0% found this document useful (0 votes)
71 views19 pages

FL - Unit Prices

- Unit Prices

Uploaded by

Ayman Kandeel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views19 pages

FL - Unit Prices

- Unit Prices

Uploaded by

Ayman Kandeel
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 19

Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt

Formatted: Font: 8 pt
Formatted: Font: 8 pt

SECTION 012200 - UNIT PRICES Formatted: Font: 8 pt


Formatted: Tab stops: 6.25", Right + Not at 6.5"
TIPS:

To view non-printing Editor's Notes that provide guidance for editing, click on MasterWorks/Single-
File Formatting/Toggle/Editor's Notes.

To read detailed research, technical information about products and materials, and coordination
checklists, click on MasterWorks/Supporting Information.

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary
Special Conditions and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for unit prices.

B. Related Requirements:

1. Section 012100 "Allowances" for procedures for using unit prices to adjust quantity
allowances.
2. Section 012600 "Contract Modification Procedures" for procedures for submitting
and handling Change Orders.
3. Section 014000 "Quality Requirements" for field testing by an independent testing
agency.

1.3 DEFINITIONS

A. Unit price is[ an amount incorporated into the Agreement, applicable during the
duration of the Work as] a price per unit of measurement for materials, equipment, or
services, or a portion of the Work, added to or deducted from the Contract Sum by
appropriate modification, if the scope of Work or estimated quantities of Work required by
the Contract Documents are increased or decreased.

1.4 PROCEDURES

A. Unit prices include all necessary material, plus cost for delivery, installation, insurance,
[applicable taxes, ]overhead, and profit.

B. Measurement and Payment: See individual Specification Sections for work that requires
establishment of unit prices. Methods of measurement and payment for unit prices are
specified in those Sections. Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 1 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt
C. Owner Royal Commission reserves the right to reject Contractor's measurement of work-in-
place that involves use of established unit prices and to have this work measured, at Formatted: Font: 8 pt
Owner'sRoyal Commissions expense, by an independent surveyor acceptable to Contractor. Formatted: Font: 8 pt

D. List of Unit Prices: A schedule of unit prices is included in Part 3. Specification Sections
referenced in the schedule contain requirements for materials described under each unit
price.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 SCHEDULE OF UNIT PRICES

EDIT FOR SCOPE OF WORK INCLUDED IN CONTRACT AND DELETE Formatted: Font: Times New Roman, 11 pt
ITEMS NOT REQUIRED. NUMBER PAY ITEMS ACCORDING TO DIVISION. Formatted: Indent: Left: 0.24", Right: 0.24"
Formatted: Font: Times New Roman
A. EARTHWORKS
Formatted: Indent: Left: 0.19", Hanging: 0.44"

1. Site Clearing: Formatted: Font: Times New Roman


Formatted: Font: Times New Roman
a. Site Clearing includes, but is not necessarily limited to excavation, removal Formatted: Indent: Left: 0.63", Hanging: 0.38"
and disposal of vegetation, debris, unsuitable soil materials and other matter
or obstructions to construction. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Site clearing shall be measured by the square meter of site cleared. Formatted: Font: Times New Roman

2. Excavating and Rough Grading the Existing Surface: Formatted: Indent: Left: 0.63", Hanging: 0.38"
Formatted: Font: Times New Roman
a. Excavating and rough grading the existing surface includes but is not limited
to all excavation, stockpiling, scarification of existing surface, hauling,
spreading, watering, mixing, compacting, and grading to achieve subgrade
elevations and required soil densities by cutting and filling within the contract
limits the entire site area, including median areas and the general site devel-
opment; and all associated sampling and testing, all in accordance with the
contract drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Excavating and rough grading the existing surface shall be measured by the
cubic meter of on-site material excavated pursuant to this item. Quantity
computations shall be made for excavated materials based on the difference
between original cross- sections and final cross-section taken in the field at
the same locations in the same plane at uniform intervals not exceeding 25
meters, in all areas where the subgrade surface is lower than the original sur-
face. The volume shall be calculated from the cross-sections using the Aver- Formatted: Font: (Default) Times New Roman, 11 pt
age End Area Method. Formatted: Font: Times New Roman
Formatted: Indent: Left: 0.63", Hanging: 0.38"
3. Borrow Material and Rough Grading:
Formatted: Font: Times New Roman
a. Borrow material and rough grading includes, but is not necessarily limited to, Formatted: Font: 8 pt
furnishing all borrow material from a borrow pit outside Royal Commission Formatted: Font: 8 pt
property; all hauling, stockpiling, scarification of existing surfaces, spread- Formatted: Font: 8 pt
ing, watering, mixing, compacting, and grading to achieve design elevations
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 2 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt
by filling with borrow material, and all associated sampling and testing, all in
accordance with contract drawings and specifications. Borrow material shall Formatted: Font: 8 pt
not be utilized until all suitable on-site cut material has been exhausted. Formatted: Font: 8 pt
Formatted: Font: (Default) Times New Roman, 11 pt
b. Borrow material and rough grading shall be measured by the cubic meter, Formatted: Font: Times New Roman
complete in place. Prior to initiating placement of borrow material, cross-
sections of the compacted surface upon which the borrow material will be
placed shall be made at uniform intervals not exceeding 25 meters. Upon
completion of the construction of the compacted borrow material, cross-
sections of the compacted surface shall be made at the same locations and in
the same plane as the original cross-sections. The volume shall be calculated
from the cross-sections using the Average End Area method. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
4. Excavation (For Site Grading and Drainage Swales): Work shall include excavation
of whatever type of material encountered and trimming and compacting the sides and
bottoms of excavations to the lines and grades shown on the drawings. It shall also
include the disposal of surplus and unsatisfactory excavated material to approved
dumping areas as directed, and all testing and quality control procedures as specified. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Excavation shall be measured in cubic meters as calculated by the difference from the
existing ground surface elevations and the finished grade elevations based upon sur-
veys before and after completion of work. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
5. Selected Fill: Work shall include ground surface preparation, supply of fill material,
placement and compaction to the lines and grades shown on the drawings. It shall al-
so include all testing and quality control procedures as specified. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Selected fill shall be measured in cubic meters calculated from the existing ground
surface elevations and the finished grade elevations based upon surveys before and
after completion of work. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
6. Trench Excavation (For Potable Water and Sanitary Sewer Systems only): Work shall
include excavation in whatever material encountered to the lines and grades indicated
on the drawings and to the widths necessary for pipe installation, any necessary shor-
ing, strutting and dewatering. Work shall also include backfill with selected material
provided by Contractor, compaction in layers as specified and disposal of surplus ma-
terial. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Trench excavation shall be measured in linear meters along the centerline of the pipe. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
7. Sand Bedding (For Potable Water and Sanitary Sewer Systems): Sand bedding shall
include supply and laying of coarse sand in trenches as bedding for potable water and Formatted: Font: Times New Roman
sewer pipes.

