Petrobras Albacora Project Overview

Petrobras Albacora is Brazil's first major deepwater oil field located in the Campos Basin offshore Rio de Janeiro. The field consists of 65 wells connected through vertical subsea trees, manifolds, and flowlines to two production units - the semi-submersible P-25 platform and FPSO P-31 vessel. FMC Technologies provided the subsea production system under an EPC contract, including 65 vertical trees rated for 5,000 psi, 7 subsea manifolds, control systems, and installation support. The field currently produces over 150,000 barrels of oil and 90 million cubic feet of gas per day.

Uploaded by

Kevin Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
224 views2 pages

Petrobras Albacora Project Overview

Petrobras Albacora is Brazil's first major deepwater oil field located in the Campos Basin offshore Rio de Janeiro. The field consists of 65 wells connected through vertical subsea trees, manifolds, and flowlines to two production units - the semi-submersible P-25 platform and FPSO P-31 vessel. FMC Technologies provided the subsea production system under an EPC contract, including 65 vertical trees rated for 5,000 psi, 7 subsea manifolds, control systems, and installation support. The field currently produces over 150,000 barrels of oil and 90 million cubic feet of gas per day.

Uploaded by

Kevin Garcia
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Petrobras Albacora

Brazil

Landmark: Brazils First Developed Giant Field

Project Overview Project Characteristics Project Ownership


Contract Award: 1986 (Trees Ph I) No. Trees: 65 (25 by FMC) Petrobras 100%
1992 (Trees Ph II) Water Depth: 150 - 1,050 m
1994 (Manifolds Ph I) (490 - 3,440 ft)
1995 (Manifolds Ph II)
Tree Type: Vertical
Sales: Rio de Janeiro, Brazil
Tree Pressure 5,000 psi
Fabrication: Rio de Janeiro, Brazil
Tree Bore size: 4x2
Service Base: Maca, Brazil
Hydrocarbon: Oil and Gas
Host Type: Semi and FPSO
Contract Type: EPC
BRAZIL
Scope of Work Comments
Subsea: Phase I (P-25 Platform) In 1984, the Albacora Field was discovered at Campos Basin,
4 Thirteen (13) vertical 4x2 5,000 psi diverless DLL subsea proving the existence of giant deepwater fields in Brazil. The
trees Albacora Field comprises sixty-five (65) wells, two (2) production
units (semi-submersible P-25 and FPSO P-31) and seven (7) diver-
4 Two (2) subsea production manifolds less manifolds (6 for oil production and 1 for water injection).
4 Four (4) subsea control modules The production has reached 150,000 bopd and 90 mmcf/d of
natural gas.
4 Twelve (12) vertical connection modules (manifold flowline
connection system) The semi-submersible platform P-25 has a process plant with the
Subsea: Phase II (P-31 Platform) capacity of 100,000 bopd and 115 mmcf/d of natural gas. There
4 Fourteen (14) vertical 4x2 5,000 psi subsea trees are fourteen (14) production wells connected directly to the
platform (satellite wells) and sixteen (16) wells connected to two
One (1) GLL-I (2) diverless production manifolds by a vertical flowline connec-
Five (5) GLL-III tion system. These FMC Technologies manifolds, installed in
Four (4) GLL-IV December 1995 and April 1996, were the worlds deepest subsea
Two (2) GLL-V production manifolds and multiplex control pods at the time.
Two (2) GLL-VI
4 Four (4) multiplexed subsea production manifolds with The FPSO P-31 process plant capacity is 200,000 bopd and
valves and chokes 130 mmcf/d of gas. The plant processes the oil produced in P-25
platform and the oil production of twenty-eight (28) production
4 One (1) multiplexed subsea water injection manifold with wells connected to four (4) FMC production diverless manifolds.
valves and chokes
4 Nineteen (19) subsea control modules
4 Forty-seven (47) vertical connection modules (manifold
and tree flowline connection systems)
4 System integration, testing, installation assistance, service
and maintenance
Floating Production: Phase II (P-31 Platform)
4 Design and construction of permanent internal mooring
system

Worldwide Headquarters: Regional Sales Office:


FMC Technologies FMC Technologies
1803 Gears Road Rodovia Presidente Dutra, 2660
Houston, TX 77067, USA Pavuna 21538-900
Phone: +1 (281) 591 4000 Rio de Janeiro, Brazil
Fax: +1 (281) 591 4291 Phone: +55 (21) 2472 7770
Fax: +55 (21) 2471 2924

www.fmctechnologies.com

You might also like