Formats of Soils

1. The document describes procedures for testing soil properties including grain size analysis, proctor compaction tests, and calibration of sand for field density tests. 2. The grain size analysis determines the percentages of gravel, sand, silt, and clay in a soil sample. 3. The proctor compaction test is conducted to determine the maximum dry density and optimum moisture content of a soil by compacting it at different moisture levels. 4. Calibration of sand for field density tests involves determining the weight of sand in a cylinder that will be used for field density testing.

Uploaded by

Shesha Shayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
418 views23 pages

Formats of Soils

1. The document describes procedures for testing soil properties including grain size analysis, proctor compaction tests, and calibration of sand for field density tests. 2. The grain size analysis determines the percentages of gravel, sand, silt, and clay in a soil sample. 3. The proctor compaction test is conducted to determine the maximum dry density and optimum moisture content of a soil by compacting it at different moisture levels. 4. Calibration of sand for field density tests involves determining the weight of sand in a cylinder that will be used for field density testing.

Uploaded by

Shesha Shayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 23

FIELD Quality plan

Sewage Treatment Plants at


KEC- Doddabele,Yellamalappachetty
WATERLEAU QP.No-1 REV.no-0 and Intermediate Sewage pumping Station and
(JV) Pumping Mains at Sadarmangala

GRAIN SIZE ANALYSIS OF SOIL


(As per IS : 2720, Part - IV)

Lab. Ref No._________________________________

Sample No. : ____________________________________________

Source Identification No. : ____________________________________________

Location of Sampling : ____________________________________________

Date of Sampling : ____________________________________________

Sampled By : ____________________________________________

Date of Testing : ____________________________________________

Total w.t. of dry sample taken for testing : ____________________________________________

Sieve Weight Cummulative Cummulative % Passing Grading


size Retained (gms) Weight % Weight Limits
(mm) Retained (gms) Retained
37.5
19 mm 0 0 0 100
4.75 mm 320.5 320.5 32.05 67.95
2.00 mm 210.4 530.9 53.09 46.91
4.25 mm 150.6 681.5 68.15 31.85
0.075 mm 180.7 862.2 86.22 13.78
Pan

Gravel Content =______________ % 32.05


Sand Content =______________ % 54.17
Silt & Clay Content =______________ % 13.78

Signature of Contractor Signature of Client


FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC-
QP.No-1 and Intermediate Sewage pumping Station and Pumping Mains at
WATERLEAU REV.no-0
Sadarmangala
(JV)

PROCTOR'S COMPACTION TEST


As per IS 2720 (PART 7)

Sample No Lab Ref No.


Source ID Date of Sampling
Loaction of Sampling Date of Test

Mould No : wt. of Mould, W1 (g) : Volume of mould , V (cc) :


Trial No : I II III IV V

wt. of Wet Soil + Mould, W2 (g)


wt. of Wet Soil, W3=(W2-W1) (g)
Wet Density, Yb = W3/V (g/cc)

Container No.
wt. of Container,W5 (g)
wt. of Wet Soil + Cont., W6 (g)
wt. of Dry Soil + Cont.,W7 (g)
wt. of Water, W8=(W6-W7) (g)
wt. of Dry Soil, W9=(W7-W5) (g)
Water Content w =W8/W9 (%)
Dry Density Yd = 100x(Yb/100+w) (g/cc)

Rammer Wt.
Blows/layer
No.of layers

RESULTS
Dry Density

MDD =
OMC =

Remarks :

OMC
Signature of Contractor Signature of Client
malappachetty
Pumping Mains at

VI

: 2.6 kg
: 25/55 blows
: 3 layers

RESULTS
gnature of Client
FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC-
QP.No-1 and Intermediate Sewage pumping Station and Pumping Mains at
WATERLEAU REV.no-0
Sadarmangala
(JV)

PROCTOR'S COMPACTION TEST


As per IS 2720 (PART 8)

Sample No Lab Ref No.


Source ID Date of Sampling
Loaction of Sampling Date of Test

Mould No : wt. of Mould, W1 (g) : Volume of mould , V (cc) :


Trial No : I II III IV V

wt. of Wet Soil + Mould, W2 (g)


wt. of Wet Soil, W3=(W2-W1) (g)
Wet Density, Yb = W3/V (g/cc)

Container No.
wt. of Container,W5 (g)
wt. of Wet Soil + Cont., W6 (g)
wt. of Dry Soil + Cont.,W7 (g)
wt. of Water, W8=(W6-W7) (g)
wt. of Dry Soil, W9=(W7-W5) (g)
Water Content w =W8/W9 (%)
Dry Density Yd = 100x(Yb/100+w) (g/cc)