Sand bedding shall be measured in cubic meters.


Formatted: Font: Times New Roman

8. Earthwork for Embankment: Formatted: Indent: Left: 1"


Formatted: Font: (Default) Times New Roman, 11 pt
a. Excavation, hauling, placing and compacting fill utilizing materials available Formatted: Font: Times New Roman
from contract areas or from borrow areas shall include the following work:
Formatted: Font: (Default) Times New Roman, 11 pt

i. Removal of the existing top soil where fill for the embankment is to Formatted: Font: 8 pt

be placed, to a depth from 150 mm to 300 mm in accordance with the Formatted: Font: 8 pt
Contract Specifications, scarifying and compaction of the subgrade Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 3 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt
soil to form the required bottom of the embankment all as shown on
the Contract Drawings. Formatted: Font: 8 pt
Formatted: Font: 8 pt
ii. Excavation and hauling of suitable fill material from whatever bor- Formatted: Font: Times New Roman
row source used, filling, spreading and compaction for the construc- Formatted: Font: (Default) Times New Roman, 11 pt
tion of the embankments all as shown on the Contract Drawings.
Formatted: Font: Times New Roman
iii. Excavation, hauling, filling, spreading and compaction of all suitable Formatted: Font: (Default) Times New Roman, 11 pt
fill material available from within the contract limits.

iv. Compaction of fill for the embankments with vibratory equipment to Formatted: Font: (Default) Times New Roman, 11 pt
the specified density, all soil testing required so as to comply with the
Contract Specifications.
Formatted: Font: Times New Roman
v. Excavation, hauling, filling and spreading of all unsuitable material Formatted: Font: (Default) Times New Roman, 11 pt
encountered during the excavation, to the Royal Commission sanitary
landfill disposal area.

Measurement shall be by the cubic meter of compacted fill material


in place as calculated between the finished compacted bottom eleva-
tion of embankment and the finished elevation of the embankments
from the Contract Drawings, verified by surveys taken before and af-
ter construction of the embankment.
Formatted: Font: Times New Roman
9. Cofferdam: Formatted: Indent: Left: 0.63", Hanging: 0.38"
Formatted: Font: Times New Roman
a. Cofferdam includes, but is not necessarily limited to, (All cofferdams the
Formatted: Font: Times New Roman
Contractor proposes to use shall have Royal Commission approval prior to
construction. Contractor shall provide shop drawings, calculations, reports for
Royal Commission review and approval), furnishing, constructing, and sub-
sequently removing cofferdam or cofferdams as required to construct struc-
tural elements of the structure in the dry; dewatering to a minimum elevation
of - m + and dewatering plant and equipment; all labor, materials and inci-
dentals required; all in accordance with the contract drawings and specifica-
tions.

b. Cofferdam shall not be measured but shall be paid as lump sum. Formatted: Font: Times New Roman

B. SHORE PROTECTION WORK Formatted: Indent: Left: 0.19", Hanging: 0.44"


Formatted: Font: Times New Roman
1. Armor Stone: Formatted: Indent: Left: 0.63", Hanging: 0.38"
Formatted: Font: Times New Roman
a. Armor Stone includes, but is not necessarily limited to, furnishing and plac-
ing all armor stone required from on-site or off-site sources including reuse of
Formatted: Font: (Default) Times New Roman, 11 pt
existing armor stone; all excavating, hauling, stockpiling, placing, samples;
and all associated sampling and testing, all in accordance with the contract Formatted: Font: Times New Roman

drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt


Formatted: Font: Times New Roman
b. Armor stone shall be measured by the cubic meter, complete in place. Quan- Formatted: Indent: Left: 0.63", Hanging: 0.38"
tity computations shall be made for armor stone based on the length, width
Formatted: Font: Times New Roman
and thickness of placement limits shown on the approved construction draw-
ings and verified in the field. Armor stone placed outside said limits will not Formatted: Font: 8 pt

be measured for payment. Formatted: Font: 8 pt


Formatted: Font: 8 pt
2. Quarry Run Layer (Rock Rip-Rap): Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 4 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"

a. Quarry Run Layer includes, but is not necessarily limited to, furnishing and Formatted: Font: 8 pt
placing all quarry run layer required from off-site sources; all excavating, Formatted: Font: 8 pt
hauling, stockpiling, placing, samples; and all associated sampling and test-
ing, all in accordance with the contract drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Quarry Run Layer shall be measured by the cubic meter, complete in place.
Quantity computations shall be made for Quarry Run Layer based on the
length, width and thickness of placement limits shown on the approved con-
struction drawings and verified in the field. Quarry Run Layer placed outside
said limits will not be measured for payment. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
3. Filter Fabric: Formatted: Font: Times New Roman
Formatted: Indent: Left: 0.69", Hanging: 0.31"
a. Filter Fabric includes, but is not necessarily limited to, furnishing and placing
all filter fabric required; all fitting, placing both above water and under water,
developing a method for placement under water, securing fabric, slack around
irregularities, fabric edge and end laps, protection, and repairs to fabric; and
all associated sampling and testing; all in accordance with the contract draw-
ings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Filter Fabric shall be measured by the square meter, complete in place.
Quantity computations shall be for Filter Fabric based on the length and
width placement limits shown on the approved construction drawings and
verified in the field. Filter fabric placed outside said limits will not be meas-
ured for payment. Edge and end laps will not be measured for payment. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
C. PILING WORK Formatted: Indent: Left: 0.19"
Formatted: Font: Times New Roman
1. Test Piles:
Formatted: Indent: Left: 0.69", Hanging: 0.31"
a. Test Piles includes, but is not necessarily limited to, furnishing, fabricating Formatted: Font: Times New Roman
and driving precast concrete test piles; all hauling, handling, erection, place-
ment in the leads, access, staging, records, removing and redriving test piles;
and all associated sampling and testing; all in accordance with the contract
drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Test Piles shall be measured per each for each test pile driven complete in
place, as shown on the approved construction drawing and verified in the
field. Removing test piles when required will not be measured for payment. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
2. Load Tests: Formatted: Indent: Left: 0.69", Hanging: 0.31"
Formatted: Font: Times New Roman
a. Load Tests includes, but is not necessarily limited to, performing static load
Formatted: Font: (Default) Times New Roman, 11 pt
tests on driven test piles, providing facilities to observe measurement of de-
flection or settlement, furnishing measuring equipment, making measure- Formatted: Font: Times New Roman

ments of deflection or settlement, loading test piles and load test report; all in Formatted: Font: (Default) Times New Roman, 11 pt
accordance with the contract drawings and specification. Formatted: Font: Times New Roman
Formatted: Indent: Left: 0.69", Hanging: 0.31"
b. Load tests shall be measured per each for each load test performed, as shown
Formatted: Font: Times New Roman
on the approved construction drawings and verified in the field.
Formatted: Font: 8 pt

