This document provides details of the construction work for a building including: 1. Earthwork such as site clearing, pit excavation, and trench excavation totaling 39.52 sqm, 7.84 cum and 7.36 cum respectively. 2. Concrete work including 7.36 cum of lean concrete and 1.08 cum and 1.79 cum of C25 concrete in footings and ground floor slab. 3. Masonry work totaling 8.208 cum for walls using hollow concrete blocks and brickwork.

Uploaded by

eph
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
236 views12 pages

Take of For School Exercise 1

This document provides details of the construction work for a building including: 1. Earthwork such as site clearing, pit excavation, and trench excavation totaling 39.52 sqm, 7.84 cum and 7.36 cum respectively. 2. Concrete work including 7.36 cum of lean concrete and 1.08 cum and 1.79 cum of C25 concrete in footings and ground floor slab. 3. Masonry work totaling 8.208 cum for walls using hollow concrete blocks and brickwork.

Uploaded by

eph
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 12

Description Descritpion

A. Sub-Structure 2. Conceret work


1. Earthwork 2.1 lean concrete
1.1 Site clearing work a) under footing pad
7.6 L=6.7+0.9=7.6 m 4 0.9 L=0.9 m
5.2 w=4.3+0.9=5.2 m 0.9 w=0.9 m
39.52 m2 total site clearing 3.24 m2 total lean concerte
b) under masonary wall
1.2 pit excavation B/n Axis 1 and 2
4 1.4 L=w=0.9+2*0.25=1.4 m 2 5.8
1.4 0.4
2 h=1.7+0.25+0.05 = 2 m 4.64 m2 on Axis 1 and 2
7.84 m3 total pit excavation B/n Axis A and B
1.3 Trench excavation 2 3.4
B/n Axis 1 and 2 0.4
2 5.8 L=6.7-0.9=5.8 m 2.72 m2 under Axis A and B
0.4 w=0.4 m 7.36 m2 total lean concerte
1 h=1 m 2.2 C-25 concerte in footing
4.64 m3 total b/n axis 1 and 2 4 0.9
B/n Axis A and B 0.9
2 3.4 L=4.3-0.9 0.25
0.4 w=0.4 m 0.81 m3 in footing
1 h=1m 4 0.2
2.72 m3 total b/n axis A and B 0.2
7.36 m3 total trench excavation 1.7
1.4 backfill 0.27 m3 in foundation column
7.84 pit excavation 1.08 m3 total C25 conceret
7.36 Trench excavation 2.3 C-25 concerte in Grade beam
0.162 Ddt. lean concerte 22.4 L=2/6.9+2/4.5-2*0.2=22.4 m
1.082 Ddt. In Footing 0.2 w=0.2 m
13.96 m3 Total 0.4 d=0.4 m
1.5 hardcore 1.79 m3 total
2.4 C-25 concerte in Ground
6.5 L=6.5 m Floor slab
4.1 w=4.1 m 27 Refer 1.5
26.65 m2 total hardcore 2.5 Formwaork
1.6 Cartaway a. Footing pad
9.88 site clearing 4 3.6 L=4/0.9=3.6 m
7.84 pit excavation 0.25 h=0.25 m
7.36 Trench excavation 3.6 m2 total