Rammer Wt.
Blows/layer
No.of layers

RESULTS
Dry Density

MDD =
OMC =

Remarks :

1 2 3 4 5 6
OMC
Signature of Contractor Signature of Client
etty
ng Mains at

VI

: 4.9 kg
: 25/55 blows
: 5 layers

RESULTS
gnature of Client
FIELD Quality plan
Sewage Treatment Plants at
KEC- Doddabele,Yellamalappachetty
QP.No-1
WATERLEAU REV.no-0 and Intermediate Sewage pumping Station and
(JV) Pumping Mains at Sadarmangala

CALIBRATION OF SAND FOR FIELD DENSITY TEST


(AS PER IS : 2720 (PART 28)

Cylinder Equipment No. Lab Ref. No

Description of Cylinder Date of Calibration

Source of Sand Size of Sand Used

A. Determination of weight of Sand in Cone


Test No. 1 2 3

Initial Weight of Cylinder + Sand W1 gm

Final Weight of Cylinder + Sand W2 gm

Weight of Sand in Cone (A-B) W3 =(W1 - W2) gm

Average wt of Sand in Cone gm

B. Determination of Bulk Density of Sand

Test No. 1 2 3

Average Weight of Sand in cone W3 gm

Weight of Cylinder + Sand before pouring W1 gm

Weight of Cylinder + Sand after pouring in


W4 gm
Clabrating Container
Weight of Sand in Calibrating Container W5 =
gm
((W1-W3)-W4)

Volume of Calibrating Container V cc

Bulk Density of Sand W5 / V gm/cc

Average Bulk Density gm/cc

Remarks :

Signature of Contractor Signature of Client


FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC- QP.No-1
and Intermediate Sewage pumping Station and Pumping
WATERLEAU
(JV) REV.no-0 Mains at Sadarmangala

FREE SWELL INDEX OF SOIL


(As per IS : 2720 Part - 40)

Sample No. Lab. Ref. No.

Source ID Date of Sampling

Location of Sampling Date of Testing

OBSERVATION TABLE

Period of Submergence

Dry wt. of Soil

Volume of Soil in Water = Vd After Specified Period of


Submergence

Volume of Soil in Kerosence = Vk

Free Swell Index, Per unit = (Vd-Vk) VK x 100)

Remarks

Signature of Contractor Signature of Client


amalappachetty
n and Pumping

Signature of Client
FIELD Quality plan
Sewage Treatment Plants at
Doddabele,Yellamalappachetty
QP.No-1
KEC-WATERLEAU (JV) REV.no-0
and Intermediate Sewage pumping Station and
Pumping Mains at Sadarmangala

ATTERBERG'S LIMIT
(As per IS : 2720 Part - 5 )

Sample No Lab Ref No.


Source ID Date of Sampling

Location of Sampling Date of Test


Sr.No. Determination Details Liquid Limit Plastic Limit
1 No. of Blows 1 2

2 Container identification no.

3 Weight of empty container, gm (W1)

4 Weight of wet soil + container, gm (W2)

5 Weight of dry soil + container, gm (W3)

6 Weight of water, gm (W4 = W2 - W3)

7 Weight of dry soil, gm W5 = W3 - W1)

8 Moisture content, % (MC = W4/-W5x100)

60

55

50
Moi 45
stu
re 40
Co
nte 35
nt
(%) 30

25

20

15

10

0
0 5 10 15 20 25 30 35 40 45 50 55 60
Number of Blows
Liquid Limit to be determined at 25 Blows
Liquid Limit (LL) =
Avg. Plastic Limit (PL) =
Plastcity Index (Pl) % = LL - PL =

Signature of Contractor Signature of Client


at
hetty
g Station and
ngala

Avg.

55 60
FIELD Quality plan
Sewage Treatment Plants at
Doddabele,Yellamalappachetty
KEC-WATERLEAU QP.No-1
and Intermediate Sewage pumping Station and Pumping
(JV) REV.no-0
Mains at Sadarmangala

Name of Work :-
Name of Contractor:

FIELD DENSITY TEST (CORE CUTTER METHOD)


As per IS 2720 (Part 29)

Date :
Representing test chainage . From: To
Test pit chainage
Test pit chainage
Offset (m)

Layer No. or level


Depth of Hole (mm)

Source of Material (name & chainage)


FIELD DENSITY
Core Cutter No.
wt. of Core cutter (W1) (g)

wt. of Core cutter+Wet soil (W2) (g)

wt. of wet matreial (Ww = W2-W1) (g)

Volume of Core Cutter (V3) (g)

Bulk density of material {Yb=(Ww/V3)} (g/cc)

