Formwork Quantity Take Off 2
Beams Slabs m2
3,80 x 5,00 4 x 0,40 x 0,10 + 2 x
S1: = 20,136
3,60 x 0,18
2 x 5,00 x 0,50 + 2 x (5,00-2 x 0,40) x
b1,b2: 0,32 +
+ 2 x 4,20 x 0.30 = 10,208
Columns(joints 4 x 0,40 x 0,50 + 4 x 0,40 x 0,32 + 4 x
= 1,440
areas): 0,10 x 0,32
Total = 31,784
Columns:
4 x (0,40 x 0,40 x 2,50) = 16,000
Formwork quantity take-off of basement
Beams Slabs m2
S1: 4,50 x 3,90 - 4 x (0,15 x 0,15) = 17,460
2 x [5,00 x 0,50 +4,20 x 0,32]
b1,b2: = 9,788
+4,20 x 0,25
4,40 x 0,50 + 3,60 x 0,32 +3,60
b3: = 4,252
x 0,25
Shear wall sw5: 4,40 x 0,50 + 3,60 x 0,32 = 3,352
internal columnsides: 4 x 2 x 0,15 x 0,32) = 0,384
Total = 35,236