Value Stream Mapping Process : Ring Eye Seal Date : Current
Check Box
Check
Future
Check
200 Box 201 Box 202
Ideal
Timeline Operator
Ded. Proc. Shared Proc. Proc. Time
Verbal Info Proc. Cell Prod. Lead
Time
Weekly Orders
Production Control See Sched. Tel. Info Tel. Info
Monthly Orders
Elec. Info Man. Info
Trialco JCWPA
Monthly Forecast
Supplier/ OR Manual pull/
Customer Withdrawl
Production MRP/ Order
Control ERP Input
Other Info
Kanban Signal Production
Post Kanban Kanban
Withdrawl Kaizan Queue
2 1 1 1 1 Kanban Burst
Recieving Foundry - Foundry - Machining Deburr Inspect Recieving
Load Store / WIP Safety
Static Pour Heat Treat Leveling Stock
0X 0X
C/T : C/T : C/T : 15 min C/T : C/T :
Inventory First in, First out
C/O : 60 min C/O : C/O : 150 min C/O : C/O :
FIFO
Avail: Avail: Avail: Avail: Avail:
Push: Push Sequenced
FPY : 100% FPY : 100% FPY : FPY : FPY :
Matl. Move Pull :
OEE/Util : OEE/Util : OEE/Util : OEE/Util : OEE/Util : OR
Shipment
External Warehouse
PLT Movement
Production Lead time Oven / Quality Problem Area
Production Cycle Efficiency Heat /Prep.
Metric / Data Box Definitions : Considerations : 22 Work day / month ; 1 shift => 7 hour (after PFD) = 7.5 Hour - 2 x 10 Min - 10 Min
T/T = Travel time L/T = Lead time C/O = Change over time C/Te = Cycle time (Oven, Equipment) Takt = Available work time per shift Define effective Work hour/day
Q/T = Queue time L/T = P/T + T/T P/T = Process time P/T = Q/T + C/T + C/O Perf = Performance Time customer demand qty. per shift x working day & calculate Takt time.
C/T = Cycle time PFD = Personal Fatigue & Delay Time C/Tt = Cycle time (Touch) FPY = First Pass Yield Av=Availability OEE = FPY * Av * Perf Record all your assumptions.
Value Stream Mapping
Process :
Queue Cycle ChangeoverTi Std. Units Processed WIP Distance to next Existing Existing Comments :
Zone Oper Step Time Time me Inventory Finished process FPY OEE