Penawaran Harga Ded Revisi

This document provides a cost estimate for a laboratory development building planning project. It lists the personnel needed including engineers and support staff, and estimates their monthly costs. It also estimates non-personnel costs such as communication, surveying land, office supplies, and reporting costs like drafting initial and final reports. The total estimated cost for personnel is Rp. 38,250,000 and non-personnel costs are estimated at Rp. 9,545,000, for a total project cost estimate of Rp. 47,795,000.

Uploaded by

Hendri Komara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
93 views1 page

Penawaran Harga Ded Revisi

This document provides a cost estimate for a laboratory development building planning project. It lists the personnel needed including engineers and support staff, and estimates their monthly costs. It also estimates non-personnel costs such as communication, surveying land, office supplies, and reporting costs like drafting initial and final reports. The total estimated cost for personnel is Rp. 38,250,000 and non-personnel costs are estimated at Rp. 9,545,000, for a total project cost estimate of Rp. 47,795,000.

Uploaded by

Hendri Komara
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Harga Perkiraan Sendiri (HPS)

Pekerjaan Perencanaan Pengembangan Gedung Laboratorium


Balai Pengujian ESDM

JUMLAH JUMLAH ORANG / HARGA JUMLAH


NO POSISI
ORANG BULAN BULAN SATUAN (Rp.) HARGA (Rp.)

1. BIAYA PERSONIL
A. Tenaga Ahli
1 Team Leader (Ahli Arsitektur/Sipil) S1, 1-4 tahun 1 1,5 1,5 5.500.000,00 8.250.000,00
2 Tenaga Ahli Arsitektur (S1, 1-2 tahun) 1 1,5 1,5 4.000.000,00 6.000.000,00
3 Tenaga Ahli Sipil (S1, 1-2 tahun) 1 1,5 1,5 4.000.000,00 6.000.000,00
B. Tenaga Pendukung
1 Estimator 1 1,5 1,5 2.000.000,00 3.000.000,00
2 Surveyor 2 1,5 3 2.000.000,00 6.000.000,00
3 Drafter CAD 1 1,5 1,5 2.000.000,00 3.000.000,00
4 Operator Komputer 1 1,5 1,5 2.000.000,00 3.000.000,00
5 Pelaksana Administrasi 1 1,5 1,5 2.000.000,00 3.000.000,00

Sub Jumlah A. 38.250.000,00

2. BIAYA NON PERSONIL


A. Biaya Komunikasi & Dokumentasi 1 1,5 1,5 600.000,00 900.000,00
B. Biaya Penyelidikan Tanah 3 Titik 3 1.000.000,00 3.000.000,00
C. Biaya ATK
1 Tinta printer deskjet warna 2 buah 2 315.000,00 630.000,00
2 Tinta printer laserjet 3 buah 3 450.000,00 1.350.000,00
3 Kertas HVS 80 gr F4 1 rim 1 36.000,00 36.000,00
4 Kertas HVS 80 gr A4 1 rim 1 34.000,00 34.000,00
5 Kertas HVS 80 gr A3 1 rim 1 55.000,00 55.000,00
6 CD-Blank + Cover 20 bh 20 3.000,00 60.000,00
7 Balpoint 1 Pak 1 25.000,00 25.000,00
8 Pensil 2 Pak 2 30.000,00 60.000,00
9 Map Snelhecter plastik 3 Pak 3 30.000,00 90.000,00
10 Spidol 1 dus 1 25.000,00 25.000,00
11 Stapler 1 dus 1 15.000,00 15.000,00
12 Penjepit kertas 3 dus 3 5.000,00 15.000,00

D. Biaya Pelaporan
1 Laporan pendahuluan 1 2 2 125.000,00 250.000,00
2 Laporan Akhir (Draft) 2 1 2 125.000,00 250.000,00
3 Laporan Akhir (Final) 2 1 2 125.000,00 250.000,00
4 Biaya pembahasan laporan / presentasi 2 1 2 1.250.000,00 2.500.000,00

Sub Jumlah B. 9.545.000,00


Jumlah (A+B) 47.795.000,00