3. Precast Concrete Piles: Formatted: Font: 8 pt


Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 5 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt
a. Precast Concrete Piles includes, but is not necessarily limited to, furnishing,
fabricating and driving precast concrete piles and furnishing equipment for Formatted: Font: 8 pt
driving piles; all hauling, handling, erection, placement in the leads, records, Formatted: Font: 8 pt
back- driving, jetting when authorized, corrective measures and build ups;
and all associated sampling and testing; all in accordance with the contract
drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Precast Concrete Piles shall be measured by the linear meter, complete in
place, measured from the tip elevation to the cut off elevation, as indicated on
the approved construction drawings and verified in the field. Portions of
piles cut off, piles not driven, withdrawal, cutting off and abandonment of
piles, other corrective measures, removal of piling from the site and piling
which does not meet the specification requirements, will not be measured for
payment. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
4. Reinforced Concrete Cast-In-Place Piles: Formatted: Indent: Left: 0.69", Hanging: 0.31"
Formatted: Font: Times New Roman
a. mm Diameter Piles: Work under this item includes boring, casing, if used,
reinforcing, and concreting of cast-in-place piles as shown and specified. It Formatted: Font: Times New Roman
also includes load testing of piles, test piles and cutting off head of the pile to
specified cut-off level.

b. Measurement shall be by the linear meter of the final length of the pile in-
stalled (after cut-off) in the work. No separate payment shall be made for
load testing of piles and test piles. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman

D. CONCRETE WORK Formatted: Indent: Left: 0.19"


Formatted: Font: Times New Roman
1. Cast-In-Place Concrete: Formatted: Indent: Left: 0.69", Hanging: 0.31"
Formatted: Font: Times New Roman
a. Cast-In-Place Concrete includes, but is not necessarily limited to, furnishing
and placing cast-in-place concrete for structures including pile caps, retaining
walls, walls, stairs, fill, girders, extension to existing box culverts; admix-
tures, waterstops, bonding agent, epoxy surface coating, scupper pipe, bar
grating at culvert, and curing materials; designing, furnishing, fabricating,
placing, removing and disposing of all formwork for cast-in-place concrete,
including metal inserts, anchors, form coatings, and form ties; furnishing,
fabricating and placing reinforcement for cast-in- place concrete including
electrical bonding; and all associated sampling and testing; all in accordance
with the contract drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Cast-In-Place Concrete shall be measured by the cubic meter, complete in
place, for the design mix of concrete, based upon the theoretical dimensions
of the sections shown on the drawings and by the actual approved lengths
constructed, as indicated on the approved construction drawings and verified
in the field, without deduction for chamfers, rein- forcing steel, embedded Formatted: Font: (Default) Times New Roman, 11 pt
items and openings having an area of less than 0.2 square meters. Joint mate- Formatted: Font: Times New Roman
rials, bonding agent, epoxy surface coating, curing, formwork, concrete rein- Formatted: Indent: Left: 0.19"
forcement, metal inserts, anchors, scupper pipe, bar grating, and incidental
Formatted: Font: Times New Roman
items to cast-in-place concrete will not be measured for payment.
Formatted: Font: 8 pt

E. HARDSCAPING Formatted: Font: 8 pt


Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 6 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt
1. Concrete Base to Major Pedestrian and Neighborhood Pathways: Work shall include
100 mm thick mesh- reinforced concrete slab including necessary formwork, excava- Formatted: Font: 8 pt
tion to reduce levels, compacting of subgrade, 100 mm thick gravel bed, all expan- Formatted: Font: 8 pt
sion joints and joint material. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Concrete base shall be measured in square meters as installed.

2. Precast Concrete Pavers: Work shall include pavers with colored sandblast finish laid
in running bond pattern on and including mortar bed, with joint grouted. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Precast concrete pavers shall be measured in square meters as installed.

3. Unglazed Ceramic Tiles: Work shall include tiles laid in narrow bands on and includ-
ing mortar bed, with joints grouted. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Tiles shall be measured in square meters as installed.

4. Sidewalks and Concrete Pathways: Work shall include 100 mm mesh-reinforced con-
crete slab with brush finish including excavation to reduce levels, compacting of sub-
grade, 100 mm thick gravel bed, all expansion joints and joint material. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Sidewalks and concrete pathways shall be measured in square meters as installed.

5. Sidewalk Drains: Work shall include mesh-reinforced concrete slab with brush finish,
including excavation to reduce levels, compacting of subgrade, 100 mm thick gravel
bed and galvanized steel checker plate cover. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Sidewalk drains shall be enumerated by size.

6. Eight-Point Star Features: Work shall include the complete paving feature including
ceramic tile and precast concrete pavers cut and laid to decorative pattern on and in-
cluding mortar bed with colored grout joints (concrete base measured separately). Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Eight-point star features shall be enumerated for payment by size and type.

7. Precast Concrete Curbs: Work shall include precast curbs set on and including in-situ
concrete foundation, including excavation, backfill and compaction. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Precast concrete curbs shall be measured in linear meters along the curb face.

8 Stepping-Stones: Work shall include preparation and compaction of ground surface,


and supply and laying of precast concrete stepping stones. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Stepping-Stones shall be enumerated for payment.

9. Shade Structures: Work shall include shade structures, foundations, all street furni-
ture, trash receptacles, drinking fountains complete and all other items shown on the
drawings. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Shade structures shall be enumerated by type.
Formatted: Font: (Default) Times New Roman, 11 pt

10. Concrete Walls: Work shall include reinforced concrete retaining walls or free- Formatted: Font: 8 pt

standing walls with light sandblast finish to all exposed faces, set on and including re- Formatted: Font: 8 pt
inforced concrete base, including excavation, backfill and compaction and including Formatted: Font: 8 pt
bituminous paint coating to all soil-covered faces of retaining walls. Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 7 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"

Concrete walls shall be measured in linear meters by type along the face. Formatted: Font: 8 pt
Formatted: Font: 8 pt
11. Stone Mulch: Work shall include selected stone aggregate spread and leveled on the Formatted: Font: Times New Roman
site. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Stone mulch shall be measured in square meters as installed.

