0% found this document useful (0 votes)
149 views2 pages

Cex 7108the Open University of Sri Lanka

The document contains an assignment for a postgraduate diploma program in construction management. It includes three questions regarding [1] data required for a cash flow forecast at the pre-tender stage of a construction project and reasons for adverse cost variances, [2] steps to promote the importance of cash flow forecasting to contractors in Sri Lanka, and [3] how claims affect a contractor's cash flow and comparing cash flow forecasting at the corporate and project levels. The assignment is to be submitted to the listed course coordinator by the indicated due date.

Uploaded by

Rrgs Bandara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
149 views2 pages

Cex 7108the Open University of Sri Lanka

The document contains an assignment for a postgraduate diploma program in construction management. It includes three questions regarding [1] data required for a cash flow forecast at the pre-tender stage of a construction project and reasons for adverse cost variances, [2] steps to promote the importance of cash flow forecasting to contractors in Sri Lanka, and [3] how claims affect a contractor's cash flow and comparing cash flow forecasting at the corporate and project levels. The assignment is to be submitted to the listed course coordinator by the indicated due date.

Uploaded by

Rrgs Bandara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

The Open University of Sri Lanka

P.G. Diploma in Construction Management Programme Level 7

CEX 7108 Cost Control and Cash Flow in the Construction Industry
Assignment 2- Academic year 2017

Submit answers to: Course Coordinator CEX 7108,


Department of Civil Engineering, The Open University of Sri Lanka, Nawala, Nugegoda.
______________________________________________________________________
Date of submission as indicated in the Activity Diary or amended thereafter.
Answer all questions with assumptions stated clearly.
Refer your hand out on General Information. Type written answers are expected.

Q1.

(a) List and explain the data required to prepare a cash flow forecast of a construction project at pre tender stage.

(b) When calculating variances at the end of six months on a construction site of a road construction project, it
is found that there is an adverse variance for the item construction materials. List & explain possible
reasons.
Q2.

(a) Discuss possible steps to be taken to make the contractors in Sri Lanka understand the importance of cash
flow forecasting.

(b) A Client requires a 20 bed roomed, three-star hotel to be designed in close proximity to the sea coast. As the
Consultant for this project, list the steps you would take to minimize the overall cost of this project by
making use of the Value Engineering concept at the design stage.

Q3.

(a) Explain how Claims affect a Contractors cash flow. Why is it important to separate out Claims when
assessing the achieved margin in a construction contract?

(b) Draw and explain the cash curves giving information most useful to a Contractor.
What is the cash curve used by the Client/Consultant and how does he make use of the curve?

(c ) Compare and contrast cash flow forecasting at Corporate level and Project level for a company handling
construction projects.
Cash flow forecasting is important because if a business runs out of cash and is not able to obtain
new finance, it will become insolvent. ... As a result, it is essential that management forecast
(predict) what is going to happen to cash flow to make sure the business has sufficient funds to
survive.
(c ) Compare and contrast cash flow forecasting at Corporate level and Project level for a company handling
construction projects.

Cash flow forecasting is important because if a business runs out of cash and is not able to obtain new finance, it
will become insolvent. ... As a result, it is essential that management forecast (predict) what is going to
happen to cash flow to make sure the business has sufficient funds to survive.