Transformer Differential Protection Test Report

1. This document summarizes test results for a GE T60-220kV transformer for Ramagundam Fertilizers and Chemicals Ltd. 2. Key tests performed include measurement checks with symmetrical current and voltage injection, pickup testing, stability and unstability testing, and slope1 and slope2 testing to check the transformer protection relay settings. 3. All tests were witnessed by representatives from L&T, Engineers India Ltd., and Ramagundam Fertilizers and witnessed the tests and confirmed that the results met expectations.

Uploaded by

Jayamkondan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
383 views7 pages

Transformer Differential Protection Test Report

1. This document summarizes test results for a GE T60-220kV transformer for Ramagundam Fertilizers and Chemicals Ltd. 2. Key tests performed include measurement checks with symmetrical current and voltage injection, pickup testing, stability and unstability testing, and slope1 and slope2 testing to check the transformer protection relay settings. 3. All tests were witnessed by representatives from L&T, Engineers India Ltd., and Ramagundam Fertilizers and witnessed the tests and confirmed that the results met expectations.

Uploaded by

Jayamkondan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

TESTING FORMAT FOR TRANSFORMER

DIFFERENTIAL PROTECTION RELAY

PROJECT :REVIVAL OF RAMAGUNDAM FERTILIZER PLANT

NAME OF WORK :220 KV SWITCHYARD PACKAGE

JOB NO :A747

LOA NO : SKS/A747/LOA/T/0015/1016/2016 – 17/05 dtd. 09/11/2016

DOC NO : L&T/RFCL/A747/ELE/TF 22

OWNER :M/S RAMAGUNDAM FERTILESERS AND CHEMICALS LTD.

CONSULTANT :M/S ENGINEERS INDIA LTD.

CONTRACTOR :M/S L&T

Test Performed by;GE Witnessed by; L&T Witnessed by; EIL Witnessed by; RFCL
T&D
Name: SUMAN Name:YASWANTH Name:SOMYAKAR / Name: AMOL SONARE
KOGANTI PRANAVA RAI
Signature & Signature & Signature & Signature &
Date Date Date Date
TEST REPORT FOR GE T60-220KV SIDE 50 MVA TRANSFORMER NO.2
Customer : M/s L&T Electrical & Automation Date : 19-12-2017
Model No : T60T03HCHFQLH6DM8NP67U67W5F Aux.voltage:220 V DC
Serial No : ABHC17000971 Frequency : 50 Hz
Panel Ref : 220/33KV TRAFO-1 & 204RP
Test set : Omicron CMC 256 SERIAL :SK169V CALIBRATION DUE DATE:27-JUN-18

CT Details:
CT RATIO (Amps) 150/1A(HV)-1000/1A(LV)
VT RATIO (Volts) 220KV/110V

1. MEASUREMENT CHECK:

 3φ - symmetrical rated Current injected in all phases & measurements checked.

HV Side Current HV Side Current LV Side Current LV Side Current


Phase Injected
Injected Measured Injected
Mag Ang Mag Ang Mag Ang Mag Ang
R 1A 0° 149.8A 0° 1A 180° 1000.1A 180°
Y 1A 240° 149.93A 240° 1A 60° 1000.1A 60°
B 1A 120° 149.9A 120° 1A 300° 1000.2A 300°
N - - - -
+ve Sequence - - 149.8A - - 1000.1A
-ve Sequence - - 0 - - 0
Zero Sequence - - 0 - - 0

Test Performed by;GE Witnessed by; L&T Witnessed by; EIL Witnessed by; RFCL
T&D
Name: SUMAN Name:YASWANTH Name:SOMYAKAR / Name: AMOL SONARE
KOGANTI PRANAVA RAI
Signature & Signature & Signature & Signature &
Date Date Date Date
 3φ - symmetrical rated voltage injected in all phases & measurements checked.

Injected Voltage Measured Voltage


Phase Ph-Ph Ph-E Ph-Ph
Ph-E
R 63.5V 110V 127.2KV 220.10KV
Y 63.5V 110V 127.21KV 220.20KV
B 63.5V 110V 127.21KV 220.21KV
N - - -
+Ve Sequence - - 127.21KV 220.21KV
-Ve Sequence - - - -
Zero Sequence - - - -

REMARKS: Measurement Checked O.K

PERCENT DIFFERENTIAL SETTINGS


PERCENT DIFFERENTIAL PICKUP 0.25PU
PERCENT DIFFERENTIAL SLOPE1 25%
PERCENT DIFFERENTIAL BREAK1 2 PU
PERCENT DIFFERENTIAL BREAK2 8 PU
PERCENT DIFFERENTIAL SLOPE2 98%
ND
2 HARMONIC INRUSH INHIBIT LEVEL 20%
2ND HARMONIC INRUSH INHIBIT MODE PER PHASE
2ND HARMONIC INRUSH INHIBIT FUNCTION TRADITIONAL
OVEREXCITN INHIBIT FUNCTION 5TH
OVEREXCITN INHIBIT LEVEL 30%
INST DIFFERENTIAL PICKUP 8 PU

Test Performed by;GE Witnessed by; L&T Witnessed by; EIL Witnessed by; RFCL
T&D
Name: SUMAN Name:YASWANTH Name:SOMYAKAR / Name: AMOL SONARE
KOGANTI PRANAVA RAI
Signature & Signature & Signature & Signature &
Date Date Date Date
2. PICKUP TEST:
 HV SIDE