F. PLANTING AND TOPSOIL Formatted: Font: Times New Roman


Formatted: Indent: Left: 0.19"
1. Trees, Shrubs and Ground Cover: Work shall include supply and planting of trees,
shrubs and ground cover, including excavation of pits, soil backfill, mulching, water-
ing, pruning, staking and guying as required. Also included is the spreading and lev-
eling of topsoil on-site as specified. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Trees, shrubs and ground cover shall be enumerated by type for payment, except for
turf which shall be measured in square meters as installed. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
2. Landscape Planting: Formatted: Font: Times New Roman

a. This item includes provision and placement of landscape planting sand to the
required depth of not less than 500 mm in all areas designated in the contract
drawings and specifications. Procurement of permits and materials, sampling
and testing, stockpiling, hauling and placing of material, preparation of sub-
base, settling, leveling, clean- up, and removal of excess or unsuitable mate-
rials shall be included, all in accordance with the contract drawings and spec-
ifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Measurement for landscape planting sand shall be per cubic meter delivered,
placed, graded, and complete, as shown on the contract drawings and as veri-
fied in the field. Formatted: Font: (Default) Times New Roman, 11 pt

3. Finish Grading: Formatted: Indent: Left: 0.69", Hanging: 0.31"


Formatted: Font: Times New Roman
a. Finish grading includes, but is not limited to the uniform smoothing of the fi- Formatted: Font: Times New Roman
nal surface to + 50 mm of the design grades and forming the final surface to
approved shape and character.

b. Finish grading shall be measured by the square meters of final surface


smoothed and formed. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
G. ROADWORKS Formatted: Indent: Left: 0.19"
Formatted: Font: Times New Roman
1. Roadway Embankment: Work under this item includes the placement and compaction
to the required lines and grades of suitable fill material for construction of the road,
and at the vicinity of bridge abutments, embankments and roadway drainage swales
and the necessary testing and quality control. All fill required shall be provided by the Formatted: Font: (Default) Times New Roman, 11 pt
Contractor as part of this item, from a borrow source approved by the Royal Commis- Formatted: Font: Times New Roman
sion. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the cubic meter of compacted material in place, as calculat-
ed from the Contract Drawings and verified by surveys taken before and after the Formatted: Font: 8 pt

embankment work. Formatted: Font: 8 pt


Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 8 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt
2. Granular Base Course: Work under this item includes the supply, placement and
compaction to 300 mm thickness of granular base course material in the number of Formatted: Font: 8 pt
layers specified, and testing and quality control. Formatted: Font: 8 pt
Formatted: Font: (Default) Times New Roman, 11 pt
Measurement shall be by the square meter of compacted granular base course in Formatted: Font: Times New Roman
place, as calculated from the Contract Drawings and verified by field measurements.
Field measurements shall include verification of the required thickness. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
3. Hot Laid 150 mm Asphaltic Concrete Base Course (in Two Layers of 75 mm Each):
The work under this item includes, surface preparation and application of prime coat;
tack coat; the procurement, hauling, spreading, rolling and compaction of asphaltic
concrete; and the necessary testing and quality control, all in accordance with the
Contract Drawings and Specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the square meter of paving installed, as calculated from the
Contract Drawings and verified by field measurements. Field measurements shall in-
clude verification of the required thickness. Formatted: Font: (Default) Times New Roman, 11 pt

Measurement shall be to the extent of the required constant thickness and shall ex-
clude tapered edges and paving over-runs which shall be deemed included in the price
of the full thickness asphaltic concrete base course. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
4. Hod Laid 50 mm Asphaltic Concrete Wearing Course: The work under this item in-
cludes, surface preparation and application of tack coat; the procurement, hauling,
spreading, rolling and compaction of asphaltic concrete; and the necessary testing and
quality control, all in accordance with the Contract Drawings and Specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the square meter of paving installed, as calculated from the
Contract Drawings and verified by field measurements. Field measurements shall in-
clude verification of the required thickness. Measurement shall be to the extent of the
required constant thickness and shall exclude tapered edges and paving over-runs
which shall be deemed included in the price of the full thickness asphaltic concrete
wearing course. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
5. Concrete Curbs and Gutters: The work under this item includes all necessary excava-
tion, formwork, supply, placement, finishing and curing of concrete, joint fillers,
backfilling and compaction, and related testing and quality control, in accordance
with Contract Drawings and Specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement of concrete curbs and gutters complete in place shall be by linear meter,
as verified by field measurements along the top of the curb. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
6. Painted Pavement Markings: Work under this item includes preparation of surface,
setting out and premarking, and furnishing and application of marking to the width
and extent shown on the Contract Drawings, including hand applications, if and
where required. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Pavement marking lines shall be measured for payment purpose in net square meters, Formatted: Font: (Default) Times New Roman, 11 pt
as calculated from the Contract Drawings. No deductive measurement shall be made Formatted: Font: Times New Roman
for gaps in broken lane lines. Calculated quantities shall be verified by field meas-
Formatted: Font: (Default) Times New Roman, 11 pt
urements performed by the Contractor and confirmed by the Royal Commission.
Formatted: Font: 8 pt

7. Raised Pavement Markers (Road Studs): Work under this item includes preparation Formatted: Font: 8 pt
of surface, setting out and premarking, and furnishing and installation of markers in- Formatted: Font: 8 pt
cluding epoxy. Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 9 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt

Each raised pavement marker (road stud) provided and installed shall be enumerated Formatted: Font: 8 pt
for payment purposes, subject to confirmation by the Royal Commission. Formatted: Font: 8 pt
Formatted: Font: Times New Roman
8. Concrete Barrier (Double Face): Work under this item includes forms, reinforcement Formatted: Font: (Default) Times New Roman, 11 pt
and concrete for precast concrete double face barrier. It also includes compaction of
Formatted: Font: Times New Roman
subbase and all other work and materials for lifting and placing barrier into their final
position. A 25 m long sloping transition shall be installed as terminal of the full
height concrete barrier. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by linear meter of the barrier in place as verified by field
measurements along the top. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
9. Concrete Barrier (Single Face): Work under this item includes forms, reinforcement,
and concrete for precast concrete single face barrier. It also includes compaction of
subbase and all other work and materials for lifting and placing barrier into their final
position. A 25 m long sloping transition shall be installed as terminal of the full
height concrete barrier. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by linear meter of the barrier in place as verified by field
measurements along the top. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
H. IRRIGATION SYSTEM Formatted: Indent: Left: 0.19"
Formatted: Font: Times New Roman
1. Irrigation system includes, but is not necessarily limited to, furnishing, excavating
for, backfilling for, trenching for, laying out, installing, assembling, connecting, test-
ing, flushing and purging of all PVC pipe from the primary distribution main to the
emitters, furnishing and installing irrigation system field control modules, pressure-
reducing valve assemblies, quick- coupling valve assemblies, gate valves, remote
control valve assemblies, controller enclosures, enclosure signs, valve and water me-
ter boxes with covers, electrical boxes with lids, portland cement concrete pads, pits
and thrust blocks, color-coded lateral-line piping from the primary distribution main
to the remote control valves, lateral piping, fittings and connections; irrigation electri-
cal and wiring, irrigation electrical terminals and sealing packets, plugs and access
sleeves, gravel bedding and backfill material, paint, tubing stakes and wire, wire
markers and marker tape; furnishing and placing and applying portland cement con-
crete and curing materials; compacting backfill; supplying power wiring, conduit and
connection to operate the irrigation system after installation of the system; furnishing
and providing manuals, shop drawings, controller charts, operating devices, tempo-
rary and permanent identification of remote control valves, enclosure keys, mainte-
nance equipment, testing equipment and tools; removing all excess excavated materi-
als, and all associated sampling and testing, all in accordance with the contract draw-
ings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
2. Measurement for the irrigation system(s) components shall be according to the fol-
lowing individual items and respective units. Measurement shall be for furnished, in-
stalled, completed, tested and approved units and shall include all surveying, excava- Formatted: Font: (Default) Times New Roman, 11 pt
tion, bedding, concrete work, backfilling, compaction and grading as required, all in Formatted: Font: Times New Roman
accordance with the contract drawings and specifications. All necessary labor, Formatted: Font: (Default) Times New Roman, 11 pt
equipment and materials required to install each measurement unit shall be included.
Formatted: Font: Times New Roman