MOISTURE CONTENT
Container No.
Weight of empty container, gm (W1)
Weight of wet soil + container, gm (W2)
Weight of dry soil + container, gm (W3)
Weight of water, gm (W4 = W2 - W3)
Weight of dry soil, gm W5 = W3 - W1)
Moisture content, % (MC = W4/-W5x100)
RESULTS
Field max.dry density {Yd=100XYb/(100+M)} (g/cc)

Lab. Max dry density (Ymdd ) (g/cc)

Optimum mositure content (%)

Compaction obtainted (100xYd/Ymdd) (%)

% Compaction required (%)

Remarks : Pass / Fail

Signature of Contractor Signature of CCD Signature of FQA


FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC-WATERLEAU QP.No-1 and Intermediate Sewage pumping Station and Pumping
(JV) REV.no-0 Mains at Sadarmangala

FIELD DENSITY TEST (SAND REPLACEMENT METHOD)


As per IS 2720 (Part 28)

RFI No. : Date :


Representing test chainage From : km To: km
Test pit chainage
Offset (m)

Layer No. or level


Depth of Hole (mm)

Source of Material (name & chainage)


FIELD DENSITY
Pouring Cylinder No.
wt. of wet matreial from hole (Ww) (g)

wt. of sand+cylinder before pouring (W1) (g)

wt. of sand+cylinder after pouring (W2) (g)

wt. of sand in cone (W3) (g)

wt. of sand in hole (W4=W1-W2-W3) (g)

Volum of Hole (
Bulk density of sand (Ys) (g/cc)

Bulk density of material {Yb=(Ww/W4)XYs} (g/cc)

MOISTURE CONTENT
Container No.
Weight of empty container, gm (W1)
Weight of wet soil + container, gm (W2)
Weight of dry soil + container, gm (W3)
Weight of water, gm (W4 = W2 - W3)
Weight of dry soil, gm W5 = W3 - W1)
Moisture content, % (MC = W4/-W5x100)
RESULTS
Field max.dry density {Yd=100XYb/(100+W)} (g/cc)

Lab. Max dry density (Ymdd ) (g/cc)

Optimum mositure content (%)

Compaction obtainted (100xYd/Ymdd) (%)

% Compaction required (%)

Remarks : Pass / Fail


Signature of Contractor Signature of Client
FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC-WATERLEAU QP.No-1 and Intermediate Sewage pumping Station and Pumping
(JV) REV.no-0 Mains at Sadarmangala

FIELD DENSITY TEST (SAND REPLACEMENT METHOD)


As per IS 2720 (Part 28)

RFI No. : Date :


Representing test chainage From : To:
Test pit chainage
Offset (m)

Layer No. or level


Depth of Hole (mm)

Source of Material (name & chainage)


FIELD DENSITY
Pouring Cylinder No.
wt. of wet matreial from hole (Ww) (g)

wt. of sand+cylinder before pouring (W1) (g)

wt. of sand+cylinder after pouring (W2) (g)

wt. of sand in cone (W3) (g)

wt. of sand in hole (W4=W1-W2-W3) (g)

Bulk density of sand (Ys) (g/cc)

Bulk density of material {Yb=(Ww/W4)XYs} (g/cc)

MOISTURE CONTENT (By Speedy moisture method)


Speedy Moisture meter no.
Moisture meter reading (%)

Corrected moisture content (w) (%)

RESULTS
Field max.dry density {Yd=100XYb/(100+W)} (g/cc)

Lab. Max dry density (Ymdd ) (g/cc)

Optimum mositure content (%)

Compaction obtainted (100xYd/Ymdd) (%)

% Compaction required (%)

Remarks : Pass / Fail

Signature of Contractor Signature of CCD Signature of FQA


FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
QP.No-1 REV.no- and Intermediate Sewage pumping Station and Pumping Mains at
KEC-WATERLEAU (JV) 0 Sadarmangala

SUMMARY SHEET OF SOIL TEST RESULT


BA ID No.: Estimated Qty. m3 :
Location: Village:

Sample Grain Size Analysis Gravel Sand Silt & Free Swell Atterbergs limits Proctor Test
No. 37.5 19 4.75 2 42.5 75 as per Content Clay as Index of IS : 2720 - Part 5 IS : 2720 - Part 8
mm mm mm mm mm mm IS : 2720 IS : 2720 Per Soil LL PL PI MDD OMC
Part 4 Part 4 IS : 2720 IS : 2720 (%) (%) (%) (gm/cc) (%)
Part 4 Part 40

Remarks :
Signature of Contractor Signature of Client
(TOTEM Infrastructure Ltd) (NTPC Ltd)