HV SIDE PICKUP(A) LV SIDE PICKUP(A) TRIP TIME


Phase R Y B R Y B in ms
R 0.375∟0 0∟-120 0∟120 0 0 0 25.4
Y 0∟0 0.375∟-120 0∟120 0 0 0 30.02
B 0∟0 0∟-120 0.375∟120 0 0 0 35.04
RYB 0.201∟0 0.201∟-120 0.201∟120 0 0 0 30.2
 LV SIDE

HV SIDE PICKUP(A) LV SIDE PICKUP(A) TRIP TIME


Phase R Y B R Y B in ms
R 0 0 0 0.375∟180 0∟60 0∟300 34.90
Y 0 0 0 0∟180 0.375∟60 0∟300 25.80
B 0 0 0 0∟180 0∟60 0.375∟300 35.70
RYB 0 0 0 0.201∟180 0.201∟60 0.201∟300 26.20

REMARKS: PICKUP TEST CHECKED OK

3. STABILITY TEST:

Phase HV SIDE(A) LV SIDE(A)


R 0.874∟0 0.874∟180
No Trip
Y 0.874∟-120 0.874∟60
B 0.874∟120 0.874∟300
REMARKS: STABILITY TEST CHECKED OK

Test Performed by;GE Witnessed by; L&T Witnessed by; EIL Witnessed by; RFCL
T&D
Name: SUMAN Name:YASWANTH Name:SOMYAKAR / Name: AMOL SONARE
KOGANTI PRANAVA RAI
Signature & Signature & Signature & Signature &
Date Date Date Date
4. UNSTABILITY TEST:

Phase HV SIDE(A) LV SIDE(A)


Trip at
R 0.874∟0 0.874∟0
29.70ms
Y 0.874∟-120 0.874∟-120
B 0.874∟120 0.874∟120
REMARKS: UNSTABILITY CHECKED OK

5. SLOPE1 TEST:

Phase HV SIDE (A) LV SIDE (A) ID IR %SLOPE=(ID/IR)*100


R 1.174∟0 0.874∟180 0.285 1.158 TRIP AT
Y 1.174∟-120 0.874∟60 0.285 1.158 (0.285/1.158)*100=24.6% 31.2mS
B 1.174∟120 0.874∟300 0.285 1.158
REMARKS: SLOPE 1 TEST CHECKED OK
6. SLOPE2 TEST:

Phase HV SIDE (A) LV SIDE (A) ID IR %SLOPE=(ID/IR)*100


R 8.128∟0 7.10∟180 7.96 8.128 TRIP AT
Y 8.128∟-120 7.10∟60 7.96 8.128 (7.96/8.128)*100=97.93% 26.6mS
B 8.128∟120 7.10∟300 7.96 8.128
REMARKS: SLOPE 2 TEST CHECKED OK

Test Performed by;GE Witnessed by; L&T Witnessed by; EIL Witnessed by; RFCL
T&D
Name: SUMAN Name:YASWANTH Name:SOMYAKAR / Name: AMOL SONARE
KOGANTI PRANAVA RAI
Signature & Signature & Signature & Signature &
Date Date Date Date
7. SECOND HARMONICS BLOCKING:

Phase HV SIDE (A) HV SIDE (A) HARMONICS BLOCKING

R 1∟0 at 50Hz 0.180∟0 at 100Hz


Y 1∟-120 at 50Hz 0.180∟-120 at 100Hz 18% ~ 20%
B 1∟120 at 50Hz 0.180∟120 at 100Hz

*REMARKS: Above 20% Differential Blocked


8.FIFTH HARMONICS BLOCKING:

Phase HV SIDE (A) HV SIDE (A) HARMONICS BLOCKING

R 1∟0 at 50Hz 0.290∟0 at 250Hz


Y 1∟-120 at 50Hz 0.290∟-120 at 250Hz 29% ~ 30%
B 1∟120 at 50Hz 0.290∟120 at 250Hz

*REMARKS: Above 30% Differential Blocked


9. VOLTZ PER HZ STAGE-1 PROTECTION:

VOLTZ/HZ-1 CHARACTERISTICS: PICKUP, V =1.1pu, SETTING TIME, T = 10s

Phase HV SIDE (V) HV SIDE (HZ)


R 69.85∟0 50 ALARM
Y 69.85∟-120 50 AT 10.31S
B 69.85∟120 50

Test Performed by;GE Witnessed by; L&T Witnessed by; EIL Witnessed by; RFCL
T&D
Name: SUMAN Name:YASWANTH Name:SOMYAKAR / Name: AMOL SONARE
KOGANTI PRANAVA RAI
Signature & Signature & Signature & Signature &
Date Date Date Date
10. VOLTZ PER HZ STAGE-2 PROTECTION:

VOLTZ/HZ-2 CHARACTERISTICS: PICKUP, V =1.2pu, SETTING TIME, Inverse A, TD= 1s

Phase HV SIDE (V) HV SIDE (HZ)


R 76.2∟0 50 TRIP AT 1.128s
Y 76.2∟-120 50
B 76.2∟120 50

11.LBB PROTECTION TEST:


SETTING:(STAGE-1)
I < : 0.200A
TIME DELAY : 0.200SEC

PHASE INJECTED CURRENT(A) TRIPING TIME(Sec)


R 0.211 0.231
Y 0.210 0.228
B 0.210 0.230

BINARY INPUT / OUTPUT / LED Check:


 Binary Input Check: OK
 Binary Output Check: OK
 LED Check: OK
 LBB Initiation Check :OK
Above Functions are found ok.

Test Performed by;GE Witnessed by; L&T Witnessed by; EIL Witnessed by; RFCL
T&D
Name: SUMAN Name:YASWANTH Name:SOMYAKAR / Name: AMOL SONARE
KOGANTI PRANAVA RAI
Signature & Signature & Signature & Signature &
Date Date Date Date