a. Secondary irrigation PVC distribution mains and laterals includes the provi- Formatted: Font: 8 pt

sion, installation including excavation, sandbed, backfill and compaction, Formatted: Font: 8 pt
connected, tested and complete. Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 10 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Measurement shall be per linear meter for each size of piping installed, as
measured along the centerline, with no deductions for valves and fittings. Formatted: Font: 8 pt
Formatted: Font: 8 pt
b. Ductile iron irrigation piping includes provision and installation of all coated Formatted: Font: (Default) Times New Roman, 11 pt
and wrapped ductile iron irrigation pipe, including fasteners and sealants re- Formatted: Font: Times New Roman
quired to install irrigation hardline in culverts.
Formatted: Font: (Default) Times New Roman, 11 pt

Measurement shall be per linear meter for each size of pipe including fasten- Formatted: Font: Times New Roman
ers and sealants in culverts installed, as measured along the centerline, with
no deduction for valves and fittings. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
c. PVC irrigation pipe sleeves with reinforced concrete casing provided and in-
stalled under proposed or existing hardscaping, asphalt or concrete paving,
structures or other permanent features. Cleaning, end capping and location
marking of all sleeves is included. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be per linear meter for each size of PVC sleeve installed.

d. Zone control valve includes the provision and installation of valves with box
and cover, connections, concrete base and box markings. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be per each for each size zone control valve installed. Formatted: Indent: Left: 1"

e. Remote control valve includes the provision and installation of valve with
box and cover, 15 cm gravel base, box markings, strainer, gate valve, end
caps, flush valve, pressure gauge, pressure regulator connections, complete. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be per each for each size remote control valve installed.

f. Quick coupling valve includes the provision and installation of valve with
connection to mainline system, box and cover, complete. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be per each quick coupling valve installed. Formatted: Indent: Left: 1"

g. Water meter assembly includes the provision and installation of meter with
box and cover, concrete base, connections, complete. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be per each for each size meter assembly installed. Formatted: Indent: Left: 1"
Formatted: Font: Times New Roman
h. Control wiring for irrigation systems from field control modules to remote
control valves includes the provision and installation of control wiring in Formatted: Font: (Default) Times New Roman, 11 pt
common trench with water piping for irrigation system including connec- Formatted: Font: Times New Roman
tions, pilot wire, common wire, and wire markers at all corners. Formatted: Indent: Left: 1"
Formatted: Font: Times New Roman
Measurement shall be per linear meter of control wiring installed.
Formatted: Font: (Default) Times New Roman, 11 pt

i. Complete field control modules include the provision and installation of field Formatted: Font: Times New Roman
control modules with concrete bases, transformers, enclosures, grounding Formatted: Indent: Left: 1"
system, and connections, complete. Formatted: Font: Times New Roman
Formatted: Font: (Default) Times New Roman, 11 pt
Measurement shall be per each field control module installed.
Formatted: Font: 8 pt

j. Connections from power supply to field control modules including the provi- Formatted: Font: 8 pt
sion and installation with cable, conduit, trenching, backfilling, connections, Formatted: Font: 8 pt
and necessary circuit breakers, complete. Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 11 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"

Measurement shall be per linear meter of power supply installed. Formatted: Font: 8 pt
Formatted: Font: 8 pt
k. Thrust blocks include the provision and installation of concrete thrust blocks Formatted: Font: Times New Roman
cast in place complete. Formatted: Font: Times New Roman
Formatted: Indent: Left: 1"
Measurement shall be enumerated and paid for by each thrust block installed
in place complete. Formatted: Font: Times New Roman
Formatted: Font: (Default) Times New Roman, 11 pt
l. Flexible emitter hose includes the provision and installation of flexible emit- Formatted: Font: Times New Roman
ter hose (10 m per tree) and drip emitters (2.5 m per tree) with excavation,
access sleeve and cover with 10 cm gravel base, testing, backfilling, inci-
dental fittings, connected and installed complete. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be for flexible emitter hose, taking drip emitters and inci-
dental fittings installed complete per tree. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
m. Flush valves include the provision and installation of flush valves, 2 meter
coil of flushing hose, box, cover, 15 cm gravel base complete with fittings. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be per each for each size flush valve installed complete.

n. Drain valves include the provision and installation of drain valves on second-
ary pressure lines with excavation, gravel sump, concrete base, installation
box and marked cover and all incidental materials and connections installed
complete. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be for each drain valve installed, connected and complete.
Formatted: Font: (Default) Times New Roman, 11 pt
o. Pop-up Sprinklers: Work shall include sprinkler heads, PVC pipe connection Formatted: Font: Times New Roman
to main including elbows, tees and fittings, excavation and backfill. Formatted: Indent: Left: 1"
Formatted: Font: Times New Roman
Pop-up Sprinklers shall be enumerated.
Formatted: Font: (Default) Times New Roman, 11 pt
p. Bubblers: Work shall include bubbler head, PVC pipe connection to main Formatted: Font: Times New Roman
including elbows, tees and fittings, excavation and backfill. Formatted: Indent: Left: 1"
Formatted: Font: Times New Roman
Bubblers shall be enumerated.
Formatted: Indent: Left: 0.19"

I. POTABLE WATER SYSTEM Formatted: Font: Times New Roman


Formatted: Indent: Left: 0.69", Hanging: 0.31"
1. Potable Water Pipes: Work shall include PVC pipes laid and jointed in trenches Formatted: Font: (Default) Times New Roman, 11 pt
(measured for payment separately) and including all necessary pipe fittings; elbows, Formatted: Font: Times New Roman
tees and reducers, jointing and joint materials, thrust blocks, connections to existing
Formatted: Font: (Default) Times New Roman, 11 pt
mains or stub- outs, disinfecting and testing as specified.
Formatted: Font: Times New Roman