25.08 Gross total
13.96 Ddt. backfill 0.8
11.12 m3 Cartaway
Description Description
b. Foundation column
4 0.8 L=4/0.2=0.8 m
1.7
5.44 m2 total
C. Grade beam
external
Lext=2/6.9+2/4.5=22.8 m
Lint=2/6.5+2/4.1=21.2 m
44 L total=22.8+21.2=44 m
0.4
17.6 m2 total
3. Masonary work
22 L =2/6.9+2/4.5-2*0.4=22 m
0.4 w=0.4 m
0.95 h=0.95 m
8.36 Gross volume
Ddt. For column
4 0.2 l=w=0.2 m
0.2 h=0.95 m
0.95
0.152 Ddt. For column
8.208 m3 total masonary work
Description
B. Super-structure 1.4 Formwork
1. Concerte work a) column
1.1 Elevation column 4 0.8
4 0.2 L=w=0.2 m 3.15
0.2 h=3.15 m 10 m2 Total
3.15 B) Top tie Beam
0.504 m3 Total Lext=2/6.9+2/4.5= 22.8
1.2 Top Tie beam Lint=2/6.5+2/3.9 = 20.8
21.6 L=2/6.7+2/4.3-2*0.2=21.6 m Lbot=6.5+2/3.9= 20.8
0.2 w=0.2 43.6 L total(ext+int)=22.8+20.8=43.6 m
0.25 d=0.25 0.25
1.08 m3 Total 10.9 m2 total external and internal
1.3 lintel Beam 20.8
over Door 0.2
D1 (1*2.3) 4.16 m2 on bottom side
2 1.4 L=1+2*0.2=1.4 m 15 m2 total on top tie beam
0.2 w=0.2 m C) lintel beam
0.2 D=0.2 m D1
0.112 m3 total over D1 4 1.4 L= 1.4
D2 (0.7*2.1) 0.2 h=0.2 m
1.1 L=0.7+2*0.2=1.1 m 1.12 m2 on sides
0.2 w=0.2m on bottom
0.2 D=0.2 m 2 1 L=1 m
0.044 m3 Total over D2 0.2 w=0.2 m
0.4 m2 on bottom side
over window D2
W1(2.44*1.6) 2 1.1 L=1.1 m
2.84 L=2.44+2*0.2=2.84 m 0.2 h=0.2 m
0.2 w=0.2 m 0.44 m2 on sides
0.2 D=0.2 m on bottom
0.114 m3 over W1 0.7 L= 0.7 m
W2 0.2 h=0.2m
0.99 L=0.59+2*0.2=0.99 m 0.14
0.2 w=0.2 m W1
0.2 D= 0.2 m on sides
0.04 2 2.84 L=2.84 m
0.309 m3 Total volume of lintel 0.2 h=0.2 m
1.14 m2 on sides
Description Description
on bottom A1
2 2.44 L=2.44 m 1 1.4 h=5-3.6=1.4
0.2 h=0.2 m 6.9 w=6.9 m
0.976 m2 on bottom 9.66 m2
W2 A2
on sides 2 6.9 L=6.9 m
2 0.99 L=0.99 m 0.2 h=3.6-3.4=0.2 m
0.2 w= 0.2 m 2.76
0.396 m2 on sides 12 Total Area of 10 cm HCB
on bottom 3. Roof work
3.1 Roof cover( by horizontal
0.59 L=0.59 m projection)
0.2 w= 0.2 m 8.1 L=2/3.45+2/0.6=8.1 m
0.118 m2 on bottom 4.5 w=4.5 m
4.726 m2 Total lintel formwork 36 m2 total area
2. Masonary Work 3.2 Gutter
2.1) 20 cm HCB 2 4.5
21.2 L=2/6.5+2/4.1= 9 m total length of gutter
3.15 h=3.15 m 3.3 Downpipe
66.78 m2 Gross Area 4 3.4 h=3.4 m
D1 13.6 m downpipe
2 1 L=1 m 3.4 ) Ridge cover
2.3 h=2.3 m 4.5 m total length
4.6 Ddt. For D1 4. Finishing and Tiling work
W1 4.1 Internal plaster to wall
2.44 L=2.44 m
L=2/6.5+2/4.1+1.8+(1.8-
1.6 h=1.6 m 95 0.15)+2/35+0.15-0.15
3.904 Ddt. For W1 3.4
W2 322 m2 total plaster
