Start End Duration 1 2 3 4 5 6 7 8 9 10 11 12

This table shows a project schedule broken into 24 periods of 2 weeks each, from January 2, 2017 through June 20, 2017. Each period lasts 14 days. The table tracks the start and end dates of each biweekly period over the course of the 24 week project timeline.

Uploaded by

Jayal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views2 pages

Start End Duration 1 2 3 4 5 6 7 8 9 10 11 12

This table shows a project schedule broken into 24 periods of 2 weeks each, from January 2, 2017 through June 20, 2017. Each period lasts 14 days. The table tracks the start and end dates of each biweekly period over the course of the 24 week project timeline.

Uploaded by

Jayal
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Start End Duration Week

1 2 3 4 5 6 7 8 9 10 11 12
1/2/2017 1/15/2017 14
1/16/2017 1/29/2017 14
1/30/2017 2/12/2017 14
2/13/2017 2/26/2017 14
2/27/2017 3/12/2017 14
3/13/2017 3/26/2017 14
3/27/2017 4/9/2017 14
4/10/2017 4/23/2017 14
4/24/2017 5/7/2017 14
5/8/2017 5/21/2017 14
5/22/2017 6/4/2017 14
6/5/2017 6/20/2017 14
Week
13 14 15 16 17 18 19 20 21 22 23 24