Pipes shall be measured in linear meters for each diameter. Measurement shall be Formatted: Font: (Default) Times New Roman, 11 pt
made along the centerline of the pipe with no deductions made for fittings. Formatted: Font: Times New Roman
Formatted: Font: (Default) Times New Roman, 11 pt
2. Gate Valves: Work shall include valve, valve box and cover, concrete ring and con-
Formatted: Font: Times New Roman
crete support block, connections to main, additional excavation, disinfecting and test-
ing as specified. Formatted: Font: 8 pt
Formatted: Font: 8 pt
Measurement shall be per each for each size gate valve installed. Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 12 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
3. Service Valves: Work shall include valve, valve box and cover, connections to main,
disinfecting and testing as specified. Formatted: Font: 8 pt
Formatted: Font: 8 pt
Measurement shall be per each for each size service valve installed. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
4. Backflow Preventers: Work shall include backflow preventers, box and cover, exca-
Formatted: Font: (Default) Times New Roman, 11 pt
vation, disinfecting and testing as specified.
Formatted: Font: Times New Roman
Measurement shall be per each for each size backflow preventer installed. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
5. Fire Hydrants: Work shall include fire hydrant assembly, ductile iron pipe and pipe Formatted: Font: (Default) Times New Roman, 11 pt
fittings up to the PVC main, jointing, concrete thrust blocks, additional excavation,
Formatted: Font: Times New Roman
disinfecting and testing.
Formatted: Font: (Default) Times New Roman, 11 pt

Measurement shall be per each fire hydrant installed. Formatted: Font: Times New Roman
Formatted: Font: (Default) Times New Roman, 11 pt
J. SANITARY SEWER SYSTEM Formatted: Font: Times New Roman
Formatted: Indent: Left: 0.19"
1. Sewer Pipes: Work shall include PVC pipes laid and jointed in trenches (measured
Formatted: Font: Times New Roman
separately) including connections to fittings and connections to existing sewer mains
or stub-outs. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Pipes shall be measured in linear meters for each diameter. Measurement shall be
made along the centerline of the pipe with no deductions made for fittings or man-
holes. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
2. Sewer Pipe Fittings: Work shall include jointing to mains and testing as specified. Formatted: Font: Times New Roman

Measurement shall be per each for each type and size of pipe fitting installed.

3. Cast iron Sewer Clean-outs: Work shall include clean-out, wye, removable ferrule,
concrete cap protection, compression plug, connection to sewer main, and testing as
specified. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be per each for each size clean-out installed.

4. Manholes: Work shall include fiberglass manhole, with cast iron cover and frame,
brick adjustment, concrete ring, compacted gravel base, reinforced concrete base,
benching and grouted pipe connections, additional excavation and backfill, and test-
ing as specified. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be per each for each size and type of manhole installed.
Formatted: Indent: Left: 0.19"
K. ELECTRICAL POWER DISTRIBUTION
Formatted: Font: Times New Roman

1. Padmounted Transformer and Padmounted Switchgear: Formatted: Font: Times New Roman
Formatted: Indent: Left: 0.69", Hanging: 0.31"
a. Supply: This shall include, but not necessarily limited to delivery to site, Formatted: Font: Times New Roman
storage, field verification of material at site in good condition, and free of any Formatted: Font: (Default) Times New Roman, 11 pt
damage in transit.
Formatted: Font: Times New Roman

b. Installation: This shall include, but is not necessarily limited to delivery to Formatted: Font: 8 pt

construction site, setting of the unit on foundation pads, anchoring, ground- Formatted: Font: 8 pt
ing, connection of high voltage cables and field tests of equipment for electri- Formatted: Font: 8 pt
cal and mechanical performance in accordance with the manufacturer's rec- Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 13 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Font: 8 pt
ommendations. Padmounted transformer and padmounted switchgear shall
be measured per each unit complete in place and ready for energizing. Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt
2. 15 kV Cables and Accessories: Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
a. Supply: 15 kV cable and accessories supply shall include, but is not neces-
Formatted: Font: Times New Roman
sarily limited to, delivery of cables, splices, terminators, loadbreak connect-
ors and deadbreak connectors to site, storage, and field verification of materi- Formatted: Indent: Left: 0.69", Hanging: 0.31"
al receipt at site in good condition and free of any damage in transit. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Installation: 15 kV cable installation shall include but is not necessarily lim-
ited to delivery of all required materials from storage area to construction
site, checking and cleaning of Royal Commission furnished duct and man-
hole system, installation of cables in ducts and manhole system, identification
tag, cable supports, and grounding of cable supports including field testing of
cables and associated works and sealing of the ducts. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
i. 15 kV cable installation shall be measured per number of linear me-
ters of three single conductor triplexed cable pulled and installed
from the center line of manhole to the center line of manhole and/or
from the center line of manhole to equipment such as padmounted
transformer, padmounted switchgear or 13.8 kV switchgear in Main
Receiving Substations. Where cables are terminated at equipment,
measurement shall be made after completion of satisfactory high
voltage test from the centerline of nearest manhole up to termination.
Where splices are required to be installed, measurement will be done
from the centerline of splice in one manhole to the centerline of the
splice in the adjacent manhole or up to the cable terminators, and ac-
cording to the limits shown on the approved construction drawings. Formatted: Font: (Default) Times New Roman, 11 pt

ii. Installation of splices shall include delivery from storage area to con-
struction site, preparation of cables jointing two sections of the ca-
bles, identification tag, splice, supports, grounding of supports and
testing. Formatted: Font: (Default) Times New Roman, 11 pt

iii. Installation of terminators and connectors shall include delivery from


storage area to construction site, preparation of cables, applying
premolded terminators to the cable, connecting the terminators to
equipment, terminator supports, grounding and testing. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
iv. Installation of splices, terminators and connectors shall be measured
per each set of (3 phase) splices and terminators complete in place
and after satisfactory testing has taken place. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
3. Electrical Distribution: Formatted: Indent: Left: 0.69", Hanging: 0.31"
Formatted: Font: Times New Roman
a. Grounding System for Electrical Distribution (Supply and Installation):
Along the ductbank of 13.8 kV system, grounding shall be provided with 1/C Formatted: Font: Times New Roman
70 mm2 bare copper wire. Wire shall be installed in the concrete encased Formatted: Font: (Default) Times New Roman, 11 pt
duct.
Formatted: Font: Times New Roman

Measurement shall be by the linear meter of wire installed and measured be- Formatted: Font: 8 pt

tween centerline of manhole/handhole. Formatted: Font: 8 pt


Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 14 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt
b. Reinforced Concrete Manhole for HV: This work item includes all types of
manholes shown on drawings. These manholes are used for installation of Formatted: Font: 8 pt
13.8 kV cables. Formatted: Font: 8 pt
Formatted: Font: (Default) Times New Roman, 11 pt
Measurement shall be by the unit of each manhole, complete in place. Formatted: Font: Times New Roman

c. Reinforced Concrete Handholes for LV: This work item includes the low
voltage type reinforced concrete handholes, including heavy duty cover. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the unit of each handhole, complete in place.

d. x mm PVC Duct Concrete Encased Complete: This work item includes Formatted: Font: Times New Roman
the reinforced concrete encased duct under road crossings, complete with
mm dia. PVC pipes.

