collection Amount
Dh

From Page No. B8/1

B8/2

B8/3

Bill No. 9 - PLUMBING & DRAINAGE


To Summary DH
1341 B9/4
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 10
TWOFOUR54 PARK ROTANA RKP39 DAYWORKS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

LABOUR

A Chargehand craftsman hour

B Ganger hour

C Blocklayer or Mason hour

D Carpenter hour

E Fitter (not on plant maintenance) hour

F Bar bender / steel fixer hour

G Joiner hour

H Plasterer hour

J Mechanics and Electricians hour

K Plumber and Drainlayer hour

L Welder hour

M Painter hour

N Labourer hour

P Semi-skilled labourer hour

Addition for Profit and Overheads ------------- %

1341 B10/3
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 10
TWOFOUR54 PARK ROTANA RKP39 DAYWORKS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

PLANT ON SITE

A Motor lorry, not exceeding 5 tons hour

B Pick-up hour

C Concrete mixer hour

D Dumper hour

E Bar bending machine hand operated hour

F Concrete vibrator hour

G Soil compactor 2 - 5 cwt hour

H Mechanical excavator with single hour

J Compressor hour

K Tower crane hour

L Mobile crane hour

M Hand operated roller hour

N Welding equipment hour

Addition for Profit and Overheads ------------- %

1341 B10/4
ABU DHABI MEDIA ZONE DEVELOPMENT BILL NO. 10
TWOFOUR54 PARK ROTANA RKP39 DAYWORKS
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
Item Description Qty Unit Rate Amount
Dh Dh

MATERIALS DELIVERED TO SITE


(All to be in accordance with the
Specification)

A Building sand M3

B Aggregate (to pass 29mm) M3

C Ordinary Portland cement - grey tonne

D Solid concrete blocks 100mm thick M2

E Ditto, 200mm thick M2

F Hollow concrete blocks 100mm thick M2

G Ditto, 200m thick M2

H Softwood for carpentry (any size) M3

J Hardwood for joinery (any size) M3

K 12mm thick gypsum board M2

L 15mm thick MDF board M2

M 3M scotch film M2

N 12mm thick plywood M2

P 20mm ditto M2

Q 12mm thick blockwood M2

R Brymor vinyl M2

S Epoxy paint Litre

T Fenomastic paint Litre

Addition for Profit and Overheads ------------- %

1341 B10/5
ABU DHABI MEDIA ZONE DEVELOPMENT SUMMARY
TWOFOUR54 PARK ROTANA RKP39
TADREEB, 2ND FLOOR, ABU DHABI
Bills of Quantities
SUMMARY Amount
Dh

From
Page:

Bill No. 1 - Preliminaries B1/6

Bill No. 2 - Demolitions & Alterations B2/1

Bill No. 3 - Walls & Partitions B3/5

Bill No. 4 - Carpentry & Joinery B4/3

Bill No. 5 - Doors & Windows B5/3

Bill No. 6 - Finishes B6/4

Bill No. 7 - Electrical Installation B7/7

Bill No. 8 - Mechanical Installation B8/7

Bill No. 9 - Plumbing & Drainage B9/4

Bill No. 10 - Dayworks B10/5

Sub Total Dh

Contingency

TOTAL
Carried to FORM OF TENDER DH

1341 S/1