Consultants/Contractors Confirmation Check List: Consultant/Contractor Undertaking

This document is a checklist for consultants/contractors to confirm that various electrical installation requirements have been met for a construction project. It includes 17 items to check such as proper placement and access of electrical rooms, segregated wiring for tenants, compliance with voltage drops and harmonic studies, correct load calculations, and protection devices. The consultant must sign an undertaking that the low voltage installation will be completed per DEWA rules and any issues found during inspection will be rectified without delay.

Uploaded by

om_23123062
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
149 views1 page

Consultants/Contractors Confirmation Check List: Consultant/Contractor Undertaking

This document is a checklist for consultants/contractors to confirm that various electrical installation requirements have been met for a construction project. It includes 17 items to check such as proper placement and access of electrical rooms, segregated wiring for tenants, compliance with voltage drops and harmonic studies, correct load calculations, and protection devices. The consultant must sign an undertaking that the low voltage installation will be completed per DEWA rules and any issues found during inspection will be rectified without delay.

Uploaded by

om_23123062
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Consultants/Contractors Confirmation Check List

Project:
PlotNo:Area:
Owner:
No wet area like toilet/bath room/kitchen/Pantry/Laundry/Swimming pool etc. Above electrical
1 room. Yes NA
2 NoMDBs/SMDBs/DBsareinstalledunderwetarea orinwetwall Yes NA
All electrical rooms are designed with adequate maintenance/operational access for the switch
3 gears/equipment/KWhmeters/capbanksetcasperDEWArules. Yes NA
4 Allelectricalroomsareprovidedwithunhinderedaccessfromthecommoncorridor/servicearea. Yes NA
5 Doorsofallelectricalroomsarenotopeningtothedriveway /staircase/ramp/ outside plot Yes NA
AllDBs/SMDBs/forthetenantsarelocated/installedin therespectivetenantareaneartothefront
6 entrance. Yes NA
Segregated wiring for each tenant area/metered area with physical separation provided with
7 separateaccesstoeachtenantpremise. Yes NA
8 Allcablesareroutedthroughcommonservicecorridor/area Yes NA
9 Airconditioningducts,chilledwaterlinesarenotpassingthroughtheelectricalroom. Yes NA
Voltagedropwithintheconsumerinstallationisverifiedandfoundwithinthepermissiblelimit(4%)
10 fromDEWAsupplypointtothefinaldistributionpoint. Yes NA
Harmonic study has been carried out and necessary active/passive filter are incorporated to
11 compensatetheeffectofnonlinearload. Yes NA
Number of light points, switched socket out lets and commercial load of equipments fittings
12 etc...Specifiedintheloaddistributionschedulesarecorrectaspertheprojectsummaryschedule. Yes NA
Circuit breakers/contactors are associated with Under Voltage (UV) Relays, having 'Auto Closing'
13 facility to restore supply for Chillers/Air Conditioning Units, after normalization of supply voltage, Yes NA
whentherelayresetautomatically.
All electrical installation shall comply with adequate earth leakage/over current/under voltage
14 protectionasperDEWAtechnicalspecification/regulation. Yes NA
AllAirconditioningunitsproposedfortheprojectaredesignedasperDMapprovedthermalload
15 calculationandiswithintheapprovedlimit. Yes NA
16 AllequipmentsandinstallationsarecomplyingwithGreenBuildingRegulation Yes NA
All provisional/proposed future loads where spares/space/standby are included in the total
17 connectedload/Installedload. Yes NA

Remarks:

Consultant/Contractorundertaking

I/We the under signed hereby agree to complete the LV installation as per DEWA rules & regulations. Any discrepancies/deviations
noticedduringsitetechnicalinspectionbyDEWAwillberectifiedbyusandwewillberesponsibleforanydelayforgettingelectricity
connectiontotheprojectduetononcomplianceofthisundertaking.

Signature&CompanyStamp:________________

Name:__________________________________

Designation:_____________________________