4.2 External plaster to beam
plas 0.59 L=0.59 m and column
0.6 h=0.6 m top tie beam
0.354 Ddt. For W2 2 10.6 L=4.1m+6.5 m
57.92 m2 Net area of 20 cm HCB 0.25 h=0.25 m
2.2 ) 15 cm HCB 5.3 m2 on beam TB
2 L=1.8+(23+59+23-70)/100-0.15=2 Grade beam
3.4 h=3.4 m 2 10.6
6.8 m2 Total 15 Cm HCB 0.4
2.3) 10 cm HCB 8.48 m2 on GB
Triangle-A1 8 0.2 column
Rectangle -A2 3.13
5 m2 on column
Description Description
m2 total plaster to beam and
18.79 column d. Skirting
4.3 Rendering to External wall 95 m skirting ( refer 4.1)
total area E. coping to parapet
21.2 L=2/6.5+2/4.1=21.2 m h'=5-3.6=1.4 m
3.15 h=3.15 m w=6.9/2=3.5 m
66.78 Gross Area =( 1.4 ^2+
Door 4 3.77 3.5 m skerting
^2 ) =3.8
2 L=1+1= 2m 15 m coping to parapet
2.3 h=2.3 m 5. Metal Work
4.6 Ddt. For door 2 100 *230 cm Door
window 1 244*160 cm window
2.44 L=2.44 m 1 59*60 cm window
1.6 h=2.4-0.8=1.6 m 6. Carpentary and joinery
3.904 Ddt. For window 6.1 Door and window
0.39 L=0.59 m 1 70*210 cm door
0.6 h=0.6 m 6.2 Truss
0.234 Ddt. For window number of truss=6.9/0.12+1=7
58.04 m2 total below top tie a. Horizontal members
12.42 m2 Above top tie 7 5.2
4.4 painting 36.4 m horizontal members
321.8 To internal wall b. Rafter
18.79 To beam and column l1
1.4 l2
70.46 To rendered wall
x
to ceiling
6.5 L=6.5 m from triangle similarity
4.1 w=4.1 m /0.6=1.4/2.25
26.65 Gross Area
partiton x=0.37 m
2.05 L=1.8 m+0.35=2.05 m 1=( 1.4 ^2+
0.15 0.37
2.25 ^2 )=2.65 m
2=( ^2+
0.308 Ddt. For partition 0.6 ^2 )=0.7 m
26.34 m2 To ceiling 14 3.35 L total=l1+l2=2.65+0.7=3.35 m
4.6 Tiling work 46.9 m total
a. Pvc Floor tiles C. Vertical members
26.34 total area (see 4.4)
b. window sill a b c d
L=2.44 m+0.594*(0.025)
3.13 m window sill /2.07=1.4/2.2
c. Door sill 5
L=2*1+0.7+3*0.025 a=1.29 m
2.775 m door sill
2.44
common difference=1.4-1.29=0.11m 1.6
b=1.29-0.11=1.18 m 3.9
c=1.18-0.11=1.07 m 7.66 m2 Total glazing Area
d=1.07-0.11=0.96 m

Ltotal=1.4+2*(1.29+1.18+1.07+0.
96)=10.40 m
7 10.4
72.8 m total vertical members
d. Diagonal member

p
Q R S

P=( 1.29 ^2+ 0.


69
Q=( ^2 1.18 m^2+ 0.
)=1.46
69 ^2 )=1.37 m
R=( 1.07 ^2+ 0.
69 ^2 )=1.27 m
S=( 0.96 ^2+ 0.6
9 ^2 )=1.18 m
7 10.56 Ltotal=2*(1.46+1.37+1.27+1.18)=10.56 m
73.92 m total length
e. Purlin
L=3.35 m
# of purlin=3.35/0.9+1=5
Lenth of purlin=4.5 m
2 22.5 Lt=5*4.5=22.5 m
45 m total length
f. fasial board
2 4.5
9 m total length
g. chipwood ceiling
26.34 see 4.4
7. Glazing
doors
2 1
1.7
3.4 m2 to doors
window
0.59
0.6
0.354 m2 to window