Measurement shall be by the linear meter of x mm duct complete.

e. x mm PVC Duct Concrete Encased Complete: This work item includes Formatted: Font: Times New Roman
the supply and installation of the concrete encased duct.

Measurement shall be by the linear meter of 4 x 150 mm duct complete.

4. Roadway Lighting: Formatted: Indent: Left: 0.69", Hanging: 0.31"


Formatted: Font: Times New Roman
a. Lighting Column Double Arm, 12 m High Complete For Roadway Lighting:
This work item includes supply and installation of 12 m high tapered fiber-
glass reinforced polyester pole with 1.5 m long arm, and junction box with
15A, 2P breaker in the handhole of the pole, including concrete base. This
column shall be installed in the roadway median apart from the bridge. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the number of lighting columns installed complete
in-place with lighting fixtures and tested. No separate payment will be made
for lighting column without lighting fixture. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Lighting Column Single Arm, 12 m High Complete For Roadway Lighting:
This work item includes supply and installation of 12 m high tapered fiber-
glass reinforced polyester pole with 2.75 m long arm, and junction box with
15A, 2P breaker in the handhole of the pole, including concrete base. This
column shall be installed in the roadway median or along the roadway apart
from the bridge as shown on the Contract drawings. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the number of lighting columns installed complete
in-place with lighting fixtures and tested. No separate payment for lighting Formatted: Font: (Default) Times New Roman, 11 pt
column will be made without lighting fixture.
Formatted: Font: Times New Roman

c. 400 Watt High Pressure Sodium Lighting Fixture Complete: This work item Formatted: Font: (Default) Times New Roman, 11 pt

includes the 400 watt fixture complete with the lamp and the ballast. The fix- Formatted: Font: Times New Roman
ture shall have diecast aluminum corrosion resistant housing, water and dust Formatted: Font: (Default) Times New Roman, 11 pt
tight and aluminum reflector and hinged refractor. Formatted: Font: Times New Roman
Formatted: Font: Times New Roman
Each fixture provided and installed shall be enumerated for payment purpos-
es, subject to confirmation by the Royal Commission. Formatted: Font: 8 pt
Formatted: Font: 8 pt
d. Low Voltage Cable, 4 x 16 mm2, Direct Burial. Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 15 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
Measurement shall be by the linear meter of cut cable length installed, termi-
nated and tested. Formatted: Font: 8 pt
Formatted: Font: 8 pt
e. Low Voltage Cable, 4 x 10 mm2, Direct Burial. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the linear meter of cut cable length installed, termi-
Formatted: Font: Times New Roman
nated and tested.
Formatted: Font: (Default) Times New Roman, 11 pt
f. Column Cabling: Included in this work item are PVC insulated copper ca- Formatted: Font: Times New Roman
bles, installed as per Contract Drawings and specifications with final connec-
tions to the 480V lighting system. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the linear meter of cut cable length measured be-
tween termination points along the routing. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
g. Removal of Existing Roadway Lighting Columns: Includes disconnection
from the 480 volt lighting system and the salvaging of the foundation, pole
and luminaire. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the unit of each column.

h. Reinstallation of Removed Roadway Lighting Columns: Includes the reset-


ting of the foundation, pole and luminaire salvaged from above. Reconnec-
tion to the 480 volt roadway lighting system is also included. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Measurement shall be by the unit of each column.

i. Reinstallation of Existing Roadway Lighting Columns: Includes the raising in Formatted: Font: Times New Roman
elevation of the existing columns and luminaries as required due to the new
grade level. Also included is all necessary disconnecting and reconnecting
the 480 volt lighting system.

Measurement shall be by the unit of each column.

5. Area Lighting System: Formatted: Indent: Left: 0.69", Hanging: 0.31"


Formatted: Font: Times New Roman
a. Supply Cable (Direct Burial): Work shall include supply cable direct buried
in sand fill, including trench excavation and backfill, concrete cap, plastic
warning tape, splicing, junctions, terminations and connections to transformer
panels. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Supply cable shall be measured in horizontal linear meters. Vertical rises
shall be included in horizontal price. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Supply Cable (In PVC conduit): Work shall include conduit and cable in
sandfill, including trench excavation and backfill, splicing, junctions, termi-
nations and connections to transformer panels or direct burial cable. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
Supply cable and conduit shall be measured in linear meters. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
c. Area Lighting Fixtures: Work shall include poles or bollards as specified,
luminaries, accessories, internal wiring to connect to direct buried cable, con- Formatted: Font: 8 pt

crete base, anchor bolts, excavation and backfill. Formatted: Font: 8 pt


Formatted: Font: 8 pt
Area Lighting fixtures shall be enumerated for payment by type. Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 16 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Font: 8 pt

6. General Electrical Work: Formatted: Tab stops: 6.25", Right + Not at 6.5"
Formatted: Font: 8 pt
a. Cable: Formatted: Indent: Left: 0.69", Hanging: 0.31"
Formatted: Font: Times New Roman
i. Cable includes, but is not necessarily limited to, furnishing and in-
Formatted: Font: Times New Roman
stalling cable, making electrical connections at handholes and lights,
sealing cable ends, and all assorted sampling and testing, all in ac- Formatted: Indent: Left: 1"
cordance with the contract drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
ii. Cable shall be measured by the linear meter, for each size complete
in place, along the centerline of the line from handhole to handhole
or from light fixture to light fixture, according to the limits shown on
the approved construction drawings and verified in the field. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
b. Conduit: Formatted: Indent: Left: 1"
Formatted: Font: Times New Roman
i. Conduit includes, but is not necessarily limited to, excavation for in-
stallation of conduits in earth including compaction of the trench bot-
tom; furnishing, placing, installing and connecting conduit in earth or
in concrete, fittings and accessories; placing and compacting trench
backfill materials; disposing of excess excavated materials, and all
associated sampling and testing; all in accordance with the contract
drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt

ii. Conduit shall be measured by the linear meter, for each size complete
in place, along the centerline of the conduit according to the limits
shown on the approved construction drawings and verified in the
field. Formatted: Font: (Default) Times New Roman, 11 pt

c. Duct: Formatted: Indent: Left: 1"


