0% found this document useful (0 votes)
71 views1 page

Power System Study - PSS

The power system study achieved its targets of conducting a site survey of the primary substation and modeling the actual load details of different feeders in the DigSlient software based on data collected during the site survey. The load information was used to create a DigSlient model of the new substation.

Uploaded by

sumitsharma2010
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
71 views1 page

Power System Study - PSS

The power system study achieved its targets of conducting a site survey of the primary substation and modeling the actual load details of different feeders in the DigSlient software based on data collected during the site survey. The load information was used to create a DigSlient model of the new substation.

Uploaded by

sumitsharma2010
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Power System Study (Targets Achieved)

1) Site Survey for the primary substation


2) Actual load details of different feeders were noted during the site and same has been modelled
in the DigSlient software for the Substation DigSlient Software modelling for the New
Milestones for Power System Study

You might also like