FIELD Quality plan
Sewage Treatment Plants at
KEC- Doddabele,Yellamalappachetty
WATERLEAU QP.No-1 REV.no-0 and Intermediate Sewage pumping Station and
(JV) Pumping Mains at Sadarmangala
GRAIN SIZE ANALYSIS OF SOIL
(As per IS : 2720, Part - IV)
Lab. Ref No._________________________________
Sample No. : ____________________________________________
Source Identification No. : ____________________________________________
Location of Sampling : ____________________________________________
Date of Sampling : ____________________________________________
Sampled By : ____________________________________________
Date of Testing : ____________________________________________
Total w.t. of dry sample taken for testing : ____________________________________________
Sieve Weight Cummulative Cummulative % Passing Grading
size Retained (gms) Weight % Weight Limits
(mm) Retained (gms) Retained
37.5
19 mm 0 0 0 100
4.75 mm 320.5 320.5 32.05 67.95
2.00 mm 210.4 530.9 53.09 46.91
4.25 mm 150.6 681.5 68.15 31.85
0.075 mm 180.7 862.2 86.22 13.78
Pan
Gravel Content =______________ % 32.05
Sand Content =______________ % 54.17
Silt & Clay Content =______________ % 13.78
Signature of Contractor Signature of Client
FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC-
QP.No-1 and Intermediate Sewage pumping Station and Pumping Mains at
WATERLEAU REV.no-0
Sadarmangala
(JV)
PROCTOR'S COMPACTION TEST
As per IS 2720 (PART 7)
Sample No Lab Ref No.
Source ID Date of Sampling
Loaction of Sampling Date of Test
Mould No : wt. of Mould, W1 (g) : Volume of mould , V (cc) :
Trial No : I II III IV V
wt. of Wet Soil + Mould, W2 (g)
wt. of Wet Soil, W3=(W2-W1) (g)
Wet Density, Yb = W3/V (g/cc)
Container No.
wt. of Container,W5 (g)
wt. of Wet Soil + Cont., W6 (g)
wt. of Dry Soil + Cont.,W7 (g)
wt. of Water, W8=(W6-W7) (g)
wt. of Dry Soil, W9=(W7-W5) (g)
Water Content w =W8/W9 (%)
Dry Density Yd = 100x(Yb/100+w) (g/cc)
Rammer Wt.
Blows/layer
No.of layers
RESULTS
Dry Density
MDD =
OMC =
Remarks :
OMC
Signature of Contractor Signature of Client
malappachetty
Pumping Mains at
VI
: 2.6 kg
: 25/55 blows
: 3 layers
RESULTS
gnature of Client
FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC-
QP.No-1 and Intermediate Sewage pumping Station and Pumping Mains at
WATERLEAU REV.no-0
Sadarmangala
(JV)
PROCTOR'S COMPACTION TEST
As per IS 2720 (PART 8)
Sample No Lab Ref No.
Source ID Date of Sampling
Loaction of Sampling Date of Test
Mould No : wt. of Mould, W1 (g) : Volume of mould , V (cc) :
Trial No : I II III IV V
wt. of Wet Soil + Mould, W2 (g)
wt. of Wet Soil, W3=(W2-W1) (g)
Wet Density, Yb = W3/V (g/cc)
Container No.
wt. of Container,W5 (g)
wt. of Wet Soil + Cont., W6 (g)
wt. of Dry Soil + Cont.,W7 (g)
wt. of Water, W8=(W6-W7) (g)
wt. of Dry Soil, W9=(W7-W5) (g)
Water Content w =W8/W9 (%)
Dry Density Yd = 100x(Yb/100+w) (g/cc)
Rammer Wt.