Formatted: Font: Times New Roman
i. 4 Way, 150 mm Primary Duct includes, but is not necessarily limited
to, excavation for installation of primary duct bank; compaction of
the trench bottom; furnishing and placing portland cement concrete
for duct bank; furnishing and installing concrete forms or forming the
slabs by neat line excavation; furnishing, placing, installing and con-
necting primary duct in banks; including duct, fittings and accesso-
ries; furnishing, placing and compacting primary duct bank trench
backfill materials; mandreling the ducts; placement of pull wire in
each duct; sealing of each duct; disposing of excess excavated mate-
rials; and all associated sampling and testing, all in accordance with
the contract drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
ii. 4 Way, 150 mm Primary Duct shall be measured by the linear meter,
complete in place, along the centerline of the duct bank according to
the limits shown on the approved construction drawings and verified
in the field. Formatted: Font: (Default) Times New Roman, 11 pt

Formatted: Indent: Left: 1"


d. Handhole:
Formatted: Font: Times New Roman

i. Handhole, Precast includes, but is not necessarily limited to, excava- Formatted: Font: 8 pt

tion for the installation of handholes compacting the foundation soils Formatted: Font: 8 pt
beneath each handhole; furnishing form materials and constructing Formatted: Font: 8 pt
forms for handholes, and their frames and covers; furnishing, placing, Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 17 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Tab stops: 6.25", Right + Not at 6.5"
installing and connecting reinforcing steel, cover frames, covers, and
accessories; furnishing, placing, installing cable hanger rails, cable Formatted: Font: 8 pt
hangers, grounding system, end bells, and accessories; furnishing, Formatted: Font: 8 pt
placing and compacting backfill materials for handholes; disposing of
excess excavated materials; and all associated sampling and testing;
all in accordance with the contract drawings and specifications. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
ii. Handhole, Precast shall be measured per each, complete in place, ac-
cording to the number of units shown on the approved construction
drawings and verified in the field. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
7. Telecommunications: Formatted: Indent: Left: 0.69", Hanging: 0.31"
Formatted: Font: Times New Roman
1. Reinforced Concrete Manhole type : This work item includes the
Type manhole as per construction details, shown on the Contract Draw-
ings.

Measurement shall be by the unit of each manhole, complete in place.

2. x mm PVC Duct Concrete Encased Complete: This work item includes


the supply and installation of x mm dia. PVC conduits complete as per
construction details shown on the Contract Drawings.

Measurement shall be by the linear meter of 4 x 100 mm duct installed in-


cluding pull boxes. Formatted: Font: (Default) Times New Roman, 11 pt
Formatted: Font: Times New Roman
3. x mm Rigid Galvanized Conduits Complete With Splice Point and Hang-
ers: This work item includes the supply and installation of x mm dia. rig-
id galvanized steel conduits suspended with metal hangers under the bridge
with pull boxes in every 80 m apart, as per construction details shown on the
drawings.

Measurement shall be by the linear meter of x mm conduit complete in-


cluding pull boxes.

L. <Insert unit price number according to Division> <Insert unit price item>: Formatted: Indent: Left: 0.19", Hanging: 0.5"
Formatted: Font: Bold
1. <Insert unit price item description> according to Section <Insert Section
Formatted: Font: Bold
number> <Insert Section title>.
Formatted: Indent: Left: 0.69", Hanging: 0.31"

2. <Insert unit of measurement>. Formatted: Font: Bold


Formatted: Font: Bold
A. Unit Price No. 1: Removal of unsatisfactory soil and replacement with satisfactory soil Formatted: Font: Bold
material.
Formatted: Font: Bold

1. Description: Unsatisfactory soil excavation and disposal off-site and replacement


with satisfactory fill material or engineered fill from off-site, as required, according to
Section 312000 "Earth Moving."
2. Unit of Measurement: Cubic yard (Cubic meter) of soil excavated, based on in-place
surveys of volume before and after removal.
3. Quantity Allowance: Coordinate unit price with allowance adjustment requirements
in Section 012100 "Allowances." Formatted: Font: 8 pt
Formatted: Font: 8 pt
B. Unit Price No. 2: Rock excavation and replacement with satisfactory soil material. Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 18 of 19 012200 - 2Contract


No.
Copyright 2015 AIARoyal Commission - Yanbu MasterSpec PremiumUnit Prices 09/15August 2016 Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Font: 8 pt
1. Description: Classified rock excavation and disposal off-site and replacement with
satisfactory fill material or engineered fill from off-site, as required, according to Formatted: Font: 8 pt
Section 312000 "Earth Moving." Formatted: Tab stops: 6.25", Right + Not at 6.5"
2. Unit of Measurement: Cubic yard (Cubic meter) of rock excavated, based on survey
of in-place surveys volume of before and after removal.
3. Quantity Allowance: Coordinate unit price with allowance adjustment requirements
in Section 012100 "Allowances."

C. Unit Price No. 3: Cutting and patching of concrete slabs-on-grade.

1. Description: Cutting of new or existing concrete slabs-on-grade up to [6 inches (152


mm)] <Insert dimension> thick, removal and excavation as required, and
subsequent backfill, compaction, and patching of concrete according to
Section 017300 "Execution." not otherwise indicated in the Contract Documents.
2. Unit of Measurement: Square feet (Square meters) of concrete removed.

D. Unit Price No. 4: Miscellaneous and structural steel.

1. Description: Miscellaneous lintels and other supports not otherwise indicated in the
Contract Documents, according to Section 051200 "Structural Steel Framing" and
Section 055000 "Metal Fabrications."
2. Unit of Measurement: Cost in place of pounds (kilograms) of fabricated steel as
indicated on itemized invoice of steel supplier.

E. Unit Price No. 5: Elevator jack hole rock.

1. Description: Subsurface soil conditions that refuse conventional auger excavation of


the elevator jack hole, according to Section 142400 "Hydraulic Elevators."
2. Unit of Measurement: Depth in feet (meters) of drilling required as indicated on the
elevator Installer's invoice.
3. Assigned Unit Cost: Owner will pay [$250.00] <Insert dollar amount> per unit foot
(meter) of rock drilling required.

F. Unit Price No. <Insert unit-price number> - <Insert unit-price item>:

1. Description: <Insert unit-price item description> according to Section <Insert


Section number> "<Insert Section title>."
2. Unit of Measurement: <Insert unit of measurement>.
3. Quantity Allowance: Coordinate unit price with allowance adjustment requirements
in Section 012100 "Allowances."

END OF SECTION 012200

Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Font: 8 pt
Formatted: Font: 8 pt

UNIT PRICES01 22 00 Page 19 of 19 012200 - 2Contract


No.

You might also like