0% found this document useful (0 votes)
759 views9 pages

Tangled Wires in Tarlac City

This research capsule proposal outlines a study on tangled overhead wires in Tarlac City, Philippines. The proposal seeks to create a documentary that identifies issues caused by tangled wires, promotes awareness of related problems like power outages, and encourages solutions such as underground cabling. The 6-month study will utilize observation, research, interviews and documentation to understand the importance of orderly wires and reduce accidents from wire collisions. The expected output is a documentary that can help address threats to citizen welfare from the tangled wires.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
759 views9 pages

Tangled Wires in Tarlac City

This research capsule proposal outlines a study on tangled overhead wires in Tarlac City, Philippines. The proposal seeks to create a documentary that identifies issues caused by tangled wires, promotes awareness of related problems like power outages, and encourages solutions such as underground cabling. The 6-month study will utilize observation, research, interviews and documentation to understand the importance of orderly wires and reduce accidents from wire collisions. The expected output is a documentary that can help address threats to citizen welfare from the tangled wires.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

(The following is to be filled in by the

University Research Office)


Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:

RESEARCH CAPSULE PROPOSAL

1. BASIC INFORMATION
TITLE OF THE PROJECT
Spaghetti Wires

Name of Lead Researcher/Project Leader: Tabag, Vianca Lorraine


Department/Office/College: Communication Department- College of Arts and Social Sciences
Contact Number: 0906-4211-545
E-mail Address: [email protected]
Name of Co-Researcher: Maglanoc, Rolando Luis

Department/Office/College: Communication Department- College of Arts and Social Sciences


Contact Number: 0935-417-5212
E-mail Address:
Name of Co-Researcher: Prencina, Glenn Lawrence
Department/Office/College: Communication Department- College of Arts and Social Sciences
Contact Number: 0946-687-3187
E-mail Address: [email protected]

(Expand as needed for more researchers)


** Please attach Researchers Profile Form No. TSU-URO-SF-03 for each researcher.

IMPLEMENTING UNITS
Name of Lead Implementing Unit Tarlac State University- College of Arts and Social Sciences- Communication Department
Address (es): Romulo Boulevard, Tarlac City

Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 1 of 9
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:

Name of Collaborating Agency (ies), if any:


Address (es):
2. TECHNICAL DESCRIPTION OF THE PROJECT
DESCRIPTION OF THE PROJECT Evaluators Input:
The t Introduction

A utility pole is a column or post used to support overhead power lines and other public utilities,

such as electrical cable, fibre optic cable, and related equipment such as transformers and street lights. A

typical utility pole supports three facilities: electric power, cable television, and telephone. Some utility

poles also support all manner of other devices: streetlights, signs, traffic signals, seasonal decorations, fire

and police call boxes, antennas, municipal communications systems, OPGW (optical ground wire) fire-

and police-alarm signal wiring.

This documentary focuses on the issue of cable wirings covering our skylines in black spaghetti.

And apart from their ugliness, the tangled mess of overhead power lines, phone and television cables in

Tarlac continues to pose a threat to city residents. Traffic cables in front roads have caused tremendous

traffic congestion on the road. And electric poles holding hundreds of heavy, tangled wires are common

in many streets around the city of Tarlac.

Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 2 of 9
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:

RATIONALE Evaluators Input:


This proposed study seeks to come up with a documentary that solve problems about the overhead

tangled wires in Tarlac City as well as to emphasize the various threats to the welfare of the citizens. The

documentary then maybe used as a way to lessen accidents in relation with tangled wires.

PROJECT DURATION (No. of months) LOCATION


6 months Tarlac

OBJECTIVES (State general and specific objectives, purpose of the Evaluators Input:
Study including problems intended to be solved, hypotheses to be tested, etc.)

Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 3 of 9
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:

General Objectives:
This study aims to uncover solutions for the overhead tangled wires in Tarlac City

Specific Objective:

1. To identify the importance of having orderly overhead wires


2. To promote awareness about frequent blackouts and power cuts due to tangled wires especially
among urban areas
3. To reduce collision of cars and utility poles
4. To develop appealing roads which do not block great structures
5. To encourage the government to engage in underground cabling

REVIEW OF RELATED LITERATURE/STUDIES Evaluators Input:

METHODOLOGY Evaluators Input:


This study will utilize various data gathering methods such as observation, research, interview and

documentation. These methods will be of big help in gathering information to support the study.

Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 4 of 9
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:

REFERENCE Evaluators Input:

http://www.sunstar.com.ph/cagayan-de-oro/local-news/2017/02/02/removal-spaghetti-wires-
starts-february-523420
https://www.quora.com/Why-do-utility-poles-have-so-many-wires-in-developing-countries

EXPECTED OUTPUT Evaluators Input:


By the end of this research we expect the output to be a documentary about uncovering solutions of tangled
wires in Tarlac.

GAINS OR IMPACT (A compelling effect of the project upon Evaluators Input:


an individual or society as a whole)

The documentary may be used by the provincial government of Tarlac and Department of Energy
which may be used to lessen tangled wires and accidents.

INTENDED USERS OF FINDINGS AND OUTPUTS Evaluators Input:

Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 5 of 9
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:

Department of Energy
Provincial government of Tarlac

PROJECT COST (LINE ITEM BUDGET)

A. Communication cost
Item description/ Specification Unit (pcs, pax, kilo, etc) Quantity Unit cost Total cost
n/a

TOTAL COST FOR COMMUNICATION

B. TRANSPORTATION COST
Item description/ Specification Unit (pcs, pax, kilo, etc) Quantity Unit cost Total cost
n/a

TOTAL COST FOR TRANSPORTATION

C. HARDWARE/EQUIPMENT COST

Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 6 of 9
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:

Item description/ Specification Unit (pcs, pax, kilo, etc) Quantity Unit cost Total cost
n/a

TOTAL COST FOR HARDWARE/EQUIPMENTS

D. PERSONNEL SERVICES
Personnel in-need No. of personnel Total hours to Rate/hour Total cost
render
n/a

TOTAL COST FOR PERSONNEL SERVICES


*Personnel in-need: Enumerators, Laborer, Technical person, etc.

TIMELINE OF ACTIVITIES

Activity Major/ Anticipated results Resources required Schedule of activities Remarks


no. Sub-activity (Gantt Chart)
1 2 3 4 5 6 n
What you intend to do What is the fruit of What do you need to
the effort accomplish the
plans
Researching on existing cable Data on Tangled Records from DOE;
installations of Tarlac City Wires LGU reports of
installation
Site visits to different accidental Video and Transportation,
poles interview / filming equipment,
meetings with recording devices

Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 7 of 9
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:

individuals
directly associated
with the support
and advancement
of these sites
Scriptwriting for the script Video Clips
documentary Recording devices
Computers
TV video player
Recording of the voiceover for the Voice recoding Video Clips
documentary Recording devices
Computers
TV video player
Editing of the final documentary Finished Video Clips
documentary Recording devices
Computers
TV video player
3. CERTIFICATION
I hereby certify that the information given is true, correct and the research being conducted is authentic. I further signify my commitment to revise the paper as
per evaluation results and complete the research within the specified timeframe.

___________________________________ ______________
Signature over Printed Name of the Lead Researcher Date

___________________________________ ______________
Signature over Printed Name of the Co-Researcher Date

___________________________________ ______________
Signature over Printed Name of the Co-Researcher Date

4. ENDORSEMENT FROM COLLEGE TO UREC

Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 8 of 9
(The following is to be filled in by the
University Research Office)
Form No.: TSU-URO-SF-01
Filing Date:
Date of Receipt:

Please check box indicating your response : Approved Disapproved


If disapproved, state the reason/s hereof____________________________________.

______________________ _______________________ _______________________ ____________________ _______________ _________________________

Department Research Chairpersons College Dean/Head of Office

________ ________
Date Date

Received Proposal By:

_____________________________ _______________ __________


Signature over Printed Name of URO Representative Position/Designation Date Received

Form No.: TSU-URO-SF-01 Revision No.: 01 Effectivity Date: September 12, 2017 Page: 9 of 9

You might also like