Blows/layer
No.of layers
RESULTS
Dry Density
MDD =
OMC =
Remarks :
1 2 3 4 5 6
OMC
Signature of Contractor Signature of Client
etty
ng Mains at
VI
: 4.9 kg
: 25/55 blows
: 5 layers
RESULTS
gnature of Client
FIELD Quality plan
Sewage Treatment Plants at
KEC- Doddabele,Yellamalappachetty
QP.No-1
WATERLEAU REV.no-0 and Intermediate Sewage pumping Station and
(JV) Pumping Mains at Sadarmangala
CALIBRATION OF SAND FOR FIELD DENSITY TEST
(AS PER IS : 2720 (PART 28)
Cylinder Equipment No. Lab Ref. No
Description of Cylinder Date of Calibration
Source of Sand Size of Sand Used
A. Determination of weight of Sand in Cone
Test No. 1 2 3
Initial Weight of Cylinder + Sand W1 gm
Final Weight of Cylinder + Sand W2 gm
Weight of Sand in Cone (A-B) W3 =(W1 - W2) gm
Average wt of Sand in Cone gm
B. Determination of Bulk Density of Sand
Test No. 1 2 3
Average Weight of Sand in cone W3 gm
Weight of Cylinder + Sand before pouring W1 gm
Weight of Cylinder + Sand after pouring in
W4 gm
Clabrating Container
Weight of Sand in Calibrating Container W5 =
gm
((W1-W3)-W4)
Volume of Calibrating Container V cc
Bulk Density of Sand W5 / V gm/cc
Average Bulk Density gm/cc
Remarks :
Signature of Contractor Signature of Client
FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC- QP.No-1
and Intermediate Sewage pumping Station and Pumping
WATERLEAU
(JV) REV.no-0 Mains at Sadarmangala
FREE SWELL INDEX OF SOIL
(As per IS : 2720 Part - 40)
Sample No. Lab. Ref. No.
Source ID Date of Sampling
Location of Sampling Date of Testing
OBSERVATION TABLE
Period of Submergence
Dry wt. of Soil
Volume of Soil in Water = Vd After Specified Period of
Submergence
Volume of Soil in Kerosence = Vk
Free Swell Index, Per unit = (Vd-Vk) VK x 100)
Remarks
Signature of Contractor Signature of Client
amalappachetty
n and Pumping
Signature of Client
FIELD Quality plan
Sewage Treatment Plants at
Doddabele,Yellamalappachetty
QP.No-1
KEC-WATERLEAU (JV) REV.no-0
and Intermediate Sewage pumping Station and
Pumping Mains at Sadarmangala
ATTERBERG'S LIMIT
(As per IS : 2720 Part - 5 )
Sample No Lab Ref No.
Source ID Date of Sampling
Location of Sampling Date of Test
Sr.No. Determination Details Liquid Limit Plastic Limit
1 No. of Blows 1 2
2 Container identification no.
3 Weight of empty container, gm (W1)
4 Weight of wet soil + container, gm (W2)
5 Weight of dry soil + container, gm (W3)
6 Weight of water, gm (W4 = W2 - W3)
7 Weight of dry soil, gm W5 = W3 - W1)
8 Moisture content, % (MC = W4/-W5x100)
60
55
50
Moi 45
stu
re 40
Co
nte 35
nt
(%) 30
25
20
15
10
0
0 5 10 15 20 25 30 35 40 45 50 55 60
Number of Blows
Liquid Limit to be determined at 25 Blows
Liquid Limit (LL) =
Avg. Plastic Limit (PL) =
Plastcity Index (Pl) % = LL - PL =
Signature of Contractor Signature of Client
at
hetty
g Station and
ngala
Avg.
55 60
FIELD Quality plan
Sewage Treatment Plants at
Doddabele,Yellamalappachetty
KEC-WATERLEAU QP.No-1
and Intermediate Sewage pumping Station and Pumping
(JV) REV.no-0
Mains at Sadarmangala
Name of Work :-
Name of Contractor:
FIELD DENSITY TEST (CORE CUTTER METHOD)
As per IS 2720 (Part 29)
Date :
Representing test chainage . From: To
Test pit chainage
Test pit chainage
Offset (m)
Layer No. or level
Depth of Hole (mm)
Source of Material (name & chainage)
FIELD DENSITY
Core Cutter No.
wt. of Core cutter (W1) (g)
wt. of Core cutter+Wet soil (W2) (g)
wt. of wet matreial (Ww = W2-W1) (g)
Volume of Core Cutter (V3) (g)
Bulk density of material {Yb=(Ww/V3)} (g/cc)
MOISTURE CONTENT
Container No.
