1. The document discusses current transformers used in electrical systems to measure current. It shows a diagram of a 3-phase current transformer setup with labels A through D describing the components. 2. The diagram shows 3 current transformers labeled L1, L2, and L3 connected to 3 phases of power labeled A, B, and C. It also shows connections for grounding and control functions. 3. Additional information is provided in a table with readings for things like voltage, current, resistance and status indicators for monitoring the system.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
683 views1 page

200 - 250 Kva Can-Model1

1. The document discusses current transformers used in electrical systems to measure current. It shows a diagram of a 3-phase current transformer setup with labels A through D describing the components. 2. The diagram shows 3 current transformers labeled L1, L2, and L3 connected to 3 phases of power labeled A, B, and C. It also shows connections for grounding and control functions. 3. Additional information is provided in a table with readings for things like voltage, current, resistance and status indicators for monitoring the system.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8

3 CURRENT TRANSFORMERS

L1

A A
L2
G
L3

B 30 50 70 90 8 9 10 1 B

USB

PROGRAMMING
PORT

6
7
C RS
C
16 35

COMMON ALARM
44 66 77 33 4 19 W B 15
6
MC
Starter Motor

Remote start
7A 2 92
+ 6
(24 Volt)
Battery

1
_ 7
DYN 7 6
5 CLS
+ M Ref.
5 19 D03 25 CAN
_ RS Ref.

ETS
OPS
D D05 D
+VE 6 3
Ref. S S

5 D06

- VE
5
To / From Relay Box 3 W B
6 5
CAN
E E
RN : FUEL SOLENOID RELAY CLS : COOLANT LEVEL SENSOR S : SENSOR OUTGOING/INCOMING PANEL TERMINAL
F1 F2 F3 F4 F5
MPR: MAIN POWER RELAY RS : RELAY START CUSTOMER TERMINAL
7 7A 3 5 92 25

(DSE power supply)


+ve 24V - 10A

(For Emergency Stop)


+ve 24V - 20A

PHASE 1 - 4A

PHASE 2 - 4A

PHASE 3 - 4A

Common Alarm
SOLENOID
Emergency Stop

Remote Start
OPR : OIL PRESSURE READING ES :EMERGENCY STOP INTERNAL JOIN

ETR :ENGINE TEMPERATURE READING SOL : SOLENOID


GROUNDING

OPS : OIL PRESSURE SWITCH G : GENERATOR TO/From RELAY BOX

ETR :ENGINE TEMPERATURE SWITCH M : STARTER MOTOR


F F
DYN : DYNAMO (CHARGING ALTERNATOR) F : FUSE TERMINALS BLOCK

DRAWING NO. Revision No. DESCRIPTION : DATE : 26/5/14


ELE6110C3M200001 JUBAILI BROS ENG. LTD Control Wiring Diagram For P200-250KVA
SHEET NO: 1/1

SHEET Integrated electromechanical services DESIGN BY: Yasser Farhat


SIZE
A3 End User With DSE 6110 CAN Approved BY: Ahmed Dahshi