Weight of empty container, gm (W1)
Weight of wet soil + container, gm (W2)
Weight of dry soil + container, gm (W3)
Weight of water, gm (W4 = W2 - W3)
Weight of dry soil, gm W5 = W3 - W1)
Moisture content, % (MC = W4/-W5x100)
RESULTS
Field max.dry density {Yd=100XYb/(100+M)} (g/cc)
Lab. Max dry density (Ymdd ) (g/cc)
Optimum mositure content (%)
Compaction obtainted (100xYd/Ymdd) (%)
% Compaction required (%)
Remarks : Pass / Fail
Signature of Contractor Signature of CCD Signature of FQA
FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC-WATERLEAU QP.No-1 and Intermediate Sewage pumping Station and Pumping
(JV) REV.no-0 Mains at Sadarmangala
FIELD DENSITY TEST (SAND REPLACEMENT METHOD)
As per IS 2720 (Part 28)
RFI No. : Date :
Representing test chainage From : km To: km
Test pit chainage
Offset (m)
Layer No. or level
Depth of Hole (mm)
Source of Material (name & chainage)
FIELD DENSITY
Pouring Cylinder No.
wt. of wet matreial from hole (Ww) (g)
wt. of sand+cylinder before pouring (W1) (g)
wt. of sand+cylinder after pouring (W2) (g)
wt. of sand in cone (W3) (g)
wt. of sand in hole (W4=W1-W2-W3) (g)
Volum of Hole (
Bulk density of sand (Ys) (g/cc)
Bulk density of material {Yb=(Ww/W4)XYs} (g/cc)
MOISTURE CONTENT
Container No.
Weight of empty container, gm (W1)
Weight of wet soil + container, gm (W2)
Weight of dry soil + container, gm (W3)
Weight of water, gm (W4 = W2 - W3)
Weight of dry soil, gm W5 = W3 - W1)
Moisture content, % (MC = W4/-W5x100)
RESULTS
Field max.dry density {Yd=100XYb/(100+W)} (g/cc)
Lab. Max dry density (Ymdd ) (g/cc)
Optimum mositure content (%)
Compaction obtainted (100xYd/Ymdd) (%)
% Compaction required (%)
Remarks : Pass / Fail
Signature of Contractor Signature of Client
FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
KEC-WATERLEAU QP.No-1 and Intermediate Sewage pumping Station and Pumping
(JV) REV.no-0 Mains at Sadarmangala
FIELD DENSITY TEST (SAND REPLACEMENT METHOD)
As per IS 2720 (Part 28)
RFI No. : Date :
Representing test chainage From : To:
Test pit chainage
Offset (m)
Layer No. or level
Depth of Hole (mm)
Source of Material (name & chainage)
FIELD DENSITY
Pouring Cylinder No.
wt. of wet matreial from hole (Ww) (g)
wt. of sand+cylinder before pouring (W1) (g)
wt. of sand+cylinder after pouring (W2) (g)
wt. of sand in cone (W3) (g)
wt. of sand in hole (W4=W1-W2-W3) (g)
Bulk density of sand (Ys) (g/cc)
Bulk density of material {Yb=(Ww/W4)XYs} (g/cc)
MOISTURE CONTENT (By Speedy moisture method)
Speedy Moisture meter no.
Moisture meter reading (%)
Corrected moisture content (w) (%)
RESULTS
Field max.dry density {Yd=100XYb/(100+W)} (g/cc)
Lab. Max dry density (Ymdd ) (g/cc)
Optimum mositure content (%)
Compaction obtainted (100xYd/Ymdd) (%)
% Compaction required (%)
Remarks : Pass / Fail
Signature of Contractor Signature of CCD Signature of FQA
FIELD Quality plan
Sewage Treatment Plants at Doddabele,Yellamalappachetty
QP.No-1 REV.no- and Intermediate Sewage pumping Station and Pumping Mains at
KEC-WATERLEAU (JV) 0 Sadarmangala
SUMMARY SHEET OF SOIL TEST RESULT
BA ID No.: Estimated Qty. m3 :
Location: Village:
Sample Grain Size Analysis Gravel Sand Silt & Free Swell Atterbergs limits Proctor Test
No. 37.5 19 4.75 2 42.5 75 as per Content Clay as Index of IS : 2720 - Part 5 IS : 2720 - Part 8
mm mm mm mm mm mm IS : 2720 IS : 2720 Per Soil LL PL PI MDD OMC
Part 4 Part 4 IS : 2720 IS : 2720 (%) (%) (%) (gm/cc) (%)
Part 4 Part 40
Remarks :
Signature of Contractor Signature of Client
(TOTEM Infrastructure Ltd) (NTPC Ltd)
tty
ains at
Remarks